Recovery from Missed Thrust During Gateway's NRHO Insertion Using Auxiliary Propulsion
Results are presented by which a high thrust reaction control system (RCS) can be used to complete insertion of the Gateway into a Near Rectilinear Halo Orbit (NRHO) in the event of a missed thrust event (MTE).Recovery solutions are presented in terms of the response time afforded, the ∆v required, and the NRHO insertion delay relative to the reference trajectory. Results are presented for methodologies that maintain the reference trajectory NRHO insertion epoch as well as those that optimize this insertion epoch in order to buy down recovery costs and increase the robustness of solutions. This analysis presents solutions which, in the event of an MTE during NRHO insertion, enable RCS recoveries that require under 20 m/s ∆v and less than four days of NRHO insertion delay.