Search NASA⌕ Search

SEARCH · Search NASA

Results for “modular construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated Assembly Progress Monitoring in Modular Construction Factories Using Computer Vision-Based Instance Segmentation

Modular construction has recently gained interest as a transformative construction method. In this method, a large portion of the construction is performed inside factories, where processes are fast-paced and interdependent; therefore, any deviation from the schedule can delay the production. Such deviations are frequent in modular factories due to the labor-intensive nature of the tasks. This propagation of delays can be mitigated by continuously monitoring each process; however, current manual monitoring methods are laborious, and recently proposed contact sensor-based methods are intrusive to the work. In addition, recent computer vision-based monitoring methods inside factories are limited to detection algorithms that fail to provide the pixel-level accuracy required for assembly progress monitoring in highly occluded factory scenes, and they require a large number of manual annotations. Therefore, this paper proposes a method to monitor the installation of subassemblies in modular construction factories using mask R-CNN instance segmentation and improves the data efficiency of the model using a copy-paste augmentation method. This method was validated on the CCTV videos captured from a modular construction factory in the US, resulting in a 9% mAP improvement in segmentation.

computer vision↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A New State of the Art: Zero Energy Modular Multifamily Construction

In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oak Ridge National Laboratory Security by Design: A Plant Design and Component-Based Approach to Technical Solutions to Insider and Outsider Threat

Security costs for nuclear reactors have been shown to rise over the lifecycle of a nuclear facility as new threats, security weaknesses, and the generic threat profile of the plant location change over time. This paper conducts a review of the technological gaps that currently exist in Security by Design (SeBD) based on the literature available and attempts to close those gaps through proposing technological constructs and processes that can integrate safety and security in the design process of a plant, with a primary focus on SMR technology. Under the new modular and mass manufacturing regime, where plant designs attempt to reduce costs with potential economies of scale and modular construction, the current SeBD definitions focusing on state level regulators are not considered adequate since the licensing stage is often too late in the design process to integrate the true cost savings of SeBD. Thus, this paper attempts to remedy the current logic in order to allow for continuous implementation of security alongside the development of the safety concept for the plant. If adopted within the design process the establishment of this type of technology will allow for a technological ecosystem to evolve that will imbed security concepts into the physical design of the components of the plant.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital Twins for Nuclear Power Plants and Facilities

The nuclear digital twin (DT) is the virtual representation of a nuclear energy system across its lifecycle. The nuclear DT uses real-time information and other data sources to improve the process of design, licensing, construction, security, O&M, decommissioning, and waste disposal. By leveraging the knowledge base and experience from the past 40 years of LWR operation, the nuclear DT is helping to accelerate the development and deployment of advanced nuclear technology in areas of passive safety, new fuel forms, instrumentation, and reactor control. For the currently operating nuclear fleet, DTs are reducing the operational risks, increasing plant availability, increasing energy capability, and reducing electricity production costs. For advanced fission and fusion reactors, DTs are being used to design for passive safety and built-in security-by-design. Rapidly deployable small modular reactor (SMR) and microreactor designs compatible with modular construction techniques and advanced manufacturing will be the new normal, reducing the need for large capital expenditures and compressing construction schedules. In addition, lower operational and maintenance costs will be realized by reducing the complexity of operations, staffing needs, and maintenance-related activities.

Kropaczek, Dave↗

Robust Synthetic Biology Toolkit to Advance Carboxysome Study and Redesign

Carboxysomes are polyhedral protein organelles that microorganisms use to facilitate carbon dioxide assimilation. They are composed of a modular protein shell that envelops an enzymatic core mainly composed of physically coupled Rubisco and carbonic anhydrase. While the modular construction principles of carboxysomes make them attractive targets as customizable metabolic platforms, their size and complexity can be a hindrance. In this work, we design and validate a plasmid set, the pXpressome toolkit, in which α-carboxysomes are robustly expressed and remain intact and functional after purification. We tested this toolkit by introducing mutations that influence carboxysome structure and performance. We find that deletion of vertex-capping genes results in formation of larger carboxysomes, while deletion of facet forming genes produces smaller particles, suggesting that adjusting the ratio of these proteins can rationally affect morphology. Through a series of fluorescently labeled constructs, we observe that this toolkit leads to more uniform expression and better cell health than previously published carboxysome expression systems. Overall, the pXpressome toolkit facilitates the study and redesign of carboxysomes with robust performance and improved phenotype uniformity. The pXpressome toolkit will support efforts to remodel carboxysomes for enhanced carbon fixation or serve as a platform for other nanoencapsulation goals.

59 BASIC BIOLOGICAL SCIENCES↗

FIREWHEEL

SAND2024-16910O FIREWHEEL is a tool for experiment orchestration that assists a user in building and controlling repeatable experiments of distributed network systems at any scale. This version also includes FIREWHEEL v2.7 and its associated companion model components. With FIREWHEEL, users can easily construct modular parts of a cyber system, called Model Components. The Model Components can be combined to form an experiment. Most experiments are then instantiated using an emulation tool, such as minimega.

Kajder, Thomas↗

Construction Methodology Transformation for the Benefit of Workforce Development

Construction is a key economic engine driving both national and global economies. While manual, onsite construction methods dominate the U.S. construction industry, a major shift towards offsite methods has been underway due to its efficiency, speed, and potential cost savings. The workforce necessary for offsite construction growth does not exist in its current form because of the focus on onsite methodologies and the lack of exposure to offsite building methods at all levels of a student’s learning journey. The growth of the U.S. construction industry and competitiveness in an increasingly global construction market over the coming decades can only be supported by a dramatic increase in the use of offsite methods, which requires ramping up workforce training for certain skillsets. The goal of Construction Methodology Transformation for the Benefit of Workforce Development was to understand the opportunities and barriers in both education and industry and to identify best practices for offering curriculum and training to educators, industry, and students that would support skills needed for careers in offsite construction. Our team proposed combining three offsite construction workforce development needs: content development, exposure and training, and job placement - under a single Platform model that would increase experience and career opportunities for students and help match them with potential industry members. Through our proposed solution we expected to see: developed offsite curriculum being utilized by educators and students; an increase in the identification of construction technology and offsite construction methods; an average increase in knowledge gain of at least 25% after participation in pilots; better equipped candidates who are prepared for jobs in offsite construction; and a beta workforce development platform that helps build more pathways for students looking for careers in offsite construction. The two pilots included almost 250 students and resulted in an average knowledge gain of 37 percent. Our research has identified areas of opportunity, for both education and industry to make collaborative training programs more efficient and successful. The chosen techniques for this program are extremely effective when both the school and factory have solid processes and cultures in place to accept students into training programs. This project serves as an important stepping stone to industrywide collaboration to move workforce development for offsite construction forward across the country. With continued collaboration programs like this can provide much needed early exposure and training in offsite construction and we can begin to fill important positions for the future of construction.

99 GENERAL AND MISCELLANEOUS↗

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Affordable and Scalable Modular Multifamily Housing: A Case Study on Cost, Construction Time Savings, and Waste Reduction in California: Preprint

Modular construction can significantly reduce waste when compared to traditional methods. This case study evaluates cost, construction time, and waste metrics for a 195-unit stick-built project and for a 66-unit modular project both based in Los Angeles, CA. We partner with SoLa Impact (real estate developer) and Model/Z (modular manufacturer) to evaluate the impact of Model/Z's 1-bedroom modular unit which is produced in a 160,000 sq ft local factory in South Los Angeles. We compare them to similar stick-built/site-built multifamily construction by the same developer in Los Angeles. This study finds that modular production reduced construction waste through precise prefabrication, concentrated workforce expertise, and streamlined logistics while cutting transportation needs, improving project efficiency and lowering associated timelines and costs. Economies of scale are being realized as Model/Z has produced over 500 affordable housing units and supplied for projects up to 188 units, shortening schedules and lowering per-unit costs and supporting affordable housing goals in income-challenged South Los Angeles. Modular methods offer a scalable, resource-efficient pathway to increasing affordable housing supply while reducing total development costs by 10-15% and project timelines by 50%, while simultaneously creating local jobs and training opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modularization of Small Modular Reactor Facilities: Physical Protection Recommendations

U.S. nuclear power facilities face increasing challenges in meeting dynamic security requirements caused by evolving and expanding threats while keeping costs reasonable to make nuclear energy competitive. In consideration of the economic viability of small modular reactor (SMR) facilities, many designers and utilities are considering a modular approach to the construction and operation of these facilities. This modular approach considers building and operating a first unit; once the first reactor is in operation, construction will begin on a second reactor. This process would allow the vendor or utility to ensure production of energy and financial income while the second reactor is under construction. This project evaluates the feasibility of modular construction in terms of physical protection and identifies several recommendations for vendors and utilities considering this approach. To conduct this evaluation, a hypothetical three-unit SMR facility was developed, a physical protection system (PPS) was considered for the design, and a hypothetical design basis threat (DBT) was used to evaluate this PPS. Multiple outsider sabotage scenarios were examined, with adversary team sizes ranging from 4-to-8 to determine security system effectiveness. The results of this work will influence PPS designs and facility designs for U.S. domestic SMRs. This work will also demonstrate how a series of experimental and modeling capabilities across the Department of Energy (DOE) complex can impact the design and completion of security-by-design (SeBD) for SMRs considering modular construction. The conclusions and recommendations in this document may be applicable to all SMR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Technical Report (FTR) - DE-EE0009084: Prefabricated Construction: Guidance, Technical Assistance, and Virtual Inspections

This final technical report summarizes research, case studies, and resources developed from 2020–2025 on prefabricated construction and remote virtual inspections. It documents key findings on benefits, challenges, and best practices, highlights examples from multiple states, and provides guidance to support wider adoption of these innovations in the construction sector.

99 GENERAL AND MISCELLANEOUS↗