TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

Young, Roy M.↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Montgomery, Edward E.↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Young, Roy M.↗

Analog/digital pH meter system I.C.

The project utilizes design automation software tools to design, simulate, and fabricate a pH meter integrated circuit (IC) system including a successive approximation type seven-bit analog to digital converter circuits using a 1.25 micron N-Well CMOS MOSIS process. The input voltage ranges from 0.5 to 1.0 V derived from a special type pH sensor, and the output is a three-digit decimal number display of pH with one decimal point.

Vincent, Paul↗

Latest Strategic Surface Metering System and Progress Status in CLT

This presentation provides description of the field evaluation of surface metering deployed by NASA in Charlotte International Airport (CLT) that began with a more tactical decision timeline and progressively expanded toward more strategic timelines. This will include an update on the latest status of the ongoing research and lessons learned.

surface metering↗

Volumetric system calibrates meters for large flow rates

Volumetric system calibrates meters used for large liquid flow rates. The system employs trip probes and equipment to time the flow of liquid from a tare vessel into a calibrated vessel. This calibration system is used in the petroleum and chemical industries.

Source record↗

Manufacturing Challenges and Benefits When Scaling the HIAD Stacked-Torus Aeroshell to a 15 Meter Class System

Over a decade of work has been conducted in the development of NASA's Hypersonic Inflatable Aerodynamic Decelerator (HIAD) deployable aeroshell technology. This effort has included multiple ground test campaigns and flight tests culminating in the HIAD project's second generation (Gen-2) aeroshell system. The HIAD project team has developed, fabricated, and tested stacked-torus inflatable structures (IS) with flexible thermal protection systems (F-TPS) ranging in diameters from 3-6 meters, with cone angles of 60 and 70 degrees. To meet NASA and commercial near-term objectives, the HIAD team must scale the current technology up to 12-15 meters in diameter. Therefore, the HIAD project's experience in scaling the technology has reached a critical juncture. Growing from a 6-meter to a 15-meter class system will introduce many new structural and logistical challenges to an already complicated manufacturing process. Although the general architecture and key aspects of the HIAD design scale well to larger vehicles, details of the technology will need to be reevaluated and possibly redesigned for use in a 15-meter-class HIAD system. These include: layout and size of the structural webbing that transfers load throughout the IS, inflatable gas barrier design, torus diameter and braid construction, internal pressure and inflation line routing, adhesives used for coating and bonding, and F-TPS gore design and seam fabrication. The logistics of fabricating and testing the IS and the F-TPS also become more challenging with increased scale. Compared to the 6-meter aeroshell (the largest HIAD built to date), a 12-meter aeroshell has four times the cross-sectional area, and a 15-meter one has over six times the area. This means that fabrication and test procedures will need to be reexamined to account for the sheer size and weight of the aeroshell components. This will affect a variety of steps in the manufacturing process, such as: stacking the tori during assembly, stitching the structural webbing, initial inflation of tori, and stitching of F-TPS gores. Additionally, new approaches and hardware will be required for handling and ground testing of both individual tori and the fully assembled HIADs. There are also noteworthy benefits of scaling up the HIAD aeroshell to a 15m-class system. Two complications in working with handmade textile structures are the non-linearity of the material components and the role of human accuracy during fabrication. Larger, more capable, HIAD structures should see much larger operational loads, potentially bringing the structural response of the material components out of the non-linear regime and into the preferred linear response range. Also, making the reasonable assumption that the magnitude of fabrication accuracy remains constant as the structures grow, the relative effect of fabrication errors should decrease as a percentage of the textile component size. Combined, these two effects improve the predictive capability and the uniformity of the structural response for a 12-15-meter HIAD. In this presentation, a handful of the challenges and associated mitigation plans will be discussed, as well as an update on current manufacturing and testing that addressing these challenges.

Infatables↗

Evaluation of Microwave Landing System (MLS) effect on the delivery performance of a fixed-path metering and spacing system

Metering and spacing (M & S) system's algorithms described assume an aircraft two dimensional are navigation capability. The three navigation systems compared were: very high frequency omnidirectional range/distance measuring equipment (VOR/DME) and ILS, VOR/DME and + or - 40 MLS, and VOR/DME and + or - 60 MLS. Other factors studied were M & S tentative schedule point location, route geometry effects, and approach gate location effects. Summarized results are: the MLS offers some improvement over VOR/DME and ILS if all approach routes contain computer assisted turns; pilot reaction to moving the gate closer to the runway threshold may adversely affect M & S performance; and coupling en route metering to terminal scheduling transfers most of the terminal holding to more full efficient, higher altitude en route delay.

Credeur, L.↗

TESTING OF A 20-METER SOLAR SAIL SYSTEM

This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program1-3. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance4. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods were evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

Gaspar, J. L.↗

TESTING OF A 20-METER SOLAR SAIL SYSTEM

This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods are evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

Gaspar, Jim L.↗

Medical evaluations on the KC-135 1990 flight report summary

The medical investigations completed on the KC-135 during FY 1990 in support of the development of the Health Maintenance Facility and Medical Operations are discussed. The experiments are comprised of engineering evaluations of medical hardware and medical procedures. The investigating teams are made up of both medical and engineering personnel responsible for the development of medical hardware and medical operations. The hardware evaluated includes dental equipment, a coagulation analyzer, selected pharmaceutical aerosol devices, a prototype air/fluid separator, a prototype packaging and stowage system for medical supplies, a microliter metering system, and a workstation for minor surgical procedures. The results of these engineering evaluations will be used in the design of fleet hardware as well as to identify hardware specific training requirements.

Lloyd, Charles W.↗

Acceleration Characteristics of R-3350 Engine Equipped with NACA Injection Impeller

Qualitative investigations have shown that use of the NACA injection impeller with the R-3350 engine increases the inertia of the fuel-injection system and, when the standard fuel-metering system is used, this increase in inertia results in poor engine acceleration characteristics. This investigation was therefore undertaken to determine whether satisfactory acceleration characteristics of the engine equipped with the injection impeller could be obtained by simple modifications to the fuel-monitoring system. The engine was operated with two types of carburetor; namely, a hydraulic-metering carburetor incorporating a vacuum-operated accelerating pump and a direct-metering carburetor having a throttle-actuated accelerating pump. The vacuum-operated accelerating pump of the hydraulic-metering carburetor was modified to produce satisfactory accelerations by supplementing the standard air chamber with an additional 75-cubic spring. The throttle-actuated accelerating pump of the direct-metering carburetor was modified to produce satisfactory accelerations by replacing the standard 0.028-inch-diameter bleed in the load-compensator balance line with a smaller bleed of 0.0225-inch diameter. The results of this investigation indicated that both carburetors can be easily modified to produce satisfactory acceleration characteristics of the engine and no definite choice between the types of carburetor and accelerating pump can be made. Use of the direct-metering carburetor, however, probably resulted in better fuel distribution to the cylinders during the acceleration period and reduced the backfire hazard because all the fuel is introduced through the injection impeller.

Hickel, Robert O.↗

Development of the Dual Aerodynamic Nozzle Model for the NTF Semi-Span Model Support System

The recent addition of a dual flow air delivery system to the NASA Langley National Transonic Facility was experimentally validated with a Dual Aerodynamic Nozzle semi-span model. This model utilized two Stratford calibration nozzles to characterize the weight flow system of the air delivery system. The weight flow boundaries for the air delivery system were identified at mildly cryogenic conditions to be 0.1 to 23 lbm/sec for the high flow leg and 0.1 to 9 lbm/sec for the low flow leg. Results from this test verified system performance and identified problems with the weight-flow metering system that required the vortex flow meters to be replaced at the end of the test.

Jones, Greg S.↗

Microcomputerized electric field meter diagnostic and calibration system

A computerized field meter calibration system which includes an apparatus for testing the calibration of field meters normally utilized for measuring electromagnetic field potentials is described. A reference voltage is applied to the field meter for causing signals to be produced on the output terminals thereof. A bank of relays is provided for selectively connecting output terminals of the field meter to a multiplexer by means of a digital voltmeter and an oscilloscope. A frequency-shift-keyed receiver is also connected to one of the terminals of the field meter for transmitting and converting a frequency shift keyed signal to a digital signal which is, subsequently, applied to the multiplexer.

Holley, L. D.↗

Icing-Protection Requirements for Reciprocating-Engine Induction System

Despite the development of relatively ice-free fuel-metering systems, the widespread use of alternate and heated-air intakes, and the use of alcohol for emergency de-icing, icing of aircraft-engine induction systems is a serious problem. Investigations have been made to study and to combat all phases of this icing problem. From these investigations, criterions for safe operation and for design of new induction systems have been established. The results were obtained from laboratory investigations of carburetor-supercharger combinations, wind-tunnel investigations of air scoops, multicylinder-engine studies, and flight investigations. Characteristics of three forms of ice, impact, throttling, and fuel evaporation were studied. The effects of several factors on the icing characteristics were also studied and included: (1) atmospheric conditions, (2) engine and air-scoop configurations, including light-airplane system, (3) type fuel used, and (4) operating variables, such as power condition, use of a manifold pressure regulator, mixture setting, carburetor heat, and water-alcohol injection. In addition, ice-detection methods were investigated and methods of preventing and removing induction-system ice were studied. Recommendations are given for design and operation with regard to induction-system design.

Coles, Willard D↗