Extending the concept of the resource curse: Natural resources and public spending on health
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).
Remote sensing of natural resources by panoramic and multiband cameras, optical-mechanical scanner, airborne radar and gamma ray spectrometer
The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory’s mission. The philosophy or guiding principles of the NRMP include stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is reviewed and updated every five years. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered species documented on site (Appendices A, B and C).
Assessing the sustainability of natural resource management choices for agricultural and forest lands requires quantification of potential changes to a set of environmental and socioeconomic indicators selected to characterize reference scenarios relative to projected future scenarios. Correctly framing the questions with local stakeholders is a critical first step in the sustainability assessment, and the questions that can be addressed are often limited by data availability. Selecting and prioritizing indicators with stakeholders to address their needs and concerns improves the likelihood of investment in monitoring and evaluation of those indicators over time. Computational techniques for analyzing interactions between the selected indicators are inherently affected by the scales and formats of the assembled indicator datasets. Data analytics have the potential to improve understanding of the potential synergies and tradeoffs involved with meeting multiple environmental and socioeconomic goals simultaneously, but timely and appropriate indicator datasets are not always available—even in this new era of “big data.” Continued improvements in data science and data analytics are needed to broaden understanding and acceptance of problems and to provide valuable information for natural resource management. Advances in these areas will enable society to design future landscapes that meet multiple objectives, including the provisioning of agricultural and forest resources along with a variety of ecosystem services (e.g., clean water and healthy soils).
The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. This study introduces a novel numerical method to solve large-scale dynamic stochastic natural resource allocation problems that cannot be addressed by conventional methods. The method is illustrated with an application focusing on the allocation of global land resource use under stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters, the range of land conversion is considerably smaller for the dynamic stochastic model as compared to deterministic scenario analysis. The scenario analysis can thus significantly overstate the magnitude of expected land conversion under uncertain crop yields.
The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)
A zero-valent metal emulsion containing zero-valent metal particles is used to remediate contaminated natural resources, such as groundwater and soil. In a preferred embodiment, the zero-valent metal emulsion removes heavy metals, such as lead (pb), from contaminated natural resources. In another preferred embodiment, the zero-valent metal emulsion is a bimetallic emulsion containing zero-valent metal particles doped with a catalytic metal to remediate halogenated aromatic compounds, such as polychlorinated biphenyls (PCBs), from natural resources.
The Fernald, Ohio, Site, also called the Fernald Preserve is a former uranium processing plant that underwent extensive remediation pursuant to CERCLA. The Fernald site is managed by the US DOE Office of Legacy Management. US DOE and the Ohio EPA settled a long-standing CERCLA natural resource damage claim against the site in November 2008. As part of the settlement, US DOE paid $13.75 million to compensate for natural resource injury. These settlement funds were appointed for restoration, replacement, or acquisition of equivalent natural resources at or near the Fernald Preserve. Following finalization of a Funds Utilization Plan in February 2010, the Fernald Natural Resource Trustees (composed of US DOE, Ohio EPA, and the US Department of the Interior and known collectively as the Trustees) used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The Trustees partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management. Since Fall 2012, more than 1,093 hectares (2,700 acres) have been permanently protected via easement or purchase. The Trustees are also partnering with MetroParks of Butler County, Ohio, to establish a nature preserve on acquired land. The Salamander Run Preserve is situated on 51 hectares (125 acres) of forest and former agricultural land approximately 11 kilometers (7 miles) north of the Fernald site. The land was purchased by Three Valley Conservation Trust and is undergoing ecological restoration using settlement funds. Upon completion, the property will be donated to MetroParks of Butler County, Ohio.(authors)
The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible, investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. In this paper, we apply the SCEQ algorithm (Cai and Judd, 2023) to solve a large-scale dynamic stochastic global land resource use problem with stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters and bounded shocks, the range of land conversion is considerably smaller for the dynamic stochastic model than for deterministic scenario analysis.
The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)
This paper describes the development and implementation of two ecological restoration projects at the Fernald Preserve that are funded through a CERCLA natural resource damage settlement. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)
A computer-based Natural Resources Information System was developed for the Bureaus of Indian Affairs and Land Management. The system stores, processes and displays data useful to the land manager in the decision making process. Emphasis is placed on the use of remote sensing as a data source. Data input consists of maps, imagery overlays, and on-site data. Maps and overlays are entered using a digitizer and stored as irregular polygons, lines and points. Processing functions include set intersection, union and difference and area, length and value computations. Data output consists of computer tabulations and overlays prepared on a drum plotter.
The author has identified the following significant results. An experimental procedure has been devised and is being tested for natural resource surveys to cope with the problems of interpreting and processing the large quantities of data provided by Skylab and ERTS. Some basic aspects of orbital imagery such as scale, the role of repetitive coverage, and types of sensors are being examined in relation to integrated surveys of natural resources and regional development planning. Extrapolation away from known ground conditions, a fundamental technique for mapping resources, becomes very effective when used on orbital imagery supported by field mapping. Meaningful boundary delimitations can be made on orbital images using various image enhancement techniques. To meet the needs of many developing countries, this investigation into the use of satellite imagery for integrated resource surveys involves the analysis of the images by means of standard visual photointerpretation methods.
Evapotranspiration (ET) is a climatic variable critical to the hydrologic cycle and is used to evaluate spatiotemporal trends in drought conditions. Although in-situ observations provide accurate ET information, these records are spatially sparse. The United States Department of Agriculture (USDA) Midwest Climate Hub, National Integrated Drought Information System, Minnesota Department of Agriculture, Michigan State University, and the USDA Foreign Agricultural Service have partnered with DEVELOP to gain new insights on spatiotemporal patterns of ET with NASA satellite data. This project evaluates the feasibility of using remotely sensed ET data products to understand trends from 2001 through 2020. Actual ET (aET) data were sourced from NASA’s Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and reference ET (refET) and precipitation data were sourced from the Gridded Surface Meteorological Dataset (gridMET). Spatial and temporal differences in the MODIS and gridMET data sets were resolved such that gridded data could be compared. These data sets were then used to produce monthly Normals maps of mm/8-day of precipitation, aET, and refET. Using precipitation and ET Normals maps, hydrologic state maps were produced by subtracting either refET or aET from precipitation. These hydrologic state maps provide a proxy water balance by summarizing the difference between water entering and leaving the ground surface. Additionally, the ET products were compared in timeseries plots. The ET products from this project provided partners with comparable datasets to assess potential drought and flooding conditions to support Midwest agricultural and natural resource managers in decision-making.
Natural resource inventory and monitoring in Oregon with ERTS-1 imagery