Search NASA⌕ Search

SEARCH · Search NASA

Results for “mechanically ventilated enclosures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Development of risk mitigation guidance for sensor placement inside mechanically ventilated enclosures – Phase 1

Guidance on Sensor Placement was identified as the top research priority for hydrogen sensors at the 2018 HySafe Research Priority Workshop on hydrogen safety in the category Mitigation, Sensors, Hazard Prevention, and Risk Reduction. This paper discusses the initial steps (Phase 1) to develop such guidance for mechanically ventilated enclosures. This work was initiated as an international collaborative effort to respond to emerging market needs related to the design and deployment equipment for hydrogen infrastructure that is often installed in individual equipment cabinets or ventilated enclosures. The ultimate objective of this effort is to develop guidance for an optimal sensor placement such that, when integrated into a facility design and operation, will allow earlier detection at lower levels of incipient leaks, leading to significant hazard reduction. Reliable and consistent early warning of hydrogen leaks will allow for the risk mitigation by reducing or even eliminating the probability of escalation of small leaks into large and uncontrolled events. To address this issue, a study of a real-world mechanically ventilated enclosure containing GH2 equipment was conducted, where CFD modeling of the hydrogen dispersion (performed by AVT and UQTR, and independently by the JRC) was validated by the NREL Sensor laboratory using a Hydrogen Wide Area Monitor (HyWAM) consisting of a 10-point gas and temperature measurement analyzer. In the release test, helium was used as a hydrogen surrogate. Expansion of indoor releases to other larger facilities (including parking structures, vehicle maintenance facilities and potentially tunnels) and incorporation into QRA tools, such as HyRAM is planned for Phase 2. It is anticipated that results of this work will be used to inform national and international standards such as NFPA 2 Hydrogen Technologies Code, Canadian Hydrogen Installation Code (CHIC) and relevant ISO/TC 197 and CEN documents.

08 HYDROGEN↗

Development of Risk Mitigation Guidance for Hydrogen Sensor Placement Indoors and Outdoors

Guidance on Sensor Placement remains one of the top priorities for the safe deployment of hydrogen and fuel cell equipment in the commercial marketplace. Building on the success of Phase 1 work reported at ICHS2019 and published in IJHE, this paper discusses the consecutive steps to further develop and validate such guidance for mechanically ventilated enclosures. The key step included a more in-depth analysis of sensitivity to variation of physical parameters in a small enclosure, and finally, expansion of the developed approach to confined spaces in an outdoor environment.

codes and standards↗