Search NASASearch

SEARCH · Search NASA

Results for “nasa networks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NASA Network

The NASA Network includes nine NASA operated and partner operated stations covering North America, the west coast of South America, the Pacific, and Western Australia . A new station is presently being setup in South Africa and discussions are underway to add another station in Argentina. NASA SLR operations are supported by Honeywell Technical Solutions, Inc (HTSI), formally AlliedSignal Technical Services, The University of Texas, the University of Hawaii and Universidad Nacional de San Agustin.

Carter, David

The proposed HDTV schemes and the NASA network

Results of the simulation of high definition television (HDTV) techniques in the context of their application to transmit HDTV sequences over the NASA network are presented. Various tradeoffs involved in selecting the different services available on the NASA network are discussed. The possibility of transmitting an HDTV-like signal over the CCSDS network is investigated. Some suitable approaches are suggested.

Chen, Y. C.

Performance characteristics of omnidirectional antennas for spacecraft using NASA networks

Described are the performance capabilities and critical elements of the shaped omni antenna developed for NASA for space users of NASA networks. The shaped omni is designed to be operated in tandem for virtually omnidirectional coverage and uniform gain free of spacecraft interference. These antennas are ideal for low gain data requirements and emergency backup, deployment, amd retrieval of higher gain RF systems. Other omnidirectional antennas that have flown in space are described in the final section. A performance summary for the shaped omni is in the Appendix. This document introduces organizations and projects to the shaped omni applications for NASA's space use. Coverage, gain, weight, power, and implementation and other performance information for satisfying a wide range of data requirements are included.

Hilliard, Lawrence M.

Satellite time synchronization of a NASA network.

A satellite time synchronization technique has been used for synchronization of remotely separated clocks during the past several years. The NASA network has been successfully synchronized to an accuracy of tens of microseconds via the NASA Geodetic Earth Orbiting Satellite GEOS-11. The results indicate that a polar orbit satellite having an onboard clock can effectively be used to synchronize clocks on a global basis.

Laios, S. C.

Performance interface document for the S-band diplexer for space users of NASA networks

This report discusses the test results and interfacing information of the S-band diplexer development program supported by RTOP 310 funding. The program was implemented to reduce the S-band transponder noise figure by minimizing the receive channel insertion loss and to also provide Space Transportation System (STS) compatibility by providing 70-db rejection up to 16 GHz in the receive channel. This compatibility includes rejection of signals from the Shuttle S-band Data Link, the K-band Data Link, and the K-band Rendezvous Radar. The first of many projects to benefit from this accomplishment was the Earth Radiation Budget Satellite (ERBS).

Line, L. G.

NASA Integrated Network COOP

Natural disasters, terrorist attacks, civil unrest, and other events have the potential of disrupting mission-essential operations in any space communications network. NASA's Space Communications and Navigation office (SCaN) is in the process of studying options for integrating the three existing NASA network elements, the Deep Space Network, the Near Earth Network, and the Space Network, into a single integrated network with common services and interfaces. The need to maintain Continuity of Operations (COOP) after a disastrous event has a direct impact on the future network design and operations concepts. The SCaN Integrated Network will provide support to a variety of user missions. The missions have diverse requirements and include anything from earth based platforms to planetary missions and rovers. It is presumed that an integrated network, with common interfaces and processes, provides an inherent advantage to COOP in that multiple elements and networks can provide cross-support in a seamless manner. The results of trade studies support this assumption but also show that centralization as a means of achieving integration can result in single points of failure that must be mitigated. The cost to provide this mitigation can be substantial. In support of this effort, the team evaluated the current approaches to COOP, developed multiple potential approaches to COOP in a future integrated network, evaluated the interdependencies of the various approaches to the various network control and operations options, and did a best value assessment of the options. The paper will describe the trade space, the study methods, and results of the study.

Continuity of Operations (COOP)

Master clock and time distribution system for the NASA Deep Space Network

NASA's Deep Space Network (DSN) consists of more than 20 antennas located at three globally spaced ground communications facilities. Local generation and distribution of precise time and frequency reference signals comprise an essential and central component of each complex. Within each complex synchronized timing references are required by approximately 100 users located at distances up to 30 kilometers from the central control center and station Master Clock. In this paper a highly modular, hot-swappable, and expandable system design for generation, delivery, and synchronization of highly precise and stable timing signals over fiber optic cables is described.

Tjoelker, R. L.

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network

The NASA Space Geodesy Network

NASA successfully demonstrated next generation SLR, VLBI, and GNSS using the GGAO prototypes.Tier 1 deployment of next generation stations is underway: KPGO (Kokee Park, Hawaii); VGOS station operational; VGOS station at McDonald Observatory, Texas nearly operational; build of long-lead items for first 3 SLR stations underway. Planning and discussions with international partners for Tier 2 deployment underway. Plan for Decadal Survey responsive deployment acceleration under review by NASA.

Merkowitz, Stephen

User Preference Optimization for Oversubscribed Scheduling of NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process — oversubsubscription and how to “fairly” reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D

A Demand Access Paradigm for NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. As part of an investigation into improved efficiency and responsiveness, we have been exploring and prototyping the infusion of a ”demand access” model into the DSN scheduling process. Today, DSN is fully pre-scheduled in advance, and many users rely on a stable schedule to plan their own spacecraft activities, weeks in advance of execution. However, a new class of missions is emerging that may not be scheduled as far in advance, and may be event-driven in coming across science targets at unpredictable times. These users could take advantage of an on-demand mechanism to download data. Simulations have shown that such a mechanism could improve latency (time from data collection to download) by 2x, as well as more efficiently utilize the available DSN antennas. In this paper, we describe a prototype of a demand access process and how it addresses the challenges of co-existing with a staticallyscheduled body of missions, while providing the benefits of lower latency science data return.

Lucena, Girly

Utilizing Schedule Constraints to Improve Automated Scheduling in NASA's Deep Space Network

NASA’s Deep Space Network (DSN) is a mission critical facility that supports many different space missions,from LEO to deep space exploration. In recent years, as the network has suffered from increasing oversubscription, more restrictions have been added to reduce the amount of manual scheduling labor necessary to come to consensus. In this paper, we describe a new auto-mated scheduling tool which takes advantage of these restrictions to bring the scheduling problem closer to feasibility. In addition, we describe an algorithm to reduce problem inputs given a partially-solved problem,thereby bringing the problem even closer to feasibility

Johnston, Mark

A DTN-Based Multiple Access Fast Forward Service for the NASA Space Network

The NASA Space Network provides a demand access return link service capable of providing users a space link "on demand". An equivalent service in the forward link direction is not possible due to Tracking and Data Relay Spacecraft (TDRS) constraints. A Disruption Tolerant Networking (DTN)-based Multiple Access Fast Forward (MAFF) service has been proposed to provide a forward link to a user as soon as possible. Previous concept studies have identified a basic architecture and implementation approach. This paper reviews the user scenarios and benefits of an MAFF service and proposes an implementation approach based on the use of DTN protocols.

Israel, David

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling

Space mission support by NASA Space Network

Normal NASA operational considerations and Phase 1 of Space Network (SN) interoperability foresees S band cross support between user spacecraft and space networks or partnering agencies. A typical interoperable scenario for an S band user spacecraft of a partner space agency with the NASA SN is presented. ESA's Hermes Manned Spaceplane exemplifies a typical interoperable user. In order to demonstrate the support potential of the NASA SN, the internal and external interfaces of the TDRSS (Tracking and Data Relay Satellite System), ATDRSS (Advanced TDRSS), and supporting elements are examined. Communications and operational requirements for a typical mission supported by the NASA SN are discussed.

Godfrey, Robert

Historics of the Space Tracking And Data Acquisition Network (STADAN), the Manned Space Flight Network (MSFN), and the NASA Communications Network (NASCOM)

The historical and technical aspects of the major networks which comprise the NASA tracking and data acquisition system are considered in a complete reference work which traces the origin and growth of STADAN, MSFN, and NASCOM up to mid-1971. The roles of these networks in both the Gemini and Apollo programs are discussed, and the separate developmental trends are identified for each network.

Corliss, W. R.

NASA's Next Generation Space Geodesy Network

NASA's Space Geodesy Project (SGP) is developing a prototype core site for a next generation Space Geodetic Network (SGN). Each of the sites in this planned network co-locate current state-of-the-art stations from all four space geodetic observing systems, GNSS, SLR, VLBI, and DORIS, with the goal of achieving modern requirements for the International Terrestrial Reference Frame (ITRF). In particular, the driving ITRF requirements for this network are 1.0 mm in accuracy and 0.1 mm/yr in stability, a factor of 10-20 beyond current capabilities. Development of the prototype core site, located at NASA's Geophysical and Astronomical Observatory at the Goddard Space Flight Center, started in 2011 and will be completed by the end of 2013. In January 2012, two operational GNSS stations, GODS and GOON, were established at the prototype site within 100 m of each other. Both stations are being proposed for inclusion into the IGS network. In addition, work is underway for the inclusion of next generation SLR and VLBI stations along with a modern DORIS station. An automated survey system is being developed to measure inter-technique vectorties, and network design studies are being performed to define the appropriate number and distribution of these next generation space geodetic core sites that are required to achieve the driving ITRF requirements. We present the status of this prototype next generation space geodetic core site, results from the analysis of data from the established geodetic stations, and results from the ongoing network design studies.

Desai, S. D.

The NASA Fireball Network Database

The NASA Meteoroid Environment Office (MEO) has been operating an automated video fireball network since late-2008. Since that time, over 1,700 multi-station fireballs have been observed. A database containing orbital data and trajectory information on all these events has recently been compiled and is currently being mined for information. Preliminary results are presented here.

Moser, Danielle E.