Search NASA⌕ Search

SEARCH · Search NASA

Results for “offshore wind ports”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Offshore Wind Energy Fundamentals for Bangladesh [Slides]

Bangladesh is aiming to limit emissions, and gain access to cleaner, more efficient technologies to support economic growth as the nation strives to achieve high-income status by 2041. Bangladesh identified that it has a potential for offshore wind energy, especially at hub heights of 140 to 160 meters, which is pivotal in diversifying the country's energy mix and ensuring energy security. This one-day webinar is funded by the United States Agency for International Development (USAID) through two projects: (1) Reinforcing Advanced Energy Systems (RAES) project, implemented by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), and (2) Bangladesh Advancing Development and Growth through Energy (BADGE) project, implemented by Tetra Tech.

17 WIND ENERGY↗

Wind Energy Supply Chain Deep Dive Assessment

The Wind Energy Supply Chain Deep Dive Assessment finds that the U.S. wind supply chain is nascent for offshore wind and mature for land-based wind, but U.S. competitiveness is declining in key wind turbine components. Continued decarbonization of the U.S. grid and economy with domestically supplied wind technology will require innovation to increase U.S. manufacturing competitiveness; investment in logistics and infrastructure, such as offshore wind ports and vessels; and policies to provide a strong and stable demand signal to support accelerated investment in the wind supply chain.

17 WIND ENERGY↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗

Seventh Oregon Climate Assessment

Consistent with its charge under Oregon House Bill 3543, the Oregon Climate Change Research Institute (OCCRI) conducts a biennial assessment of the state of climate change science, including biological, physical, and social science, as it relates to Oregon and the likely effects of climate change on Oregon. This seventh Oregon Climate Assessment, which builds on the previous assessments, is structured with the goal of supporting the state's mitigation planning for natural hazards and implementation of the Oregon Climate Change Adaptation Framework.

17 WIND ENERGY↗

Offshore Wind Guide

The WINDExchange Offshore Wind Energy Guide is a foundational resource that introduces the major concepts and topics within offshore wind energy: project anatomy and component characteristics; the project development process; siting of turbines and other infrastructure; state and local involvement in offshore wind energy development; community impacts; public engagement in decision making and planning; Tribal considerations; economic impacts; supply chain, ports, and vessels, and workforce. This guide is intended to provide information and resources that can build a foundation of knowledge and understanding about offshore wind energy and create a launching point for readers to seek out additional information about the topics and issues of interest to them.

17 WIND ENERGY↗

IEA Wind TCP Task 49: Reference Site Conditions for Floating Wind Arrays

This report, prepared within Work package 1 of IEA Wind Task 49, presents reference site conditions for floating wind arrays to serve as a design basis for the techno-economic design of reference floating wind arrays. Data of the reference sites presented here are publicly available in an open database and thus support fast development and comparable design of floating wind arrays for various relevant conditions. The development of these reference sites drew on existing open access datasets and ongoing research projects of task participants. Six classes were identified that describe relevant key conditions for the design and development of floating wind arrays: met-ocean conditions, seabed conditions, coastal infrastructure, environmental impact, socio-economic impact, as well as regulations and permissions. The reference sites for the techno-economic design of floating wind arrays are based on a concept with building blocks to synthesize purpose-built site representations. In each of the identified classes with influencing design factors, building blocks are used to describe the characteristic properties and their spread. However, the latter three classes (i.e., environmental impact, socio-economic impact, regulations and permissions) are not included in the reference site conditions due to limited knowledge and lack of reliable criteria to quantify their impact on the techno-economic design in numeric parameters. Building blocks with key parameters for the techno-economic design of floating wind arrays are provided for met-ocean conditions, seabed conditions, and coastal infrastructure. For met-ocean conditions, multiple sites were selected for detailed analysis that represent a range of conditions across the pipeline of floating wind projects. Wind conditions and sea states are separated, and each location considers both the severity of wind and waves e.g. one site may have a moderate wave condition but severe wind condition. From this pipeline, eleven representative sites were selected where both site-specific analysis was available within the consortium, and where they represent different parts of the global pipeline. The eleven sites are: Hannibal (Italy), Humboldt (US), Ulsan (South Korea), MoneyPoint One (Ireland), Havbredey (UK), Fukushima (Japan), Utsira Nord (Norway), Gulf of Maine (US), Sud de la Bretagne II (France), Sorlige Nordsjo II (Norway). Each of these sites is summarized in the main report while more details about the studies and analyses behind the datasets are provided in the appendix. For seabed conditions, general information about the geotechnical parameters is provided and a baseline is established for the geotechnical parameters and stratigraphy that may be encountered on the sites. A set of six 'synthetic cases' is defined as building blocks providing the different parameters required for design under each case/soil condition. For the coastal infrastructure, general information about the main requirements is provided that a port should comply with to provide a satisfactory service during the construction of floating offshore wind arrays. Minimum port infrastructural requirements are provided for three types of ports.

17 WIND ENERGY↗

Feasibility of Ocean-Based Renewable Energy in the Gulf of Mexico

This paper summarizes a comprehensive feasibility assessment of six offshore renewable energy sources in the Gulf of Mexico (GOM) to potentially provide utility-scale electricity from the Outer Continental Shelf (federal waters) and state waters to land-based grids. Overall, the primary objective is to inform future energy planning. The authors evaluated offshore wind, wave energy, tidal energy, ocean-based solar photovoltaics (PV), ocean current, and ocean thermal energy conversion. Of these energy resources, offshore wind was the most viable option and was the focus of the second part of the study. The technical challenges of developing offshore wind in the GOM are discussed including hurricane design for turbines and substructures, as well as turbine solutions to overcome lower wind regimes. In addition, advantages to offshore wind development in the GOM are described including proximity to oil and gas supply chains. Economic analysis using established cost models at the National Renewable Energy Laboratory identified hypothetical project locations where net value of offshore wind was the highest, and the levelized cost of energy (LCOE) was calculated for three sites: Port Isabel, Port Arthur, and Pensacola. Offshore wind LCOE in the GOM was found to be higher than those in sites along the north and mid-Atlantic coasts, but decreasing cost trajectories indicate the possibility of economic viability for locations in Texas and west Louisiana after 2030. The extrapolated 2030 LCOE values range from 73 dollars per MWh (Site 1, Port Isabel) and 79 dollars per MWh (Site 3, Port Arthur) to 91 dollars per MWh (Site 5, Pensacola).

16 TIDAL AND WAVE POWER↗

New England Aqua Ventus I: 100% Hull Design (Final Technical Report)

This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.

17 WIND ENERGY↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

Offshore Wind Energy and Communities: Perspectives on Local Impacts [Slides]

In this webinar hosted by the U.S. Department of Energy's WINDExchange initiative, an expert panel discusses the myriad ways that offshore wind may impact communities. Impacted communities can take a variety of forms, from coastal communities hosting ports and cable landings to ocean users such as commercial fishermen, and can experience a range of environmental, economic, cultural, and other impacts related to offshore wind energy. This webinar explores these topics from diverse perspectives and provides an introduction to the local footprints of this emerging industry.

17 WIND ENERGY↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY↗

The Costs and Feasibility of Floating Offshore Wind Energy in the O'ahu Region

The State of Hawai'i has set a target to achieve a 100% Renewable Portfolio Standard (RPS) by 2045, and is well suited to become the first state to achieve this goal due to its relatively small load, high electricity prices, heavy reliance on imported fossil fuels, and favorable conditions for wind and solar. The Bureau of Ocean Energy Management contracted NREL to conduct a cost and feasibility study to provide information to decision makers on Hawai'i about the viability of floating offshore wind to be a part of the 100% RPS. We used NREL's Offshore Regional Cost Analyzer (ORCA) spatial cost model to evaluate the Levelized Cost of Energy (LCOE) in the region surrounding O'ahu as this is the island with the highest energy demand. The ORCA results showed that LCOE could range from around $\$$83 MWh to $\$$194 MWh for commercial operation dates in 2019 but has the potential to decrease to $\$$48 MWh - $\$$109 MWh by 2032 due to maturing global supply chains, increasing turbine rating, and new technological innovations. These costs are expected to be competitive with global floating wind costs in the early 2030s. The strong wind resource, proximity to infrastructure on land, and benign metocean conditions can potentially compensate for the logistical complexities of installing projects in Hawai'i far from mainland supply chains if sufficient investments are made to develop ports, grid infrastructure, and workforce on O'ahu to support the construction and operation of offshore wind projects. In addition to the cost results, this report also discusses the likely technologies that would comprise floating wind projects near O'ahu, the existing infrastructure available to projects, unique conditions facing offshore wind in the region such as exposure to hurricanes and limits on allowable export cable capacity, newly developed wind resource data sets for the region, and local stakeholder perspectives on offshore wind.

17 WIND ENERGY↗

Offshore Wind in the US Gulf of Mexico: Regional Economic Modeling and Site-Specific Analyses

The goal of this study is to assess offshore wind energy resources in the Gulf of Mexico (GOM) and to quantify its technical and economic potential in order to inform Federal and GOM state strategic energy planning over the next decade. The objectives are to: describe site-specific and regional benefits and challenges of deploying offshore wind in the GOM and discuss the current research to mitigate challenges; review and quantify the wind resource capacity and energy potential in the GOM region for each GOM state including state and federal waters, distance from shore, and water depth; perform geospatial regional economic assessments of levelized cost of energy (LCOE), levelized avoided cost of energy (LACE), and net value (Section 3.4.2); evaluate three representative hypothetical locations for site-specific analysis; perform a high-level assessment of local supporting infrastructure availability, including existing services (e.g., fabrication facilities, vessels, ports) and possible grid connection options; assess the regional economic impacts of a 600 megawatt (MW) offshore wind power plant installed at a representative site in the GOM.

17 WIND ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗