Search NASA⌕ Search

SEARCH · Search NASA

Results for “notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Direct memory access transfer completion notification

Methods, apparatus, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA engine on an origin compute node in an injection FIFO buffer, a data descriptor for an application message to be transferred to a target compute node on behalf of an application on the origin compute node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying an address of a completion notification field in application storage for the application; transferring, by the origin DMA engine to the target compute node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that the transfer of the message is complete, including performing a local direct put operation to store predesignated notification data at the address of the completion notification field.

Archer, Charles J↗

Direct memory access transfer completion notification

DMA transfer completion notification includes: inserting, by an origin DMA engine on an origin node in an injection first-in-first-out (`FIFO`) buffer, a data descriptor for an application message to be transferred to a target node on behalf of an application on the origin node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying a packet header for a completion notification packet; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; sending, by the origin DMA engine, the completion notification packet to a local reception FIFO buffer using a local memory FIFO transfer operation; and notifying, by the origin DMA engine, the application that transfer of the message is complete in response to receiving the completion notification packet in the local reception FIFO buffer.

97 MATHEMATICS AND COMPUTING↗

Direct memory access transfer completion notification

Methods, systems, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA on an origin node in an origin injection FIFO, a data descriptor for an application message; inserting, by the origin DMA, a reflection descriptor in the origin injection FIFO, the reflection descriptor specifying a remote get operation for injecting a completion notification descriptor in a reflection injection FIFO on a reflection node; transferring, by the origin DMA to a target node, the message in dependence upon the data descriptor; in response to completing the message transfer, transferring, by the origin DMA to the reflection node, the completion notification descriptor in dependence upon the reflection descriptor; receiving, by the origin DMA from the reflection node, a completion packet; and notifying, by the origin DMA in response to receiving the completion packet, the origin node's processing core that the message transfer is complete.

97 MATHEMATICS AND COMPUTING↗

Expedited Demolition Notification for 2nd Quarter CY 2012 Structures

The National Nuclear Security Administration and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosures. These structures have been identified to receive funding and be demolished prior to the 3rd Quarter Demolition Notification (June 30, 2012). This letter is a follow up to the email that was sent to the NMED-HWB on April 17, 2012. The enclosures attached to this letter satisfy the reporting requirements as outlined in Section 1.17 of the LANL Hazardous Facility Waste Permit (Permit). Demolition of buildings that appear on this list will not occur until 30 days after NMED has received this notification.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A Reliability Study on the ALERTUS Emergency Management Notification System

Sandia National Laboratories conducted a reliability analysis on the Alertus mass notification system to determine if improvements need to be made to the system to increase reliability. The Alertus mass notification system for Building 803 was analyzed with a set number of components. The components, their associated failure modes and failure mode rates were inputted into a fault tree in the SAPHIRE software which calculated the reliability of the system to be 0.998269.

97 MATHEMATICS AND COMPUTING↗

Interpreting Forced Oscillation Notifications from ESAMS: General Guidance for Reliability Coordinators

The Eastern Interconnection Situational Awareness Monitoring System (ESAMS) project demonstrated the feasibility of aggregating synchrophasor measurements from across an interconnection, analyzing them, and providing real-time wide-area situational awareness to system operators who may have excellent visibility within their footprint but lack an interconnection-wide view. An application within ESAMS that has garnered industry interest involves detecting forced oscillations visible across multiple areas, identifying the region where the oscillation originated from, quantifying the uncertainty in source localization results, and notifying users in real-time if the detected oscillation amplitudes cross a specified threshold. It is expected that system operators will utilize their internal SCADA/EMS/synchrophasor systems in conjunction with information provided by ESAMS to take effective mitigation actions if forced oscillation notifications are received. This report provides some general guidance on how the ESAMS information can be used for source localization and coordination among multiple reliability coordinators; and also identifies potential enhancements to ESAMS notifications for improved interpretability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of Asynchronous Communication Operations through Eager Notifications

UPC++ is a C++ library implementing the Asynchronous Partitioned Global Address Space (APGAS) model. We propose an enhancement to the completion mechanisms of UPC++ used to synchronize communication operations that is designed to reduce overhead for on-node operations. Our enhancement permits eager delivery of completion notification in cases where the data transfer semantics of an operation happen to complete synchronously, for example due to the use of shared-memory bypass. This semantic relaxation allows removing significant overhead from the critical path of the implementation in such cases. We evaluate our results on three different representative systems using a combination of microbenchmarks and five variations of the the HPCChallenge RandomAccess benchmark implemented in UPC++ and run on a single node to accentuate the impact of locality. We find that in RMA versions of the benchmark written in a straightforward manner (without manually optimizing for locality), the new eager notification mode can provide up to a 25% speedup when synchronizing with promises and up to a 13.5x speedup when synchronizing with conjoined futures. We also evaluate our results using a graph matching application written with UPC++ RMA communication, where we measure overall speedups of as much as 11% in single-node runs of the unmodified application code, due to our transparent enhancements.

Kamil, Amir↗

Asynchronous data change notification between database server and accelerator controls system

Database data change notification (DCN) is a commonly used feature. Not all database management systems (DBMS) provide an explicit DCN mechanism. Even for those DBMS's which support DCN (such as Oracle and MS SQL server), some server side and/or client side programming may be required to make the DCN system work. This makes the setup of DCN between database server and interested clients tedious and time consuming. In accelerator control systems, there are many well established software client/server architectures (such as CDEV, EPICS, and ADO) that can be used to implement data reflection servers that transfer data asynchronously to any client using the standard SET/GET API. This paper describes a method for using such a data reflection server to set up asynchronous DCN (ADCN) between a DBMS and clients. This method works well for all DBMS systems which provide database trigger functionality. Asynchronous data change notification (ADCN) between database server and clients can be realized by combining the use of a database trigger mechanism, which is supported by major DBMS systems, with server processes that use client/server software architectures that are familiar in the accelerator controls community (such as EPICS, CDEV or ADO). This approach makes the ADCN system easy to set up and integrate into an accelerator controls system. Several ADCN systems have been set up and used in the RHIC-AGS controls system.

43 PARTICLE ACCELERATORS↗

Exploring the Early Lightning Notification of an Electric Field Mill at the Savannah River Site

At the Savannah River Site (SRS), employees receive automated broadcast notification about lightning only after three strikes have already occurred near the site boundary. To increase employee safety, it is preferential to give employees lead time before lightning strikes occur. We compared measurements from an on-site electric field mill to lightning detection data from the National Lightning Detection Network and the Geostationary Lightning Mapper. Using a difference threshold, we determined that the electric field mill provided a lead time greater than 6 minutes for 95% of lightning events from 2009-2020, with an average lead time of 56 minutes. Detection of events were limited to a 7-mile radius around the field mill. We also identified that the field mill threshold generated many false detections not clearly identified. False detections and detections from only precipitation can be reduced by using a second threshold without creating too many missed detections (Type II errors). The two thresholds used together provide the best information about rapidly changing electric fields and aid in advanced detection necessary to improve the lightning warning system used at SRS.

42 ENGINEERING↗

Enhanced Explicit Congestion Notification (EECN) in TCP with P4 Programming

In current TCP/IP networks, TCP mainly relies on packet drops as an indication of congestion. With the emergence of Explicit Congestion Notification (ECN), TCP can detect the congestion through packets with marked bits instead of dropped packets. ECN thus reduces the unnecessary delay due to packet drops, especially for bandwidth-delay sensitive connections. However, ECN still relies on the receiver for congestion indication, which incurs a round trip time (RTT) before the sender can react to the congestion. In network environments with a high bandwidth-delay product (BDP), this could be problematic. In this paper, we present an enhanced ECN mechanism for the early detection of congestion using P4 programming. In our proposed scheme, the sender does not have to wait for the receiver to indicate congestion because switches in the network can indicate congestion. We evaluate our scheme comparing our proposed solution with standard TCP and TCP with the conventional ECN. Experimental results show that our scheme outperforms ECN as the RTT grows.

ECN↗

Expedited Demolition Notification for Structures at Technical Area 54

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosure. These structures have recently been identified to receive funding and be demolished. Structure TA-54-0296 will be demolished prior to December 30, 2012. The remaining structures covered by this notification will be demolished within the January 1, 2013 through March 31, 2013 quarter.

42 ENGINEERING↗

Notification of General Class 1 Permit Modification for the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit). The text modifications are provided herein and have been made to the Permit by the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS), collectively the Permittees. The modifications to the text of the Permit have been identified using red text and red lines through the texts for deletions. Description: This modification includes three changes. One change includes an address change within the Attachment D, Contingency Plan, and the remaining changes correct two typographical errors in Permit Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notification of Class 1 Permit Modification to Attachment B, Part A Application for the Los Alamos National Laboratory Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit) issued to the Department of Energy and the Los Alamos National Security, LLC, collectively known as the Permittees, in November 2010. All changes have been made to Attachment B, Part A Application, and a full, updated form, Revision 10.0, is enclosed. The modification updates the facility contact and address information, and the process codes and design capacity section for Technical Area (TA) 14; TA-16; TA-39; TA-54 West; TA-54, Area G; and TA-55 within the Attachment B, Part A Application. The process codes and design capacity section for TA-14, TA-16, and TA-39 was updated to incorporate a statement that the Permittees have notified of the intent to close units at these locations. The process design capacity for TA-54, Area G has been updated from 3,664,150 gallons to 4,346,590 gallons to account for the TA-54, Area G Pad 11 container storage unit that was added when the Permit was issued in 2010 but at the time did not previously store hazardous waste. The number of units at TA-54, Area G was also updated to 9 units to include this new unit. The process design capacity for TA-55 has also been updated from 178,500 gallons to 207,600 gallons to incorporate the addition of the TA-55-185 container storage unit that was also added when the Permit was issued. The number of storage units at TA-55 was updated to 7 to include the unit. The process design capacity at TA-54 West was changed to 11,660 gallons to correct a typographical error in previous versions of the form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct memory access transfer completion notification

Methods, compute nodes, and computer program products are provided for direct memory access (`DMA`) transfer completion notification. Embodiments include determining, by an origin DMA engine on an origin compute node, whether a data descriptor for an application message to be sent to a target compute node is currently in an injection first-in-first-out (`FIFO`) buffer in dependence upon a sequence number previously associated with the data descriptor, the total number of descriptors currently in the injection FIFO buffer, and the current sequence number for the newest data descriptor stored in the injection FIFO buffer; and notifying a processor core on the origin DMA engine that the message has been sent if the data descriptor for the message is not currently in the injection FIFO buffer.

Chen, Dong↗

Methods, apparatus and system for notification of predictable memory failure

A method for providing notification of a predictable memory failure includes the steps of: obtaining information regarding at least one condition associated with a memory; calculating a memory failure probability as a function of the obtained information; calculating a failure probability threshold; and generating a signal when the memory failure probability exceeds the failure probability threshold, the signal being indicative of a predicted future memory failure.

97 MATHEMATICS AND COMPUTING↗

Notification of Concurrence - K-25/K-27 D&D Project, ETTP - Change Number of EMWMF Waste Lots in the Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the ETTP, Oak Ridge, TN From Two to Three

Section 5.1 of the approved Waste Handling Plan for Demolition ofthe K-25 and K-2 7 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (WHP) includes two Environmental Management Waste Management (EMWMF) waste lots: (1) Asbestos-contaminated roofing/transite; and (2) Construction debris, such as nonasbestos roofing, structural steel/miscellaneous metal/equipment, nonradiological piping, wood, and miscellaneous small quantities of concrete. This concurrence form adds an additional EMWMF waste lot 6.47 for lavatory sink drains. Based on an analysis of the building structure characterization data, the only individual building structure with either an analytic carcinogenic or Hazard Index (HI) sum-of-fractions (SOF) greater than 1 is the lavatory sink drains (Table 1). The HI SOF for the lavatory sink drains is 1.34 (Table 2). When all media are combined with the material of construction calculations, the HI SOF is 1.22 (Table 3). However, when the lavatory sink drains are segregated from all other media, the HI SOF is only 0.256, which is well below the EMWMF waste acceptance criteria SOF limit of 1 (Table 4). Given the large volume (124, 625 cubic yards) of other building structure media with a small HI SOF of 0.256 and the small volume (one cubic yard) of lavatory sink drains with a large HI SOF of 1.34, a separate waste lot for lavatory sink drains is recommended. Lead is the primary contributor to the large HI SOF in the lavatory sink drains. Lead in the lavatory sink drains was shown using the Wilcoxon rank-sum test statistically to have higher concentrations than all other building structure media combined. Other analytes having statistically different median concentrations in the lavatory sink drains compared to all other media are antimony, arsenic, boron, cadmium, selenium, solver, vanadium, zinc, mercury, strontium, and Uranium-233/234 (Table 5). A separate waste lot for the lavatory sink drains minimizes the volume weighted sum-of fractions since a much smaller volume of waste will have the higher HI SOF of 1.34, while a much larger volume of waste will have a small HI SOF of 0.256.

54 ENVIRONMENTAL SCIENCES↗