Search NASA⌕ Search

SEARCH · Search NASA

Results for “moratoriums”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

NASA Feedback to DLA Land & Maritime Moratorium on Wafer Fab Audits

On September 29, 2017 the Defense Logistics Agency (DLA), Land and Maritime, announced that on September 1, 2017 they had begun a moratorium on the auditing of wafer fabrication facilities (fabs) used in the production of semiconductor die for military (MIL) qualified integrated circuits and discrete semiconductors (transistors and diodes). The announcement said the moratorium would last for six months initially and would apply to all wafer fabs qualified to MIL-PRF-19500 (discretes) and MIL-PRF-38535 (ICs) located, onshore or offshore. The stated rationale behind this action was to give DLA time to evaluate the risk of modifying current surveillance practices across 70+ Federal Stock Classes (FSC) under the jurisdiction of the DLA Qualifying Activity (VQ). The objective was to free up the resources used in these audits so they could be redirected towards audits of other commodities which were under resourced, notably connectors. In the announcement letter, DLA-VQ requested data from the community to assist with decisions on wafer fab re-audit cycle modifications. NASA used available information on current and historical audit schedules to gather such data and analyzed it to provide an in-depth understanding of the impact of locations, part types, in-house or out-of-house fabs on those schedules over time. This presentation provides the results of NASA's data analysis and suggest some changes to auditing practices that could increase efficient use of resources without significant increases in risk.

fab audits↗

Communications with Curiosity during solar conjunction

This study examines the methodology for operating and communicating with NASA's Curiosity Rover (MSL) during the 2019 solar conjunction. For MSL, solar conjunction occurs when the viewing angle between the Sun and Mars from Earth's perspective falls below 3 degrees, which occurs roughly every two Earth years and lasts for about two weeks. This presents a challenge for engineers operating a vehicle on Mars because the degraded signal to noise ratio disrupts data flow between Earth and the spacecraft. As a result, operators designate a command moratorium in which no commands are sent to the rover and instead design long-term plans that are uplinked weeks in advance (rather than the nominal case of daily uplinks). Coordinating communications with the rover leading up to and following conjunction requires negotiations with several orbiters, another lander, and the Deep Space Network (DSN) each with their own set of constraints. It is the Strategic Comm Planning T coordination, which acts as a baseline for the conjunction Comm team faced additional complications such as the arrival of two new spacecraft at Mars - Roscosmos ExoMars Trace Gas Orbiter (TGO).

Laubach, Sharon↗