Search NASA⌕ Search

SEARCH · Search NASA

Results for “look-ahead contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Probabilistic Look-ahead Contingency Analysis Integrated with GE EMS Tool

This report documents implementation of the smart sampling-based probabilistic look-ahead contingency analysis algorithm, the integration with General Electric (GE) Grid Solutions’ commercial energy management system (EMS) tool, and the case study results using real world data from the Bonneville Power Administration (BPA).The probabilistic look-ahead contingency analysis algorithm incorporates forecast errors of renewable energy and load into contingency analysis functions to enable a predictive capability with a more complete picture, revealing the potential violations that are not normally detected by traditional deterministic approaches. To test its performance under practical environments, the probabilistic look-ahead contingency analysis algorithm has been integrated with the dominant GE EMS tool as a proof-of-concept for a seamless integration. To meet the output format of GE EMS tool, an extreme value distribution (EVD) algorithm is newly adapted to analyze the GE EMS’s violation-only output. Real world data from BPA are used to test its performance, and the results clearly show the effectiveness of the developed algorithm and improved situational awareness. This effort is an example of successful technology transition and cooperation under a real-world environment because it is a joint effort from department of energy, a national laboratory, a commercial vendor, and a large utility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Look-ahead Contingency Analysis Integration with Commercial Tool and Practical Data

This paper presents an initial effort of integrating a smart sampling-based probabilistic look-ahead contingency analysis algorithm with General Electric (GE) Grid Solutions’ commercial energy management system (EMS) tool as a proof-of-concept for a seamless research tool integration using real world large-scale grid data. With the increasing impact of random forces such as variable generation and load, their stochastic behaviors cannot be ignored. However, the current practices are still dominated by deterministic tools. They are becoming increasingly inadequate for the future grid. The developed look-ahead contingency analysis algorithm incorporates forecast errors of variable energy and load to address the challenges brought by the increasing uncertainty of power system. The algorithm can reveal the potential violations caused by the variance of variable energy and load that are not normally detected by traditional deterministic approaches. To test its performance under practical environments ( real data with real commercial tool), significant efforts have been made to prepare test cases, modify GE EMS tool, and adapt an extreme value distribution algorithm to analyze the GE EMS’s violation-only outputs. The test results clearly demonstrate the effectiveness of the developed algorithm as new transformer violations that were not previously detected have been identified. This performance provides better situational awareness to engineers for their decision-making process under uncertainty. Moreover, with the discussion of computational performance and future work, this paper has shown a clear path for integrating the probabilistic algorithm with commercial tools to make us better equipped for the changing power system.

Modeling and simulation of power systems, constrai↗

Smart Sampling and HPC-based Probabilistic Look-ahead Contingency Analysis Implementation and its Evaluation with Real-world Data

This paper describes a probabilistic look-ahead contingency analysis application that incorporates smart sampling and high-performance computing (HPC) techniques. Smart sampling techniques are implemented to effectively represent the structure and statistical characteristics of uncertainty introduced by different sources in the power system. They can significantly reduce the data set size required for multiple look-ahead contingency analyses, and therefore reduce the time required to compute them. High-performance-computing (HPC) techniques are used to further reduce computational time. These two techniques enable a predictive capability that forecasts the impact of various uncertainties on potential transmission limit violations. The developed package has been tested with real world data from the Bonneville Power Administration. Case study results are presented to demonstrate the performance of the applications developed.

high performance computing↗

Transforming Power Grid Operations via High Performance Computing

Past power grid blackout events revealed the adequacy of grid operations in responding to adverse situations partially due to low computational efficiency in grid operation functions. High performance computing (HPC) provides a promising solution to this problem. HPC applications in power grid computation also become necessary to take advantage of parallel computing platforms as the computer industry is undergoing a significant change from the traditional single-processor environment to an era for multi-processor computing platforms. HPC applications to power grid operations are multi-fold. HPC can improve today’s grid operation functions like state estimation and contingency analysis and reduce the solution time from minutes to seconds, comparable to SCADA measurement cycles. HPC also enables the integration of dynamic analysis into real-time grid operations. Dynamic state estimation, look-ahead dynamic simulation and real-time dynamic contingency analysis can be implemented and would be three key dynamic functions in future control centers. HPC applications call for better decision support tools, which also need HPC support to handle large volume of data and large number of cases. Given the complexity of the grid and the sheer number of possible configurations, HPC is considered to be an indispensible element in the next generation control centers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Capturing Dynamics in the Power Grid: Formulation of Dynamic State Estimation through Data Assimilation

With the increasing complexity resulting from uncertainties and stochastic variations introduced by intermittent renewable energy sources, responsive loads, mobile consumption of plug-in vehicles, and new market designs, more and more dynamic behaviors are observed in everyday power system operation. To operate a power system efficiently and reliably, it is critical to adopt a dynamic paradigm so that effective control actions can be taken in time. The dynamic paradigm needs to include three fundamental components: dynamic state estimation; look-ahead dynamic simulation; and dynamic contingency analysis (Figure 1). These three components answer three basic questions: where the system is; where the system is going; and how secure the system is against accidents. The dynamic state estimation provides a solid cornerstone to support the other 2 components and is the focus of this study.

97 MATHEMATICS AND COMPUTING↗