Search NASA⌕ Search

SEARCH · Search NASA

Results for “magnetic cleanliness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Magnetic cleanliness verification approach on tethered satellite

Magnetic cleanliness testing was performed on the Tethered Satellite as the last step of an articulated verification campaign aimed at demonstrating the capability of the satellite to support its TEMAG (TEthered MAgnetometer) experiment. Tests at unit level and analytical predictions/correlations using a dedicated mathematical model (GANEW program) are also part of the verification activities. Details of the tests are presented, and the results of the verification are described together with recommendations for later programs.

Messidoro, Piero↗

An Approach to Magnetic Cleanliness for the Psyche Mission

In this paper we describe the derivation of these requirements, test and analyses methods, and more generally the processes and procedures that govern the magnetics program for Psyche. The paper concludes with a discussion of the challenges and work to go and a comparison with the magnetic control processes of other missions with similar magnetic cleanliness constraints.

de Soria-Santacruz Pich, Maria↗

Magnetic Testing, and Modeling, Simulation and Analysis for Space Applications

The Aerospace Corporation (Aerospace) and Lockheed Martin Space Systems (LMSS) participated with Jet Propulsion Laboratory (JPL) in the implementation of a magnetic cleanliness program of the NASA/JPL JUNO mission. The magnetic cleanliness program was applied from early flight system development up through system level environmental testing. The JUNO magnetic cleanliness program required setting-up a specialized magnetic test facility at Lockheed Martin Space Systems for testing the flight system and a testing program with facility for testing system parts and subsystems at JPL. The magnetic modeling, simulation and analysis capability was set up and performed by Aerospace to provide qualitative and quantitative magnetic assessments of the magnetic parts, components, and subsystems prior to or in lieu of magnetic tests. Because of the sensitive nature of the fields and particles scientific measurements being conducted by the JUNO space mission to Jupiter, the imposition of stringent magnetic control specifications required a magnetic control program to ensure that the spacecraft's science magnetometers and plasma wave search coil were not magnetically contaminated by flight system magnetic interferences. With Aerospace's magnetic modeling, simulation and analysis and JPL's system modeling and testing approach, and LMSS's test support, the project achieved a cost effective approach to achieving a magnetically clean spacecraft. This paper presents lessons learned from the JUNO magnetic testing approach and Aerospace's modeling, simulation and analysis activities used to solve problems such as remnant magnetization, performance of hard and soft magnetic materials within the targeted space system in applied external magnetic fields.

magnetics↗

Summary of Space Environment Magnetometer and Particle Replacement Experiment (SEMPRE) Study

As part of the GOES-R series follow on architecture study following the NOAA Satellite Observing System Architecture (NSOSA) study, a study team evaluated the feasibility of accommodating the GOES in-situ instruments (Magnetometer and Particle Detectors) on a dedicated spacecraft with no impact to the overall baseline mission cost assuming two large observatories. The accommodations cost on a primary operational type observatory are non-negligible requiring: a large non-magnetic boom to reduce the impact of the spacecraft interference on the magnetometer; and strict contamination control and magnetic cleanliness to prevent magnetic contamination near the magnetometers. These, along with the additional interface complexities greatly increase the cost of larger spacecraft by extending integration time with a large marching army. By contrast, a dedicated mission provides flexibility in location and refresh rate not afforded when these sensors are launched as secondary payloads. This study performed an informal industry survey of small form-factor instruments currently flying or in process of being developed. The study identified three potential particle detector suites and multiple magnetometers that will satisfy the requirements while having low enough volume and mass to allow accommodation on a rideshare class spacecraft. Using the largest of the identified particle detector suites, the Goddard Space Flight Center Mission Design Lab developed a design for a rideshare spacecraft that will accommodate the particle detector suite and magnetometer. The cost of the spacecraft, based on multiple cost models, is comparable to the cost of accommodating the magnetometer and particle detector suite on two (East and West) larger main observatories.

Todirita, Monica↗

The Magnetospheric Multiscale Magnetometers

The success of the Magnetospheric Multiscale mission depends on the accurate measurement of the magnetic field on all four spacecraft. To ensure this success, two independently designed and built fluxgate magnetometers were developed, avoiding single-point failures. The magnetometers were dubbed the digital fluxgate (DFG), which uses an ASIC implementation and was supplied by the Space Research Institute of the Austrian Academy of Sciences and the analogue magnetometer (AFG) with a more traditional circuit board design supplied by the University of California, Los Angeles. A stringent magnetic cleanliness program was executed under the supervision of the Johns Hopkins University,s Applied Physics Laboratory. To achieve mission objectives, the calibration determined on the ground will be refined in space to ensure all eight magnetometers are precisely inter-calibrated. Near real-time data plays a key role in the transmission of high-resolution observations stored onboard so rapid processing of the low-resolution data is required. This article describes these instruments, the magnetic cleanliness program, and the instrument pre-launch calibrations, the planned in-flight calibration program, and the information flow that provides the data on the rapid time scale needed for mission success.

Magnetosphere↗

DC Magnetics Measurement System Design

This report will detail the updates to the magnetics measurement system design and testing procedures that are required for performing static (DC) magnetics testing of future flight hardware. An older magnetics testing system had to be integrated with new procedures and hardware to meet the demands of future testing programs and accommodate an upcoming magnetics tests. The next test will be for the Geostationary Operational Environmental Satellite R-Series (GOES-R), which will verify that the SAFT Battery component meets its specifications for magnetic cleanliness. The satellite is scheduled to launch in 2015 with magnetics testing to be completed on the battery in November 2012.

DC magnetics↗

The Space Technology 5 Avionics System

The Space Technology 5 (ST5) mission is a NASA New Millennium Program project that will validate new technologies for future space science missions and demonstrate the feasibility of building launching and operating multiple, miniature spacecraft that can collect research-quality in-situ science measurements. The three satellites in the ST5 constellation will be launched into a sun-synchronous Earth orbit in early 2006. ST5 fits into the 25-kilogram and 24-watt class of very small but fully capable spacecraft. The new technologies and design concepts for a compact power and command and data handling (C&DH) avionics system are presented. The 2-card ST5 avionics design incorporates new technology components while being tightly constrained in mass, power and volume. In order to hold down the mass and volume, and quali& new technologies for fUture use in space, high efficiency triple-junction solar cells and a lithium-ion battery were baselined into the power system design. The flight computer is co-located with the power system electronics in an integral spacecraft structural enclosure called the card cage assembly. The flight computer has a full set of uplink, downlink and solid-state recording capabilities, and it implements a new CMOS Ultra-Low Power Radiation Tolerant logic technology. There were a number of challenges imposed by the ST5 mission. Specifically, designing a micro-sat class spacecraft demanded that minimizing mass, volume and power dissipation would drive the overall design. The result is a very streamlined approach, while striving to maintain a high level of capability, The mission's radiation requirements, along with the low voltage DC power distribution, limited the selection of analog parts that can operate within these constraints. The challenge of qualifying new technology components for the space environment within a short development schedule was another hurdle. The mission requirements also demanded magnetic cleanliness in order to reduce the effect of stray (spacecraft-generated) magnetic fields on the science-grade magnetometer.

Speer, Dave↗

The Giotto magnetic-field investigation

The objectives of the Giotto magnetometer experiment are the investigation of the interaction between Comet Halley and the solar wind 0.9 AU from the Sun, to within 500 km of the cometary nucleus, and the study of the interplanetary magnetic field. The instrumentation consists of a triaxial and a separate biaxial system of fluxgate sensors of the ring-core type, the associated analog electronics and a digital processor. The measuring ranges of + or 1 16 up to + or - 65536 nT are digitized by a 12-bit analog-to-digital converter. Memory modes allow the bridging of gaps in telemetry coverage of up to 10 days. Because of the dust hazard near closest approach, a magnetometer boom could not be included in the spacecraft design. The magnetic contamination problem was attacked by the use of two magnetometers and by a magnetic-cleanliness program. In-flight results show that the instrument is working flawlessly, though magnetic-contamination problems remain.

Neubauer, F. M.↗

Magnetic Shield Design Modeling and Validation on SWOT Spacecraft Applied to Mars Flux Pinning Orbiting Sample Design

A modeling methodology was developed for use on the Surface Water and Ocean Topography (SWOT) mission for the computational modeling and design of a magnetic shield for a 63 A-sq m source. Shield options were modeled and tested across various design parameters and validated with measurement. Measurement results fell within 10% of simulation in most cases of concern with sources of error well understood. These methods results informed a subsequent modeling activity for a future Mars Sample Return (MSR) mission concept with stringent magnetic cleanliness requirements to retain geologic integrity of the samples. One option for capturing the sample from orbit requires rare earth magnets in close proximity to the Martian samples. Magnetic modeling with a finite-element method solver estimated the magnetic environment and established the need for shielding. Further modeling then determined the shielding necessary to meet magnetic requirements, followed by the design of a mass-optimized solution.

Gonzales, Edward↗

Transformational Solar Array Option I Final Report

This report summarizes the work performed under NASA contract NNC16CA19C from May 2, 2017 through April 2, 2018. This work is directed toward meeting the goals of the associated NASA NRA and, of course, the requirements of the contract. In brief, the goals are: (1) Over 47% beginning of life cell efficiency at 5 AU and -125 °C (2) Over 32% end of life efficiency at the blanket level at 50 W m-2, -125 °C and 4E15 1 MeV e cm-2 (3) Over 8 W kg-1 at EOL for the entire array including structure, deployment, and pointing mechanisms using beginning of life performance. (4) A stowed packaging density of greater than 66 kW m-3 (5) An ability to survive launch and numerous deploy retract cycles without degradation (6) An output higher than 300 V (7) An ability to operate in a plasma generated by xenon thrusters, typically 1E8 cm-3 ions with an average energy of 2 eV (8) A design compatible with electrostatic and magnetic cleanliness (9) Record breaking inverted metamorphic (IMM) 6 junction solar cells (10) IMM solar cells that have no anomalous flat spot behavior at low irradiance and low temperature (11) A mock-up production line for the low-cost manufacture of spacecraft blanket arrays. The Option I phase of the project continued efforts, started in the base-phase, to eliminate or reduce to very low levels the flat spots that reduce power to an unacceptable value in a significant percentage of cells and to reduce outgassing contamination of the concentrators to acceptable levels. Option I adds tasks to increase the efficiency of IMM cells from those produced in the Base Phase, to eliminate delamination of the coatings that were present in previous versions of the concentrator mirrors, to evaluate pressure sensitive adhesive as a method of fixing solar cell assemblies to blankets, to design a magnetically clean brake for ROSA, to test the robustness of a sample blanket in deploy and retract, to test for the adequate performance of a blanket in vibration and thermal environments, and to define the capital equipment needed to optimize production of the Transformational Array. 5 Work for this Final Report showed that the greatest likely improvement in the solar cells would be by emphasizing the effort for the IMM4 solar cells and stopping work on other IMM cells. For this phase, the solar cell work was primarily on the IMM4 cells with little work on IMM5 and none on IMM6 cells.

Gaddy, Edward↗

Optimization of multimagnetometer systems on a spacecraft

Magnetometers on a radial boom may be employed to determine the first N-1 multipole contributions to the spacecraft field and improve the total accuracy of a magnetic field experiment. The total error for systems of one to four magnetometers is investigated. The optimal magnetometer locations, for which the total error is a minimum, are found for given boom-length, instrument errors and magnetic field models characteristic for spacecraft with only a restricted or ineffective magnetic cleanliness program.

Neubauer, F. M.↗

Multilayer flat electrical cable

Flat electrical cable is lightweight, flexible over wide temperature range, withstands continuous exposure to high levels of nuclear radiation, and can carry high currents with minimum of temperature rise. Its magnetic cleanliness is equal to or better than twisted pair of wires, and it can be terminated in conventional electrical connector.

Silverman, P. G.↗

High-power microstrip switch

Switch, which uses only two p-i-n diodes on microstrip substrate, has been developed for application in spacecraft radio systems. Switch features improved power drain, weight, volume, magnetic cleanliness, and reliability, over currently-used circulator and electromechanical switches.

Choi, S. D.↗

Optimization of multimagnetometer systems on a spacecraft

The problem of optimizing the position of magnetometers along a boom of given length to yield a minimized total error is investigated. The discussion is limited to at most four magnetometers, which seems to be a practical limit due to weight, power, and financial considerations. The outlined error analysis is applied to some illustrative cases. The optimal magnetometer locations, for which the total error is minimum, are computed for given boom length, instrument errors, and very conservative magnetic field models characteristic for spacecraft with only a restricted or ineffective magnetic cleanliness program. It is shown that the error contribution by the magnetometer inaccuracy is increased as the number of magnetometers is increased, whereas the spacecraft field uncertainty is diminished by an appreciably larger amount.

Neubauer, F. M.↗

A precision six-meter deployable boom for the Mariner-Venus-Mercury 1973 magnetometer experiment

A unique deployable boom developed for accurately positioning magnetometers 6 meters (19.7 feet) from a spacecraft is described. Weight, mounting system, magnetic cleanliness, thermal dimensional stability, and natural frequency were critical constraints that were met. The boom was flown on Mariner 10 and deployed flawlessly. The design, development, and testing of the boom and optical alignment of the sensors are described. Design trades and problem solutions are discussed.

Burdick, H. F.↗