Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Nontechnical Barriers to Geothermal Development

Geothermal energy presents a significant opportunity for the United States (US). The US has the largest known geothermal resource in the world, with over 31 GW of conventional geothermal (i.e., hydrothermal) potential. Despite this, the development of geothermal power plants has lagged other renewable resources. Though some of the gaps stem from technical barriers numerous non-technical barriers are preventing geothermal energy from reaching its full potential. The gaps include a need to reduce the cost impacts of seismic risk, environmental risk, exploration, drilling and permitting cost risk, and reduced summer capacity on plant profitability. This report identifies pathways to overcome these barriers. We find that geothermal energy could increase its market presence by acting as a complement to lower cost renewables, providing flexible or baseload power in low carbon scenarios. We also outline several contractual and operational strategies (including the use of hybrid systems) that plant operators can pursue to improve the value of their resource, such as multi part remuneration mechanisms that guarantee revenue (e.g., availability payments or a Contract for Differences approach) or resource risk hedging approaches (e.g., shaped market products and portfolio resource approaches).

15 GEOTHERMAL ENERGY↗

Pathways to Overcome Geothermal Deployment Barriers

Geothermal resources represent a vast domestic energy supply that can provide a fexible and reliable source of electricity as well as contribute to clean energy goals. In the United States, geothermal exploration and development are subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level. These are necessary to address potential environmental and resource impacts at geothermal project sites, but may act as barriers to geothermal deployment, slowing timelines and raising costs. The 2022 NREL report, Non-Technical Barriers to Geothermal Development in California and Nevada, presents fndings of a study on non-technical barriers that may infuence geothermal project development.

geothermal↗

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Expert and operator perspectives on barriers to energy efficiency in data centers

Abstract It was last estimated in 2016 that data centers (DCs) comprise approximately 2% of total US electricity consumption. However, this estimate is currently being updated to account for the massive increase in computing needs due to streaming, cryptocurrency, and artificial intelligence (AI). To prevent energy consumption that tracks with increasing computing needs, it is imperative we identify energy efficiency strategies and investments beyond the low-hanging fruit solutions. In a two-phased research approach, we ask: What non-technical barriers still impede energy efficiency (EE) practices and investments in the data center sector, and what can be done to overcome these barriers? In particular, we are focused on social and organizational barriers to EE. In Phase I, we performed a literature review and found that technical solutions are abundant in the literature, but fail to address the top-down cultural shifts that need to take place in order to adapt new energy efficiency strategies. In Phase II, reported here, we interviewed 16 data center operators/experts to ground-truth our literature findings. Our interview protocols focus on three aspects of DC decision-making: procurement practices, metrics and monitoring, and perceived barriers to energy efficiency. We find that vendors are the key drivers of procurement decisions, advanced efficiency metrics are facility-specific, and there is convergence in the design of advanced facilities due to the heat density of parallelized infrastructure. Our ultimate goals for our research are to design DC decarbonization policies that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Deep Learning for Modeling Enhanced Geothermal Systems

Enhanced Geothermal Systems (EGS) offer a vast potential to expand the use of geothermal energy. Heat is extracted from this engineered system by injecting cold water into a subsurface fractures, which are in contact with the hot dry rock, and pulled through the production wells. Creating EGS requires improving the natural permeability of hot crystalline rocks. To develop economically viable EGS reservoirs, significant technical barriers (e.g., better stimulation technologies without adequate water and/or permeability) and non-technical barriers (e.g., land access and permitting) must be overcome. In this short conference paper, we present a workflow to address a part of this challenge – “How to develop economically viable EGS using existing technologies?”. Our workflow called the GeoThermalCloud (GTC) for EGS, leverages recent advances in machine learning, deep learning, and cloud computing. This GTC framework is open-source and available at https://github.com/SmartTensors/GeoThermalCloud.jl. The GTC framework provides trained deep learning (DL) models to estimate the net present value of a given EGS design scenario. The Geothermal Design Tool (https://github.com/GeoDesignTool/GeoDT.git), a fast and simplified multi-physics solver, is used to develop a database for training DL models. The database consists of EGS design parameters (inputs to DL model) and their net present value (output of DL model) in uncertain geologic systems. The EGS design parameters for constructing this training database are based on Utah FORGE but include the options of more wells and deeper depths. The DL models are trained by ingesting the EGS design parameters and estimating the corresponding net present value. Such an emulation allows us to screen various EGS designs quickly and identify good development strategies by coupling them with optimization techniques. Our preliminary results show promise in DL emulation of net present value. However, a lot more work is needed to improve the predictive capability of DL models (i.e., extensive hyperparameter tuning is necessary). This will be the primary focus of our future work.

artificial neural networks, geothermal↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Organizational and psychological measures for data center energy efficiency: barriers and mitigation strategies

Abstract It was last estimated that in 2020, data centers comprised approximately 2% of total US electricity consumption, with an estimated annual growth rate of 4%. As our country increasingly relies on information technology (IT), our data centers (DCs) will need to increase their energy efficiency (EE) to stabilize their energy consumption. The task of studying EE in DCs is complicated by the interconnected nature of humans and mission-critical technical systems. Moreover, the literature tends to focus on technology solutions such as improvements to IT equipment, cooling infrastructure, and software, without addressing organizational and psychological drivers. Our research demystifies the complex interactions between humans and DCs, by asking What non-technical barriers impede EE investment decision-making and/or implementing energy management strategies? To begin to answer this question, we perform a literature review of 86 resources, ranging from peer-reviewed journal publications to handbooks. We also consider related fields such as organizational behavioral management and energy intensive buildings. We develop a public Zotero library, perform content coding, and complete a rudimentary network analysis. Our findings from the literature review suggest that (1) technological solutions are abundant in the literature but fall short of providing practical guidance on the pitfalls of implementation, (2) making energy efficiency a priority at the executive level of organizations will be largely ineffective if the IT and facilities staff are not directly incentivized to increase EE, and (3) there is minimal current understanding of how the individual psychologies of IT and facilities staff affect EE implementation in DCs. In the next phase of our research, we plan to interview data center operators/experts to ground-truth our literature findings and collaboratively design decarbonization policy solutions that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Towards developing multiscale-multiphysics models and their surrogates for digital twins of metal additive manufacturing

Artificial intelligence (AI) embedded within digital models of manufacturing processes can be used to improve process productivity and product quality significantly. The application of such advanced capabilities particularly to highly digitalized processes such as metal additive manufacturing (AM) is likely to make those processes commercially more attractive. AI capabilities will reside within Digital Twins (DTs) which are living virtual replicas of the physical processes. DTs will be empowered to operate autonomously in a diagnostic control capacity to supervise processes and can be interrogated by the practitioner to inform the optimal processing route for any given product. The utility of the information gained from the DTs would depend on the quality of the digital models and, more importantly, their faster-solving surrogates which dwell within DTs for consultation during rapid decision-making. In this article, we point out the exceptional value of DTs in AM and focus on the need to create high-fidelity multiscale-multiphysics models for AM processes to feed the AI capabilities. We identify technical hurdles for their development, including those arising from the multiscale and multiphysics characteristics of the models, the difficulties in linking models of the subprocesses across scales and physics, and the scarcity of experimental data. We discuss the need for creating surrogate models using machine learning approaches for real-time problem-solving. We further identify non-technical barriers, such as the need for standardization and difficulties in collaborating across different types of institutions. We offer potential solutions for all these challenges, after reflecting on and researching discussions held at an international symposium on the subject in 2019. Here, we argue that a collaborative approach can not only help accelerate their development compared with disparate efforts, but also enhance the quality of the models by allowing modular development and linkages that account for interactions between the various sub-processes in AM. A high-level roadmap is suggested for starting such a collaboration.

36 MATERIALS SCIENCE↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Commercial Hypersonic Transportation Market Study

In support of NASA’s evaluation of its future research thrusts for its hypersonics program, NASA commissioned independent studies of the market for commercial hypersonic transportation. SAIC and BryceTech (formerly Bryce Space and Technology) were awarded one of these independent studies to assist NASA in better understanding: (1) the passenger demand for high-speed aviation travel; (2) the pressures on the business case for developing and operating a hypersonic aircraft for the commercial aviation market; and (3) the non-technical (i.e., societal) barriers and challenges, including the steps NASA and the Government could take to overcome those barriers and challenges. Our approach to addressing these three tasks for NASA included modeling future demand and future business operations, considering global air transportation at speeds of Mach 2 to Mach 7. The team forecast premium air travel demand through 2060 and assessed the willingness of passengers of different income and wealth levels to pay to save time on flights between 800 city pairs. With the total addressable market defined, we examined industry-level business case viability for several aircraft speed and range cases. Considering operating and manufacturing costs for routes that could be serviced profitably, as well as typical profitability targets for the aviation industry, we quantified the level of RDT&E funding available to support each business case.

hypersonic aircraft↗

Independent Market Study: Commercial Hypersonic Transportation

In support of NASA’s evaluation of its future research thrusts for its hypersonics program, NASA commissioned independent studies of the market for commercial hypersonic transportation. SAIC and BryceTech (formerly Bryce Space and Technology) were awarded one of these independent studies to assist NASA in better understanding: (1) the passenger demand for high-speed aviation travel; (2) the pressures on the business case for developing and operating a hypersonic aircraft for the commercial aviation market; and (3) the non-technical (i.e., societal) barriers and challenges, including the steps NASA and the Government could take to overcome those barriers and challenges. Our approach to addressing these three tasks for NASA included modeling future demand and future business operations, considering global air transportation at speeds of Mach 2 to Mach 7. The team forecast premium air travel demand through 2060 and assessed the willingness of passengers of different income and wealth levels to pay to save time on flights between 800 city pairs. With the total addressable market defined, we examined industry-level business case viability for several aircraft speed and range cases. Considering operating and manufacturing costs for routes that could be serviced profitably, as well as typical profitability targets for the aviation industry, we quantified the level of RDT&E funding available to support each business case.

hypersonic aircraft↗