Search NASA⌕ Search

SEARCH · Search NASA

Results for “needs assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes Contributed to EDX (Work Product 2.1.c)

On September 30, 2021, a Needs Assessment Framework for Storage Complexes was completed for the SECARB-USA region by the Southern States Energy Board (SSEB) and The University of Texas at Austin Bureau of Economic Geology (UT-BEG). The Needs Assessment Framework for Storage Complexes documented a region-wide assessment to identify data needed to advance storage projects at sites of relevance to industrial, academic, and government stakeholders. The region-wide assessment addresses the needs of CO2 source, storage, and utilization stakeholders, finance and insurance institutions, state and local government agencies, local stakeholders at prospective storage complexes, environmental non-governmental organizations (NGOs), and others as identified by the Partners. This assessment was tested against various potential storage sites and modified to include site-specific issues, such as surface or pore space rights. The framework was provided to stakeholders for review and then used in other tasks, such as the ML initiative (Subtask 3.4) and storage complex readiness evaluation (Subtask 4.2). In accordance with the SOPO, this assessment satisfied completion of Work Product 2.1.b. The OSTI ID is 3015803, and the DOI link is https://doi.org/10.2172/3015803. On February 28, 2022, SSEB uploaded Work Product 2.1.b to NETL’s Energy Data eXchange (EDX). As such, Work Product 2.1.c is completed as documented below.

42 ENGINEERING↗

Safeguards Technology for Thorium Fuel Cycles: Research and Development Needs Assessment and Recommendations

This report presents Safeguards Technology for Thorium Fuel Cycles: Research and Development Needs Assessment and Recommendations prepared for the National Nuclear Security Administration (NNSA) Office of Defense Nuclear Nonproliferation Research and Development (DNN R&D) Safeguards Program by a multilaboratory team from Oak Ridge National Laboratory, Los Alamos National Laboratory, and Y-12 National Security Complex. It documents key findings of a 2-year scoping study on “Safeguards Technology Needs Assessment for Leading Thorium Fuel Cycles” (project OR18-V-SG Tec Needs Th Fuel Cycles-PD1Lb).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SECARB-USA: Needs Assessment Framework for Storage Complexes

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

54 ENVIRONMENTAL SCIENCES↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Next-Generation Marine Energy Software Needs Assessment

Over the past decade the marine energy industry has continued to grow and evolve, with new concepts and technologies constantly being pursued. Additionally, the field of computing is vastly different today than it was five or ten years ago. By utilizing advanced software and hardware architectures, like graphics processing units as well as parallelization and high-performance computing resources, software can produce higher quality outputs and a higher volume of outputs. These software and hardware resources can enable the marine energy community to exploit computational advancements from other research fields, which can include machine learning, differentiable programming, and controls co-design. Better integration of existing software and development of potential new software is necessary to take advantage of trends in modern computing and respond to the current and future needs of the marine energy community. In order to better understand the existing marine energy software landscape and industry needs, DOE's Water Power Technologies Office (WPTO) tasked Sandia National Laboratories and the National Renewable Energy Laboratory to update the needs assessment by identifying existing software gaps and software needs, and assisting WPTO in planning the next wave of marine energy software development. The proposed effort involved cataloguing and analyzing the available data on existing software related to marine energy. The marine energy software landscape has vastly changed in the last ten years. There are now nearly 230 different software packages utilized by the marine energy sector, compared to a decade ago when the Cardinal Engineering survey identified approximately 40 software packages. In 2012, the marine energy software landscape was captured in two tables, whereas the current marine energy software landscape required development of a software database to collect and categorize software.

16 TIDAL AND WAVE POWER↗

Summary of Massachusetts Clean Energy Center's Workforce Needs Assessment for the City of Lawrence

In July 2023, the Massachusetts Clean Energy Center (MassCEC) published an employment report titled “Powering the Future: A Massachusetts Clean Energy Workforce Needs Assessment.” This report was intended to support the State in meeting its 2030 decarbonization goals by identifying both existing workforce and training resources as well as gaps and barriers that need to be addressed in order to scale the State’s workforce to meet future demand. The following is a summary of the content that is relevant to Lawrence, MA. This was completed as part of the US Department of Energy’s Communities LEAP (Local Energy Action Program) Pilot supporting the Lawrence Stakeholders Coalition (LSC) led by Browning the Green Space in partnership with Groundwork Lawrence, All In Energy, and the City of Lawrence.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO 2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs of for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

42 ENGINEERING↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization.

42 ENGINEERING↗

Next-Generation Marine Energy Software Needs Assessment

The U.S. Department of Energy (DOE) Water Power Technologies Office’s (WPTO) initial investment in marine energy software was driven by needs identified over a decade ago. WPTO-funded research was first launched because of a U.S. congressional mandate that called for the DOE to officially research marine energy technologies, which also established the DOE WPTO in 2008. A congressional mandate requested the WPTO to evaluate a variety of marine energy devices, establish baseline levelized cost of energy estimates, and provide an overall report to Congress. This congressional mandate led to the Reference Model Project (RMP), for which WPTO funded a national multi-laboratory team to develop these reference models, based on state-of-the-art designs of six marine energy converter archetypes that consisted of three current energy converters and three wave energy converters (WEC). Each device was designed to operate for a specific marine resource, thus allowing the devices to serve as reference models for future studies. The RMP congressional report cited the need for improved marine energy software to handle a variety of device designs, as well as a need to standardize performance outputs. Without validated software packages and established metrics, information presented to the WPTO by technology developers could be incorrect or inaccurate and result in misleading conclusions. The recommendation to coordinate WPTO investment in software for numerical modeling and analysis was given a high priority because it would directly fill needs at the time, and focused funding would amplify impact. By sponsoring software development, WPTO would provide industry developers, university researchers, and national laboratories software that could be used, customized, and advanced, thus supporting the overall advancement of marine energy.

16 TIDAL AND WAVE POWER↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

Residents-as-Teachers Curriculum for Radiation Oncology: A Targeted Needs Assessment

Achieving competency as educators is increasingly recognized as a critical part of residents’ training in graduate medical education across specialties. In addition to teaching medical students, radiation oncology residents often play a vital role in peer and interprofessional education. We conducted a survey to identify the needs of radiation oncology residents for developing skills in teaching.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Clinical practice gaps and challenges in non‐alcoholic steatohepatitis care: An international physician needs assessment

Abstract Background and aims Even as several pharmacological treatments for non‐alcoholic steatohepatitis (NASH) are in development, the incidence of NASH is increasing on an international scale. We aim to assess clinical practice gaps and challenges of hepatologists and endocrinologists when managing patients with NASH in four countries (Germany/Italy/United Kingdom/United States) to inform educational interventions. Methods A sequential mixed‐method design was used: qualitative semi‐structured interviews followed by quantitative online surveys. Participants were hepatologists and endocrinologists practising in one of the targeted countries. Interview data underwent thematic analysis and survey data were analysed with chi‐square and Kruskal‐Wallis tests. Results Most interviewees ( n = 24) and surveyed participants (89% of n = 224) agreed that primary care must be involved in screening for NASH, yet many faced challenges involving and collaborating with them. Endocrinologists reported low knowledge of which blood markers to use when suspecting NASH (56%), when to order an MRI (65%) or ultrasound/FibroScan® (46%), and reported sub‐optimal skills interpreting alanine aminotransferase (ALT, 37%) and aspartate aminotransferase (AST, 38%) blood marker test results, causing difficulty during diagnosis. Participants believed that more evidence is needed for upcoming therapeutic agents; yet, they reported sub‐optimal knowledge of eligibility criteria for clinical trials. Knowledge and skill gaps when managing comorbidities, as well as skill gaps facilitating patient lifestyle changes were reported. Conclusions Educational interventions are needed to address the knowledge and skill gaps identified and to develop strategies to optimize patient care, which include implementing relevant care pathways, encouraging referrals and testing, and multidisciplinary collaboration, as suggested by the recent Global Consensus statement on NAFLD.

Lazure, Patrice↗

Probabilistic Risk Assessment Research Needs and Activities

Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.

97 MATHEMATICS AND COMPUTING↗

Assessment of Needs for a Neptunium Certified Reference Material

This document describes the results of a detailed assessment of needs within the Nuclear Analytical Chemistry (NAC) section at the US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) for a neptunium certified reference material (CRM) used for instrument calibrations and measurement control. Also included is a summary of input from several other organizations that expressed interest for such a reference material as well as a general needs analysis within the broader nuclear analytical community based on a literature search of publications describing measurements for neptunium.

36 MATERIALS SCIENCE↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

SECARB-USA: Data Quality Methodology

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no-go decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects.

54 ENVIRONMENTAL SCIENCES↗