Results for “main plant process building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

High-level waste relocation requires use of new technology in aging nuclear facility - 15269

The West Valley Demonstration Project (WVDP) is preparing to relocate 278 canisters of vitrified high-level waste (HLW) from their current location inside the Main Plant Process Building (MPPB) to an outdoor pad for long-term, on-site storage. The waste was produced at the WVDP between 1996 and 2002 and was originally placed in interim storage inside the MPPB in anticipation of off-site shipment for disposal. Relocation of the canisters to a new on-site location is now necessary as part of WVDP Phase 1 Site Decommissioning work to enable pre-demolition activities inside the MPPB to proceed. The logistics of packaging and moving the HLW canisters within an aging facility to another on-site location has provided numerous technical challenges with subsequent innovations. Significant preparations have taken place to resolve structural inadequacies, including sub-surface soil subsidence issues, antiquated equipment, and facility reconfigurations to support up to 134 metric ton (148 ton) loads. To perform the transfer and storage of the HLW canisters, new equipment and fabrications were required including a robust storage system consisting of stainless steel canister overpacks within steel-reinforced concrete storage casks, three specialty cask transporters, a remotely operated welding system and construction of an outdoor engineered storage pad to store the 56 casks containing the relocated HLW canisters. Packaging and relocation of vitrified canisters is scheduled to begin in 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquid Waste Cell Decommissioning at the West Valley Demonstration Project - 16454

CH2M HILL BWXT West Valley, LLC (CHBWV) began decontamination and deactivation activities in the Liquid Waste Cell in the Main Plant Process Building (MPPB) at the West Valley Demonstration Project (WVDP) in 2013. The work is being done under CHBWV's Phase 1 Facility Disposition Contract with the U.S. Department of Energy, and is a prerequisite for demolition of the 3,716 square meter (40,000 square foot) MPPB, which is planned to begin in 2018. At the start of deactivation activities, the Liquid Waste Cell contained nine large contaminated vessels and approximately 1,220 meters (4,000 linear feet) of piping. Due to high levels of contamination and high radiation dose rates, frequent or prolonged manned entries into the cell were undesirable. CHBWV's strategy for preparing the cell for building demolition was based on conducting dose reduction and contamination stabilization activities using remotely deployed long-reach tools where possible, supported by manned entries where situations warrant or conditions were favorable. This paper discusses the conditions, challenges, decontamination approach, specialized tooling and expected end result of the Liquid Waste Cell deactivation project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2017. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2017 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2024

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2024. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2024 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

54 ENVIRONMENTAL SCIENCES↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

10 CFR 851, Worker Safety & Health Program↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Know-how and experience of the decommissioning of the Eurochemic reprocessing plant

Belgoprocess started the industrial decommissioning of the main process building of the former Eurochemic reprocessing plant in 1987. In 2008 the eastern part was torn down and in 2010 the central part of the building was removed. The demolition of the third and last part is planned in 2014. At that point the area will be restored to brown field conditions. During the 25 years of decommissioning the Eurochemic installations a lot of effort has been invested in improving the efficiency. The Belgian decommissioning policy is based on maximizing effort for decontamination with the goal of unconditional release and minimization of nuclear waste. As a result a number of installations have been implemented that reduce the processing costs, increase the output of decontamination and increase the speed of release measurements. - The abrasive blasting installation is used to remove a thin layer from metal components and concrete objects. - The concrete crushing and sampling installation is used as the final measurement before unconditional release of concrete debris. - The concrete spec installation is used to separate the contaminated part from the non contaminated part of concrete debris. As the end of the decommissioning project is approaching the time is right to look back and evaluate the course of the project. Looking back what were the key decisions during the project, what were important milestones and what could or should have been done differently knowing what we know now. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Fundamental Creep Behavior Model of Gr.91 Alloy by ICME Approach (Final Report)

The current project mainly focused on the fundamental creep cracking mechanism of the Grade 91 system during the operation conditions in the advanced technologies FE power plants and build the link among Composition-Processing Parameters-Phase Stability-Microstructure-Creep Resistance. A model based on computational thermodynamics and diffusion kinetics will be developed to provide guidance on how to improve the creep resistance of the alloy system. The PI mainly investigate the Gr.91 base alloy and weldment with the Integrated Computational Materials Engineering (ICME) approach. The long-term goal of the proposed program is to develop a model for creep and fatigue resistant alloys with different elemental systems, compositions, and processing parameters of weldment and heat-treatment. In addition, new creep and fatigue resistant alloys are to be designed based on the predictions from the model. The computational as well as experimental results include three sections: 1) The compositional optimization and secondary phases evaluation regarding the creep resistance in Grade 91 steel through the CALPHAD approach. In this section, the formation of the critical secondary phases, M23C6, MX and Z-phase were well predicted based on many conditions like the temperature as well as compositions. Meanwhile, the role of different alloying elements was also considered as they will directly affect the formation of the secondary phases mentioned above based on the compositional evolution of the alloying elements. 2) An investigation of Creep Resistance in Grade 91 Steel through Computational Thermodynamics. We systematically considered the evolution of the four critical temperatures, Ac3, Ac1, the threshold of M23C6 and Z-phase, on basis of the computational approach. Meanwhile, the equilibrium cooling as well as Scheil simulations were also considered to perform further predictions based on the different cooling rates. 3) Creep lifetime and microstructural evolution of the Grade 91 steel. In this part, mainly experimental approach was performed on the real creep test from the beginning of the commercial Gr.91 alloys. The alloys were normalized, tempered, welded (Gleeble) and PWHT and finally subjected to the creep lifetime analyses. Finally, all the samples after each process were further characterized based on the OM, XRD and SEM technique to draw final conclusions.

01 COAL, LIGNITE, AND PEAT↗

Model Predictive Control of HVAC Systems: Implementation and Testing at the University of California, Merced

A Model Predictive Control algorithm was developed for the UC Merced campus chilled water plant. Model predictive control (MPC) is an advanced control technology that has proven successful in the chemical process industry and other industries. The main goal of the research was to demonstrate the practical and commercial viability of MPC for optimization of building energy systems. The control algorithms were developed and implemented in MATLAB, allowing for rapid development, performance, and robustness assessment. The UC Merced chilled water plant includes three water-cooled chillers and a two million gallon chilled water storage tank. The tank is charged during the night to minimize on-peak electricity consumption and take advantage of the lower ambient wet bulb temperature. The control algorithms determined the optimal chilled water plant operation including chilled water supply (CHWS) temperature set-point, condenser water supply (CWS) temperature set-point and the charging start and stop times to minimize a cost function that includes energy consumption and peak electrical demand over a 3-day prediction horizon. A detailed model of the chilled water plant and simplified models of the buildings served by the plant were developed using the equation-based modeling language Modelica. Steady state models of the chillers, cooling towers and pumps were developed, based on manufacturers performance data, and calibrated using measured data collected and archived by the control system. A detailed dynamic model of the chilled water storage tank was also developed and calibrated. Simple, semi-empirical models were developed to predict the temperature and flow rate of the chilled water returning to the plant from the buildings. These models were then combined and simplified for use in a model predictive control algorithm that determines the optimal chiller start and stop times and set-points for the condenser water temperature and the chilled water supply temperature. The report describes the development and testing of the algorithm and evaluates the resulting performance, concluding with a discussion of next steps in further research. The experimental results show a small improvement in COP over the baseline policy but it is difficult to draw any strong conclusions about the energy savings potential for MPC with this system only four days of suitable experimental data were obtained once correct operation of the MPC system had been achieved. These data show an improvement in COP of 3.1% {+-} 2.2% relative to a baseline established immediately prior to the period when the MPC was run in its final form. This baseline includes control policy improvements that the plant operators learned by observing the earlier implementations of MPC, including increasing the temperature of the water supplied to the chiller condensers from the cooling towers. The process of data collection and model development, necessary for any MPC project, resulted in the team uncovering various problems with the chilled water system. Although it is difficult to quantify the energy savings resulting from these problems being remedied, they were likely on the same order as the energy savings from the MPC itself. Although the types of problems uncovered and the level of energy savings may differ significantly from other projects, some of the benefits of detecting and diagnosing problems are expected from the use of MPC for any chilled water plant. The degree of chiller loading was found to be a key factor for efficiency. It is more efficient to operate the chillers at or near full load. In order to maximize the chiller load, one would maximize the temperature difference across chillers and the chilled water flow rate through the chillers. Thus, the CHWS set-point and the chilled water flow-rate can be used to limit the chiller loading to prevent chiller surging. Since the flow rate has an upper bound and the CHWS set point has a lower bound, the chiller loading is constrained and often determined by the chilled water return temperature (CHWR). The CHWR temperature is primarily comprised of warm water from the top of the TES tank. The CHWR temperature falls substantially as the thermocline approaches the top of the tank, which reduces the chiller loading. As a result, it has been determined that overcharging the TES tank can be detrimental to the chilled water plant efficiency. The resulting MPC policy differs from the current practice of fully charging the TES tank. A heuristic rule could possible avoid this problem without using predictive control. Similarly, the COP improvements from the change in CWS set-point were largely captured by a static set-point change by the operators. Further research is required to determine how much of the MPC savings could be garnered through simplified rules (based on the MPC study), with and without prediction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗