Search NASASearch

SEARCH · Search NASA

Results for “mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

GeoStorm Beacon Design Reference Mission (DRM) and Technology Drivers

A Design Reference Mission (DRM) for a NOAA Space Weather monitoring platform that provides warning times greater than 20 minutes with a 10-year operational timeline is presented. The summary of the DRM includes technology drivers for a subscale flight demonstration to reduce risk for the operational mission.

Solar Sails

Parameterization of Nuclear Electric Propulsion Trajectories for Outer Solar System Science Missions Methodology

This manuscript addresses the methodology used to create a database of low thrust missions to outer planets. This database utilizes previous work modeling NEP systems to determine the maximum delivered mass to outer planets based on a range of mission parameters, such as time of flight, launch vehicle, and power system mass. Trajectories were selected which best utilized NEP benefits. Additionally, a discussion on the database outputs for missions to Saturn is included, such as time of flight based on trajectory type and maximum payload, given a specific launch vehicle. The purpose of this work was to create a basis for future mission design, and a tool to investigate general trends across mission options.

Outer Planets

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

NRHO

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design

Electric Propulsion for Manned Missions

Electric propulsion is of interest for manned interplanetary missions, primarily because it offers the potential of delivering and returning relatively large payload fractions from the planets. This can be achieved because of the high specific impulse obtainable when the propellant is accelerated by electrical means rather than thermally, as in chemical and nuclear rockets.

Robert J Denington

An Initial Study of Using the 34-M Antenna for Lunar Mission Support

As a part of the long-range planning of future Mars and lunar missions, a feasibility study was made of a 34-m antenna system with differentially pointed multiple beams. The performance loss mechanisms of the differentially pointed multiple-beam systems were identified and quantified. Techniques that can significantly improve the multiple-beam system performance are identified. The goal is to determine the feasibility of using the 34-m antenna to support widely separated elements associated with lunar missions.

A Cha

Battery Definition for the Mars Environmental Survey Mission (MESUR) Pathfinder

Silver-zinc (Ag-Zn) battery technology has been baselined as the energy storage system for the MESUR mission. The mission profile will require the operation of this battery in a manner not usually seen for this technology. In particular, the combination of storage time followed by multiple cycles as a function of fluctuating temperatures and charge/discharge rates, and limited available time for charging has not been previously demonstrated.

Ag-Zn

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Impact of Technology and Mission Variations on Aircraft Designed for Advanced Air Mobiity

NASA is conducting investigations in Advanced Air Mobility (AAM) aircraft and operations, including the development of Urban Air Mobility (UAM) aircraft designs that can be used to focus and guide research activities in support of AAM. This report is an investigation of the impact of technology and mission variations on several of the NASA AAM concept aircraft: quadrotor, quiet single main rotor, side-by-side, and tiltrotor configurations, with turboshaft and electric propulsion variants for each. First, the mission and aircraft models of the baseline designs were reassessed and updated, including rotor geometry optimization, update of the rotor performance models, and disk loading optimization. For these eight designs, technology and mission excursions were performed. Relative to the calibration cases that can be considered examples of good design practice, the impact of the weight technology factors is significant. For the electric aircraft, there is a very large impact of battery specific energy (Wh/kg), and correspondingly a very large impact of mission range. The vision of Advanced Air Mobility is driven by missions that will enable new transportation capabilities. Hence it is appropriate to compare Concept Vehicles of different lift and propulsive architectures, all designed to accomplish the same UAM mission. It is also useful however to consider specific missions that can take advantage of the strengths of individual aircraft configurations. So alternate designs were also developed for the concept vehicles: for turboshaft aircraft, longer unrefueled range, including faster cruise speed for the tiltrotor; for electric aircraft, shorter range and more realistic battery weight.

Technology

JPL Experience with the Mars Pathfinder, Mission Simulation Battery

A summary of the Mars Pathfinder Battery is given. The battery survived 47 days at 25 deg. C; it survived a 7 month stand at 10 to -5 deg. C; it met and exceeded 40 ampere-hour capacity for EDL; it met the 30 cycle minimum for Mars surface operation; and the project power profile for MArs surface operation does not yield energy balance.

Perrone, Dave

Science questions for the Magellan continuing mission

Magellan has completed two mapping cycles around the planet Venus, returning high resolution synthetic aperture images and altimetry data of over 95 percent of the planet's surface. Venus is dominated by low lying volcanic plains with an impact crater population indicating an average surface age of about 500 million years. Highland regions either tend to be characterized by volcanic shield complexes and rifting or by complex ridged terrain. Successful as the primary mission of Magellan has been, significant scientific questions remain to be addressed with imaging and gravity data that will be collected over the next several years.

Saunders, R. S.

Preliminary Study of a Nuclear Rocket System for Manned Planetary Missions

The primary purpose of the NERVA nuclear rocket currently under development Once developed, is to demonstrate the feasibility of nuclear rocket propulsion. Once developed, it may have application in missions such as a manned lunar landing or space station supply. Unfortunately, it is too small for manned interplanetary missions. This being the case, it was decided to examine a second-generation nuclear rocket suitable for manned interplanetary flight in order to get an idea of component characteristics and problem areas. This examination is, in general, based on current technology and includes the graphite reactor concept, a nozzle fabricated from Inconel X tubing, and conventional turbopump blading and bearings. Some of the preliminary results of this examination are reported herein.

John H Povolny

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston