Search NASA⌕ Search

SEARCH · Search NASA

Results for “nontechnical barriers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Model results and data for Nontechnical Barriers to Geothermal Development

Data included in this submission support the analysis conducted for the report "Nontechnical Barriers to Geothermal Development" which is linked bellow. These data include information about the power purchase agreements (PPAs) analyzed for the report, inputs and model results for the pro forma economic analysis, and outputs from the regression analysis conducted on PPAs comparing geothermal and other power generation technologies.

15 GEOTHERMAL ENERGY↗

Salton Sea Geothermal Development: Nontechnical Barriers to Entry – Analysis and Perspectives

Geothermal energy offers an opportunity to generate baseload, renewable energy that can help support the transition to an energy economy with reduced impacts on climate change and replace older, more expensive, nonrenewable, and more resource-impacting energy-generation facilities. The United States has the largest known geothermal resource in the world, with over 31 GW of conventional geothermal potential. However, due to market conditions, an inability to properly quantify both electrical grid benefits and resource stability, and the difficulty of exploring and developing the geothermal resource, few new geothermal projects have come online over the past three decades. The Salton Sea, in Imperial County, California, provides a prime location and opportunity to develop new geothermal resources. The Salton Sea contains a robust, well-mapped, geothermal resource, with opportunities for concurrent development of lithium and other mineral resources. This report describes the history of geothermal development at the Salton Sea and compares geothermal to other renewable energy sources in the area. The report then uses a techno-economic analysis (TEA) model to analyze the relative benefits and costs of various challenges and opportunities and provides recommendations for streamlining geothermal development at the Salton Sea and elsewhere. The challenges and opportunities analyzed in the TEA model were informed by stakeholder interviews and literature reviews. Based upon the identified challenges and opportunities and the results of the TEA model, primary findings are that certain nontechnical barriers such as permitting costs play only a minor role in determining the viability of development of the geothermal resource at the Salton Sea. Other barriers such as permitting timelines, government/agency coordination, and the potential co-location of lithium extraction with a geothermal plant may result in much larger impacts on project viability.

15 GEOTHERMAL ENERGY↗

Nontechnical Barriers to Geothermal Development

Geothermal energy presents a significant opportunity for the United States (US). The US has the largest known geothermal resource in the world, with over 31 GW of conventional geothermal (i.e., hydrothermal) potential. Despite this, the development of geothermal power plants has lagged other renewable resources. Though some of the gaps stem from technical barriers numerous non-technical barriers are preventing geothermal energy from reaching its full potential. The gaps include a need to reduce the cost impacts of seismic risk, environmental risk, exploration, drilling and permitting cost risk, and reduced summer capacity on plant profitability. This report identifies pathways to overcome these barriers. We find that geothermal energy could increase its market presence by acting as a complement to lower cost renewables, providing flexible or baseload power in low carbon scenarios. We also outline several contractual and operational strategies (including the use of hybrid systems) that plant operators can pursue to improve the value of their resource, such as multi part remuneration mechanisms that guarantee revenue (e.g., availability payments or a Contract for Differences approach) or resource risk hedging approaches (e.g., shaped market products and portfolio resource approaches).

15 GEOTHERMAL ENERGY↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Apollo-Soyuz US-USSR joint mission results

The technical and nontechnical objectives of the Apollo-Soyuz mission are briefly considered. The mission demonstrated that Americans and Russians can work together to perform a very complex operation, including rendezvous in space, docking, and the conduction of joint experiments. Certain difficulties which had to be overcome were partly related to differences concerning the role of the astronaut in the basic alignment and docking procedures for space vehicles. Attention is also given to the experiments conducted during the mission and the approach used to overcome the language barrier.

Bean, A. L.↗