High Average Power RF Window with Improved Multipactor Coating

Multipactor emission can be a serious issue for vacuum electron devices operating at megawatt power levels. It can lead to catastrophic failure from surface arcs or excessive heating of ceramic windows. Titanium nitride is effective at suppressing multipactor emission; however, sputter coating is not strongly bonded to surfaces and issue related to lifetime have arisen. It’s difficult to ensure a uniform coating over large surfaces. This research investigated atomic layer deposition (ALD) as an improved alternative to sputtered coatings. Test windows were fabricated and coated with TiN using ALD, then tested for RF loss and secondary emission. All ALD samples showed RF loss less than 0.01dB with secondary emission yield equal to or better than reported measurements with sputter coated windows. The program also designed a preliminary ALD system capable of coating windows up to 24 inches in diameter.

43 PARTICLE ACCELERATORS↗

Testing of PIP-II pre-production 650 MHz couplers in warm test stand and in cryomodule

650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.

43 PARTICLE ACCELERATORS↗

Testing and Processing of Pre-production 325 MHz Single Spoke Resonator Power Couplers for PIP-II Project

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

43 PARTICLE ACCELERATORS↗

TESTING AND PROCESSING OF PRE-PRODUCTION 325 MHZ SINGLE SPOKE RESONATOR POWER COUPLERS FOR PIP-II PROJECT

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗