Search NASA⌕ Search

SEARCH · Search NASA

Results for “monitoring, personnel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

2021 Consequence Management Hotline Drill After Action Report

In March 2021, a functional area drill was held at the Remote Sensing Laboratory–Nellis that focused on using CBRNResponder and the Digital Field Monitoring (DFM) tablets for sample hotline operations and the new paper Sample Control Forms (SCFs) for sample collection. Participants included staff trained and billeted as sample control specialists and Consequence Management Response Team (CMRT) field monitoring personnel. Teams were able to successfully gather and transfer samples to the sample control hotline staff through the manual process, though there were several noted areas for improvement. In July and October 2021, two additional functional area drills were held at Sandia National Laboratories that focused on field sample collection and custody transfer at the sample control hotline for the Consequence Management (CM) Radiological Assistance Program (RAP) program. The overarching goal of the drills was to evaluate the current CM process for sample collection, sample drop off, and sample control using the CBRNResponder mobile and web-based applications. The July 2021 drill had an additional focus to have a subset of samples analyzed by the local analytical laboratory, Radiation Protection Sample Diagnostics (RPSD) laboratory, to evaluate the Laboratory Access portal on CBRNResponder. All three drills were able to accomplish their objectives however, there were several issues noted (Observations: 25 Urgent, 29 Important, and 22 Improvement Opportunities). The observations were prioritized according to their impact on the mission as well as categorized to align with the programmatic functional area required to address the issue. This report provides additional detail on each observation for skillset/program leads and software developers to consider for future improvement or mandatory efforts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Review of Pantex Radiation Safety Department 2020 Backup Dosimetry Processing Methodology

In the first quarter (Q1) of Calendar Year 2020, the Pantex Radiation Safety Department (Pantex) experienced various issues and failures with their dosimeter processing equipment. Efforts to repair the equipment resulted in limited functionality without the ability to process dosimeters assigned to personnel for monitoring dose. As a result of the impairments to the dosimeter processing equipment, Pantex called upon Nevada National Security Site (NNSS) for support, as their designated backup processor. In January of 2021, LLNL Subject Matter Experts in External Dosimetry started an NNSA-requested review of Pantex’s personnel doses in Q1 2020. Its focus was the technical validity of the means and methods used by Pantex and its conclusions and provide a level of confidence to National Nuclear Security Administration (NNSA) that the resulting personnel doses were reasonable, conservative, and defensible.

61 RADIATION PROTECTION AND DOSIMETRY↗

Minimum Detectable Intakes and Doses for Uranium Bioassays—Comparison between Alpha Spectrometry and ICP-MS

Naturally occurring uranium complicates monitoring for occupational exposures. There are several retroactive methods that can be used to monitor for occupational exposures, with benefits and drawbacks to each. Analysis of uranium in urine by mass spectrometry and alpha spectrometry is compared, and methods of determining an occupational exposure are presented. Furthermore, the minimum detectable concentrations from each analysis and a method for intake determination based on the analytical results are compared for various solubility types and mixtures. Mass spectrometry with radiochemical separation was found to be the most sensitive analysis for detecting occupational exposures to anthropogenic mixtures based on minimum detectable doses calculated from the proposed method for intake determination.

bioassay↗

Virtual/Augmented Reality (VR/AR):Tools for Nuclear Training, Operations and Design

Introduction: Problems: Mistakes in the field due to a lack of information (Ex: Pump repair failure rate 50%); Avoidable exposure due to multiple employees for procedure adherence and monitoring; Debates over 2D drawings can be more easily resolved. Purpose: Training: Employees can be trained more effectively. Operating: Operations can be carried out more efficiently with fewer workers required with AR. Design Review: Pull the designers and designs into VR. Design: VR: Unreal Engine, Unity, Custom. AR: HoloLens: Unity, Custom - DirectX 12.

42 ENGINEERING↗

Day-to-day reliability of basal heart rate and short-term and ultra short-term heart rate variability assessment by the Equivital eq02+ LifeMonitor in US Army soldiers

Introduction The present study determined the (1) day-to-day reliability of basal heart rate (HR) and HR variability (HRV) measured by the Equivital eq02+ LifeMonitor and (2) agreement of ultra short-term HRV compared with short-term HRV. Methods Twenty-three active-duty US Army Soldiers (5 females, 18 males) completed two experimental visits separated by >48 hours with restrictions consistent with basal monitoring (eg, exercise, dietary), with measurements after supine rest at minutes 20–21 (ultra short-term) and minutes 20–25 (short-term). HRV was assessed as the SD of R–R intervals (SDNN) and the square root of the mean squared differences between consecutive R–R intervals (RMSSD). Results The day-to-day reliability (intraclass correlation coefficient (ICC)) using linear-mixed model approach was good for HR (0.849, 95% CI: 0.689 to 0.933) and RMSSD (ICC: 0.823, 95% CI: 0.623 to 0.920). SDNN had moderate day-to-day reliability with greater variation (ICC: 0.689, 95% CI: 0.428 to 0.858). The reliability of RMSSD was slightly improved when considering the effect of respiration (ICC: 0.821, 95% CI: 0.672 to 0.944). There was no bias for HR measured for 1 min versus 5 min (p=0.511). For 1 min measurements versus 5 min, there was a very modest mean bias of −4 ms for SDNN and −1 ms for RMSSD (p≤0.023). Conclusion When preceded by a 20 min stabilisation period using restrictions consistent with basal monitoring and measuring respiration, military personnel can rely on the eq02+ for basal HR and RMSSD monitoring but should be more cautious using SDNN. These data also support using ultra short-term measurements when following these procedures.

General & Internal Medicine↗

Preliminary Experiences with the Rexon UL-320-FDR: An Automated Thermoluminescent Dosimeter Reader with Removable Contact Heating Planchets and an Infrared Temperature Feedback System

The Rexon UL-320 FDR is a novel resistive-heating thermoluminescent dosimeter reader with a unique temperature measurement system and an automated dosimeter processing mechanism. The removable contact heating planchets have black-body adhesives on the back for capturing temperature information with infrared sensors. A heating cycle feedback loop ensures accurate, precise, and reproducible heating sequences. Heating rates between 0.8 and 40°C s -1 for up to 1,000 s are possible. Photomultiplier tube sensitivity and drift, dark current counts, and planchet glow were measured experimentally. Additionally, 25 LiF:Mg,Ti dosimeters were calibrated to demonstrate reader performance. Sensitivity was optimized at 1,200 V, which produced the highest reference light count to dark current count ratio while extending photomultiplier tube life. Dark current counts measured with typical time-temperature profiles for LiF:Mg,Ti were below 10 counts per channel but increased by up to 2.5% for more extreme heating cycles. Reader sensitivity drifts of up to 10% were observed during extended automated operations with typical time-temperature profiles. Total counts resulting from planchet glow decreased with faster heating rates. Calibrations performed with LiF:Mg,Ti dosimeters yielded results comparable to more established reader designs. Spikes were observed in ~3% of the glow curves from planchet dust and oil burning off at elevated temperatures. The use of N 2 gas and sensitivity drift corrections are recommended to improve dosimetry performance for the UL-320 FDR reader.

61 RADIATION PROTECTION AND DOSIMETRY↗

Integrated Methane Monitoring Platform Extension, Volume I: Final Technical Report

The IMMPE project, DE-FE0032284, was to enhance methane monitoring technologies and their applications across various natural gas asset classes. The scope included deploying advanced methane detection and monitoring technologies to identify and mitigate fugitive methane emissions, measuring emission rates, and assessing impacts. The findings included the successful mitigation of identified emissions and quantification of emission rates. A key outcome was the development of a comprehensive template and summary of recommendations for methane emissions monitoring, which is replicable for both upstream and downstream applications. Furthermore, the project emphasized the importance of education by providing training opportunities for technicians and regulators, thereby fostering awareness and promoting the adoption of cost-effective methane emissions monitoring and management techniques.

02 PETROLEUM↗

Sandia Nuclear Cartridge Concept

Nuclear power offers the promise of long-term electrical power for remote areas. Recent advances in passive safety and long-life cores make a reactor that can be operated autonomously for 20 years or more a real possibility. This white paper discusses a reactor concept that offers the potential for further development, resulting in a permanently hermetically-sealed "nuclear cartridge." The term "nuclear cartridge" is meant to imply a nuclear energy source that can be inserted into a site and operated autonomously until its energy has been depleted, then withdrawn and replaced by another cartridge. The concept can be scaled for various sizes, ranging from about 1 megawatt-electric (MWe) to about 100 MWe. The paper also discusses the concept of Integrated Safety, Operations, Security, and Safeguards (ISOSS) by design as it applies to this reactor design. Finally, a discussion of smart grids and how they can benefit the transfer of power to the end user is included. The Nuclear Cartridge concept has been developed with the following characteristics in mind: highly reliable autonomous operation coupled with international monitoring, requiring minimal on-site operations personnel; walkaway passively safe design; cartridge replacement cycle on the order of 20 years; load following capability; physical security by design requiring minimal security personnel during operations; and proliferation resistance by design. As illustrated in figure 1, integrating the reactor with advanced power conversion, smart grids, and other sources of energy results in a resilient and sustainable energy source.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

How To Maintain Effective IAEA Safeguards While Reducing Facility Impact

For almost twenty years, inspectors from the International Atomic Energy Agency have been visiting the K-Area Material Storage facility at the Savannah River Site where excess plutonium has been placed under IAEA safeguards as part of the United States Volunatary Offer Agreement. During that time, the mission of K-Area Complex has expanded from storage of nuclear matieral to glovebox operations in support of the National Nuclear Security Administration’s Plutonium Disposition program. With this change in mission, it is becoming increasingly challenging to manage facility staff radiation exposure and operating activities during the IAEA’s annual Physcial Inventory Verifications (PIV). This study has identified both near-term and long-term recommendations for IAEA monitoring protocols that would allow the IAEA to maintain effective safeguards of the material while decreasing the impact to the facility. A statisitical analysis has shown that reducing the number of containers measured during an annual PIV from 12 to 4 still ensures a high level of confidence in the confidence while reducing the inspector time in the facility amd with a corresponding significant reduction in personnel radiation exposure. A modified installation pattern of Remotely Monitored Sealing Arrays (RMSAs) is also proposed utilizing only the outer rows of arrays of stored material containers in the Stack Area (SA). The modified RMSA placement will provide equivalent protection, while significantly reducing personnel radiological exposure, manpower requirements and associated costs. With advances in technology, there are additional potential options in containment/surveillance and continuity of knowledge that would allow the agency to be outside of the facility during PIV measurements and have confidence in the accuracy and authencitity of the results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Generating SBoMs Utilizing Structured Threat Information Expression JSON bundles

With cyber-attacks on the rise, information is one of the first lines of defense. Now more than ever, security experts and developers need efficient ways to know if their software may be outdated or vulnerable to emerging threats. By generating a Software Bill of Material based on STIX2/JSON bundles, security experts and developers can ensure that they know where to find what can go wrong with their systems before the hackers do. As part of the Infrastructure Expression project, Idaho National Laboratory (INL) is currently working on ways that can aid in the development of efficient SBOMs using Structured Threat Information Expression (STIX). Doing so can provide an efficient first line of defense for detection and monitoring that can be easily used by cyber personnel from beginners to highly skilled experts.

97 MATHEMATICS AND COMPUTING↗

Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation

Long-term seismic monitoring of carbon capture and storage projects is needed to verify that the injected gas is safely stored in the subsurface until permanence can be assured. Conventional surface seismic monitoring techniques are usually expensive, require highly invasive surface operations, and need significant time investments on the part of personnel for both the field effort and processing the acquired data. For these reasons, permanent reservoir monitoring technologies are preferred, as they can offer a cost-effective solution for long-term monitoring. As part of the monitoring program of the Archer Daniels Midland’s large-scale injection of CO 2 in Decatur, Illinois, USA, a continuous seismic monitoring array was installed using a combination of surface orbital vibrator (SOV) sources and fiber-optic cables for distributed acoustic sensing (DAS) acquisition with the objective to build a continuous monitoring array. The aim of the presented project was to build a monitoring array and platform that integrates real-time seismic data with conventional data streams and provides continuous data analysis using dynamic computational models to deliver a comprehensive real-time assessment of subsurface conditions. It is in this context that the Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation project was proposed with the objective to develop an integrated architecture that utilizes a permanent seismic monitoring network, combines the real-time geophysical and process data with reservoir flow and geomechanical models to create a comprehensive monitoring, visualization, and control system that delivers critical information for process surveillance and optimization.

54 ENVIRONMENTAL SCIENCES↗

Fibre-optic based DAS technology for Long-term Seismic Monitoring of Carbon Capture and Storage Projects

Long-term seismic monitoring of carbon capture and storage projects (CCS) is needed to verify that the injected gas is safely stored in the subsurface until permanence can be assured. Conventional surface seismic monitoring techniques are usually expensive, require highly invasive surface operations, and need significant time investments on the part of personnel for both the field effort and processing the acquired data. For these reasons, permanent reservoir monitoring (PRM) technologies are preferred, as they can offer a cost-effective solution for long-term monitoring. In this context, we have developed and trialed the use of distributed acoustic sensing (DAS) coupled to permanent rotary sources, called surface orbital vibrators (SOV), with the objective to build a continuous monitoring array for CCS projects.

47 OTHER INSTRUMENTATION↗

Substation Secondary Asset Health Monitoring and Management System (SSHM)

Electric Power Group, LLC (EPG) was awarded DOE OE0000850 to design, develop, and demonstrate a real-time software application for substation secondary equipment health monitoring and management at host utility American Electric Power (AEP), a cost share partner. This project addresses the need for monitoring substation equipment health and providing operators with tools to identify and take pre-emptive action to avoid catastrophic equipment failure. By monitoring synchrophasor data in real time, data anomalies that indicate potential asset failure can be detected and alerts can be sent to operators in time to take corrective actions. EPG developed two data driven algorithms to identify abnormal equipment signature patterns as well as a method using substation linear state estimation (SLSE). The software has been deployed on hardened PC’s and tested and validated for cost share partner AEP’s substations - 138kV and 765 kV. The SSHM software has been accepted by AEP and final demonstration of DOE - OE0000850 for AEP and DOE was successfully completed on March 17th, 2020. EPG developed the Substation Secondary Asset Health Monitoring (SSHM) Platform to analyze equipment failure signatures in PMU data and alert substation personnel when pre-emptive inspection, repairs and other actions are warranted to prevent potential catastrophic failures. This is the first system that automatically monitors the health of substation secondary assets and alerts users to emerging failures using synchrophasor measurements. SSHM uses high resolution PMU data from PTs, CTs, and CCVTs to analyze equipment signatures and identify anomalies that are precursor indicators of potential equipment failure. When an anomaly is detected, there is a likelihood of potential failure of monitored equipment, the system alerts the user with visual alarms including alarm trend charts and indicator lights on a oneline diagram of the substation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Artificial Reasoning System for Symptom-Based Conditional Failure Probability Estimation Using Bayesian Network

Advances in nuclear power technologies require enhanced capabilities for operator advice and autonomous control. One of the first tasks in the development of such capabilities is the formulation of symptom-based conditional failure probabilities for structures, systems, and components (SSCs) of interest, for which the primary goal is to aid plant personnel in deducing the probabilistic performance status of the monitored SSCs and in detecting impending faults/failure. The task of conditional failure probability estimation is a bidirectional inference problem and shall be logically tackled by the Bayesian network (BN) approach. As a knowledge-based artificial intelligence tool and a probabilistic graphical model, BN offers the capability of reasoning under uncertainty and graphical representation emulating the physical behavior of the target SSC. This paper provides a systematic overview of the BN technique and the software tools for handling implementation of BN models, along with the associated knowledge representation and reasoning paradigm. Both operational data and expert judgement can be readily incorporated into the knowledge base of a BN model. The challenges with data availability are highlighted, and the general approach to target SSC identification is presented. Our focus is upon failure-prone and risk-important balance of plant assets, especially cases having strong operator involvement. An exemplary case study on the failure of a motor-driven centrifugal pump is also conducted to demonstrate the usefulness and technical feasibility of the proposed artificial reasoning system using an expert system shell.

Zhao, Xingang↗

RCT Continuing Training: Radiological Emergency Response

Objectives: 1) List the revised initial response and supplemental actions while responding to a major injury inside of a radiological area; 2) List the initial response and supplemental actions while responding to a minor injury inside of a radiological area; 3) List the initial response and supplemental actions for responding to a Continuous Air Monitoring (CAM) alarm; 4) List the initial response and supplemental actions for responding to a radioactive spill; 5) List the initial response and supplemental actions of responding to an Area Radiation Monitor (ARM) alarm; 6) List the initial response and supplemental actions of an Electronic Personal Dosimeter (EPD) dose and dose rate alarm; 7) List the initial response and supplemental actions of responding to a Stationary Contamination Monitor (SCM) alarm; 8) Identify the methods to perform personnel decontamination.

61 RADIATION PROTECTION AND DOSIMETRY↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clearing a Path to Commercialization of Marine Renewable Energy Technologies Through Public–Private Collaboration

Governments are increasingly turning toward public–private partnerships to bring industry support to improving public assets or services. Here, we describe a unique public–private collaboration where a government entity has developed mechanisms to support public and private sector advancement and commercialization of monitoring technologies for marine renewable energy. These support mechanisms include access to a range of skilled personnel and test facilities that promote rapid innovation, prove reliability, and inspire creativity in technology development as innovations move from concept to practice. The ability to iteratively test hardware and software components, sensors, and systems can accelerate adoption of new methods and instrumentation designs. As a case study, we present the development of passive acoustic monitoring technologies customized for operation in energetic waves and currents. We discuss the value of testing different systems together, under the same conditions, as well as the progression through different test locations. The outcome is multiple, complementary monitoring technologies that are well suited to addressing an area of high environmental uncertainty and reducing barriers to responsible deployment of low-carbon energy conversion systems, creating solutions for the future.

16 TIDAL AND WAVE POWER↗

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗