Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction

Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments and mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.

42 ENGINEERING↗

Identifying Modular Construction Worker Tasks Using Computer Vision

Modular construction is increasingly being seen as an attractive method for delivering building projects due to advantages in safety, quality, and lead-time. Despite these benefits, this method still relies heavily on human labor, which causes variability in factory assembly-line performance that can erode performance benefits of modular construction. Continuous improvement methods can alleviate some of these issues, but they also require continuous monitoring of human workers' performance. Due to limitations of manual time study and automated sensor-based monitoring methods, recently computer vision-based methods have gained momentum in identifying the activities of construction workers from the videos of onsite construction. Therefore, this paper explores the use of computer vision-based human activity recognition techniques to identify and classify worker activities in modular construction videos. Computer vision-based tracking method has been used to track the human workers in each frame, and Resnet-50 network has been used to classify the activity of tracked workers. Evaluation of this framework has achieved higher than 90% accuracy and recall in testing.

computer vision↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated Assembly Progress Monitoring in Modular Construction Factories Using Computer Vision-Based Instance Segmentation

Modular construction has recently gained interest as a transformative construction method. In this method, a large portion of the construction is performed inside factories, where processes are fast-paced and interdependent; therefore, any deviation from the schedule can delay the production. Such deviations are frequent in modular factories due to the labor-intensive nature of the tasks. This propagation of delays can be mitigated by continuously monitoring each process; however, current manual monitoring methods are laborious, and recently proposed contact sensor-based methods are intrusive to the work. In addition, recent computer vision-based monitoring methods inside factories are limited to detection algorithms that fail to provide the pixel-level accuracy required for assembly progress monitoring in highly occluded factory scenes, and they require a large number of manual annotations. Therefore, this paper proposes a method to monitor the installation of subassemblies in modular construction factories using mask R-CNN instance segmentation and improves the data efficiency of the model using a copy-paste augmentation method. This method was validated on the CCTV videos captured from a modular construction factory in the US, resulting in a 9% mAP improvement in segmentation.

computer vision↗

Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operating supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LANL: Net Zero Campus Using Modular Construction

Since its creation, Los Alamos National Laboratory has been a mission driven facility. One goal, of many, is to enable mission delivery through next-generation facilities, infrastructure, and operational excellence. That goal is fostered through the creation of a modern, environmentally responsible workplace. With this drive towards environmental stewardship, there has been an increase in the not only the design of high performing sustainable buildings, but in the use of sustainable construction practices as well. To maintain the current environment, projects have begun to use modular construction. While the practice may offer a multitude of benefits, the high cost of building energy consumption remains. This study stands as an attempt to offer a solution to that problem. With the future creation of a 10 Mega-Watt Photovoltaic System as well as the shift towards modular construction, it may be feasible to generate a Zero Energy Campus whose energy consumption zeros out and environmental footprint remains minimal.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Modularly Constructed Polyhedral Oligomeric Silsesquioxane-Based Giant Molecules for Unconventional Nanostructure Fabrication

Controlled assembly of nanoscale building blocks is a promising approach to obtain functional materials with unique properties. In this paper, we report a way to manipulate the supramolecular structures of giant molecules based on discotic triangle cores and isobutyl polyhedral oligomeric silsesquioxanes (BPOSS) nanoparticles (NPs). It is found that depending upon the number of BPOSS at the periphery of the discotic cores, the packing of these nanoscale components (discotic core and POSS) could be manipulated into either cylindrical or Frank–Kasper (F–K) A15 ($Pm\overline 3n$) phases. The formation of these supramolecular nanostructures is mandated by the balance between the stacking of the discotic cores and the steric hindrance effect of the BPOSS NPs. This strategy to manipulate the packing of nanoscale building blocks for different supramolecular nanostructures including the fabrication of cylindrical structures and A15 ($Pm\overline 3n$) phases may be extended to other nanoscale building blocks for future development of materials with complex structures as well as tailored functionalities and properties.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗