Search NASA⌕ Search

SEARCH · Search NASA

Results for “non-fracture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Diagnostic Clast-Texture Criteria for Recognition of Impact Deposits

It is difficult to find definitive evidence for impact in the geological record because there are many endogenous geological processes that can produce diamictites similar to those generated by impact ejecta. The classic impact criteria of shock fabrics in certain minerals, and iridium layers, for example, may be either difficult to find, or long-since erased from the impact site (shock fabrics also anneal with time). It is important to be able to recognize impact-generated materials in order to understand earth's crustal development and biological evolution. In future exploration of Mars and other solar-system bodies, recognition of impact materials will be important for elucidating planetary evolution, planetary volatile inventories, and exobiological issues. The cobble depicted is typical of many that have been found in diamictite deposits in Belize generated by the Chicxulub K-T impact event. The pebbles are roughly-hewn in general shape with smoothed corners and edges. Surfaces are almost uniformly frosted (on both protuberances and hollows), but some asperities are glazed. Optical microscopy and thin-section petrographic microscopy reveal the frosting to be only a few microns thick, with a well-defined granular structure; grains are the same size as those composing the bulk of the limestone, but their clearer appearance may represent annealing. One or two adjacent pebble faces are often decorated with striated gouges and closely-spaced hemispherical depressions representing indentation hollows produced by well-rounded impacting clasts of up to 0.5 cm in diameter. Some of the impactors are still embedded in the cobble surface. Non-destructive x-ray diffraction techniques showed the impactors to be of the same mineralogy as the target cobble. We believe this unusual glazing and frosting to be related to the impact event, but this must be reconciled with its survival for over 60 my. since it is composed of one of the most alterable substances, CaCO3. We focus, however, on the non-fractured rounded pebbles that appear to have impacted the larger cobble as a swarm of clasts, probably encountered during ballistic flight. It cannot be defined whether the cobble swept through the pebble cloud, or the pebbles rained upon a slowermoving cobble. Two interesting questions arise: (1) Where did large numbers of such well rounded pebbles come from in the ejecta curtain?, and (2) How did they embed themselves in a nominally brittle rock without suffering damage? Are the well-rounded pebbles crystalline (devitrified) melt spherules? Further investigations are in progress. If the cobble was cold and brittle, impact of well-rounded pebbles would have produced Hertzian fracture patterns (a) in the virtually elastically isotropic cobble target. For penetration depths of about 0.5 of the impactor diameter, the pebbles would require a relative impact velocity sufficient to cause pebble fragmentation and crushing, and the development of a complex Hertzian-Boussinesq fracture field (b) involving deep fracturing and lateral surface spalling (impact velocities > 50 m/s). The existing relationship could only evolve by the impact of cold, hard pebbles into a soft, plastic cobble surface (c). For limestone to have been plastic, it must have been at elevated temperature, but to prevent calcification of the material, the ambient pressure must also have been elevated. This would be possible either in the impact's gas plume, or within the confines of a thin aerodynamically-produced shock bow generated by supersonic ballistic motion of the cobble. In the latter case, it is implied that the cobble swept through the pebbles rather than vice-versa. Although there are high T-P conditions associated with volcanism, such textures have not been reported on volcaniclastic materials, nor from other high T-P environments; e.g., metamorphic (as far as the authors are aware). We propose that this very easily recognizable embedding and indentation surface texture can be used as a diagnostic criterion for the recognition of impact ejecta. The term "peening texture" is suggested, because it is absolutely analogous to the plastic-deformation induced, metal-surface textures generated by ball-bearing bombardment used in engineering metallurgy to work-harden metal surfaces. Additional information is contained in the original (Figures).

Marshall, J. R.↗

Developing Approaches for Certification of Uninspectable Fracture Critical AM Components

Introduction - Human-rated spaceflight hardware is subject to the Fracture Control requirements in NASA-STD5019, which are intended to control the risk of component failure due to undetected cracks or defects. - All hardware in this mission class is classified for Fracture Control – Exempt, Non-fracture Critical, or Fracture Critical - Fracture Critical: A classification that identifies a part where failure due to the presence of a crack is a catastrophic hazard ➔ Pressure vessels, engine components, primary structure, etc. - Axiom 1: Material and manufacturing process produce structures and components with cracks or defects. - Axiom 2: The presence of a crack or defect of sufficient size reduces the strength and life of the structure. - Damage Tolerance: demonstration that a component can survive the service life (with a safety factor) in the presence of an undetected flaw or damage. - Components are manufactured from aerospace quality materials using controlled processes. - Components are inspected for damage (cracks, flaws, defects, etc.). - Components are shown by test or analysis to be tolerant to undetected flaws.

Will Tilson↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗