Search NASA⌕ Search

SEARCH · Search NASA

Results for “offshore wind vessels”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Offshore Wind Guide

The WINDExchange Offshore Wind Energy Guide is a foundational resource that introduces the major concepts and topics within offshore wind energy: project anatomy and component characteristics; the project development process; siting of turbines and other infrastructure; state and local involvement in offshore wind energy development; community impacts; public engagement in decision making and planning; Tribal considerations; economic impacts; supply chain, ports, and vessels, and workforce. This guide is intended to provide information and resources that can build a foundation of knowledge and understanding about offshore wind energy and create a launching point for readers to seek out additional information about the topics and issues of interest to them.

17 WIND ENERGY↗

Feasibility Assessment and Preliminary Design of a Low Cost, Modular Concrete, Suction Pile Support Structure and Heavy Lift Vessel Alternative (CRADA Final Report)

The project goal is to prove the feasibility and advance the development of a low-cost, modular concrete suction pile support structure and heavy lift vessel alternative for offshore wind deployment in the United States. These technology developments are critical to alleviating specific challenges faced by the United States market, including a limited number of Jones Act-compliant installation vessels and environmental restrictions associated with using conventional offshore wind foundations. The first phase of this project is a conceptual design and feasibility assessment of modular concrete substructure options for NREL’s 15 MW reference turbine.

17 WIND ENERGY↗

Wind Energy Supply Chain Deep Dive Assessment

The Wind Energy Supply Chain Deep Dive Assessment finds that the U.S. wind supply chain is nascent for offshore wind and mature for land-based wind, but U.S. competitiveness is declining in key wind turbine components. Continued decarbonization of the U.S. grid and economy with domestically supplied wind technology will require innovation to increase U.S. manufacturing competitiveness; investment in logistics and infrastructure, such as offshore wind ports and vessels; and policies to provide a strong and stable demand signal to support accelerated investment in the wind supply chain.

17 WIND ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

Coupled Aerodynamic and Hydrodynamic Hybrid Simulation of Floating Offshore Wind Turbines

The development and innovation of floating offshore wind energy in the U.S. requires detailed high-fidelity observations and measurements of turbine and platform loading due to wind, waves, and currents. However, full-scale and quasi-full-scale experiments require significant financial and temporal investments for construction, experimental testing, and long-term field campaigns. To support the commercial advancement of the offshore wind energy industry, specialized wind tunnel and wave basin experimental facilities are critical to be able to test FOWT designs at small scale under controlled conditions prior to full-scale deployment. Oregon State University (OSU) is internationally known as a leader in water and energy research, development, and testing. The O.H. Hinsdale Wave Research Laboratory (HWRL) and the Wallace Energy Systems and Renewables Facility (WESRF) at OSU have extensive experience building, modeling, monitoring, controlling, and actuating scaled systems. Experiments on wave-structure interaction have been performed at the HWRL since its establishment in 1972. Studies have included the interaction of waves with coastal structures (breakwaters, seawalls, buildings, cylinders, bridges, fixed foundations of offshore wind turbines, etc.) and with floating structures (e.g., wave energy converters, maneuvering of vessels, etc.). Hinsdale is actively used by marine energy technology developers, both for private testing and OSU-collaborative research projects. However, despite the availability of several large-scale facilities for hydrodynamic testing (at OSU and elsewhere in the U.S.), existing experimental laboratories are generally limited in their ability to accurately generate combined wind and wave conditions. The simulation of both wind and waves in experimental testing is complicated due to a number of constraints, including: [i] incompatible similitude laws governing the wind and waves for scaled experiments, [ii] producing accurate wind over a large enough control volume via fans, and [iii] generating wind that reasonably represents the atmospheric boundary layer in existing wave basins/flumes. Hence, physical test data providing insight into the simultaneous wave- and wind-structure response of floating offshore wind components can be difficult to generate. Given the aforementioned challenges in classic hydrodynamic experiments, the motivation of this project is to establish a real-time hybrid simulation (RTHS) approach that can apply aero- and hydro-dynamic loading by augmenting wave-only experimental facilities with virtual aerodynamic forces through numerical models representing the remaining dynamic forces. RTHS is a physical-numerical approach that partitions a prototype system into physical and numerical sub-assemblies that interact with each other through actuators and sensors in real time. In coupling physical and numerical models, the hybrid simulation approach applied herein is ideal for problems with: (1) structures subjected to different scaling laws, such as floating offshore wind turbines subjected to combined aero/hydro-dynamic loading, (2) structures that are too large or complex to be tested entirely in a laboratory setting, such as deep-water mooring applications, and (3) component testing, where the behavior of a portion of the assembly is uncertain but still interacts with other portions of the structure, such as testing the fatigue life of turbine blades. Few U.S. experimental facilities are able to test simultaneous aero- and hydro-dynamic loading and none can accurately produce aero/hydro-dynamic response on scaled FOWT models due to conflicting similitude laws between the wind (commonly Reynolds) and the waves (commonly Froude). To aid in accelerating the development of the U.S. floating offshore industry, there is a significant need to develop a flexible, modular framework that can expand the capacities of existing wave-only laboratories. The project goal is to demonstrate a hydrodynamic real-time hybrid simulation (hydro-RTHS) framework that couples numerical wind and physical waves acting on a FOWT, thus representing simultaneous aero/hydro-dynamic loading. The FOWT is partitioned into a full-scale numerical sub-assembly associated with the aerodynamics and a model-scale physical sub-assembly associated with the hydrodynamics. The numerical-physical partition associated with hydro-RTHS mitigates scaling constraints by supplying different scaling laws to the physical and numerical sub-assemblies. Herein, length, force, and time are scaled and exchanged between the sub-assemblies using Froude scaling to represent the open-channel flow in the physical sub-assembly. Other similitude laws could also be utilized depending on the problem definition. It is envisioned that the ability to model FOWTs under waves and wind, with mitigation of similitude distortions, would result in reduced development costs (currently, FOWT concept development is performed with full-size pro- totypes at enormous expense and risk) and increase the reliability of the FOWT industry (since extreme wave and wind conditions and contingency events can be tested safely in a controlled environment).

16 TIDAL AND WAVE POWER↗

Offshore Wind in the US Gulf of Mexico: Regional Economic Modeling and Site-Specific Analyses

The goal of this study is to assess offshore wind energy resources in the Gulf of Mexico (GOM) and to quantify its technical and economic potential in order to inform Federal and GOM state strategic energy planning over the next decade. The objectives are to: describe site-specific and regional benefits and challenges of deploying offshore wind in the GOM and discuss the current research to mitigate challenges; review and quantify the wind resource capacity and energy potential in the GOM region for each GOM state including state and federal waters, distance from shore, and water depth; perform geospatial regional economic assessments of levelized cost of energy (LCOE), levelized avoided cost of energy (LACE), and net value (Section 3.4.2); evaluate three representative hypothetical locations for site-specific analysis; perform a high-level assessment of local supporting infrastructure availability, including existing services (e.g., fabrication facilities, vessels, ports) and possible grid connection options; assess the regional economic impacts of a 600 megawatt (MW) offshore wind power plant installed at a representative site in the GOM.

17 WIND ENERGY↗

AIS-based characterization of navigation conflicts along the US Atlantic Coast prior to development of wind energy

This study characterizes navigation conflicts in a region with a large traffic volume along the US Atlantic Coast, utilizing Automated Identification System (AIS) data for 2010. The region includes areas proposed for wind energy development. The characterization could be useful in evaluating the effect of offshore wind areas on navigation conflicts. The study processes the AIS data to provide pairwise comparisons of vessel interactions (encounters and near-misses) as they occurred. Using the vessel encounter data, analyses are made using a ‘blind’ vessel assumption to evaluate the potential for both near-misses and collisions. Then statistical analyses are made to estimate the point values and uncertainty for each type of encounter (crossing, head-on, overtaking). Examination of the frequency/number of collisions from actual observations is made. The examination of actual near-misses, potential near-misses, and potential collisions provides comparable results in the number of near-misses and collisions. The potential near-miss analyses include an examination of the timing of responses made by vessels to prevent near-misses. This informed the statistical analysis but may also have utility in the simulation of navigation conflicts.

99 GENERAL AND MISCELLANEOUS↗

Impacts of turbine and plant upsizing on the levelized cost of energy for offshore wind

Turbine and plant upsizing are major trends in offshore wind deployment, although the quantitative impact on project costs has not been well-characterized. The uncertain value of continued wind turbine and project growth limits the ability of the supply chain to prepare for future technology trends, leading to challenges in the realization of larger projects. This analysis explores the levelized cost of energy impacts of turbine ratings between 6 and 20 MW and plant capacities between 250 and 2,500 MW for fixed-bottom offshore wind using techno-economic cost models for foundation, electrical, installation, and operation and maintenance costs, along with annual energy production. We consider a nominal set of technology assumptions for all scenarios to isolate economies of size and scale without additional benefits from decreasing turbine capital costs, quantity discounts for larger projects, or optimized technology solutions. These results indicate that using a 20-MW wind turbine in a 2,500-MW power plant array can reduce the levelized cost of energy by over 23% relative to the global average turbine and plant size installed in 2019; primarily because of reductions in the balance-of-system and operation and maintenance costs. We also identify improved installation vessels, optimized export systems, and novel operation and maintenance strategies as additional cost reduction opportunities. These results suggest that upsizing represents a significant cost reduction opportunity for offshore wind energy and will continue to be a main factor in shaping the future of the sector.

17 WIND ENERGY↗

Gearing Up for 2030: Building the Offshore Wind Supply Chain and Workforce Needed to Deploy 30 GW and Beyond

This webinar addresses the current state and future needs of the U.S. offshore wind energy workforce and supply chain. During this webinar, National Renewable Energy Laboratory researchers Matt Shields and Jeremy Stefek will present new research on the challenges of producing thousands of offshore wind energy technology components while creating tens of thousands of U.S. jobs - and the solutions that can help meet those challenges. Topics covered in the webinar include port facilities, vessels, component manufacturing, trades and roles in the industry, workforce development and training, and the coordination of supply chain and workforce efforts between states and regions.

2030↗

Process-Based Balance-of-System Cost Modeling for Offshore Wind Power Plants in the United States: Preprint

This work describes the development of a process based and open source balance of system cost model which provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute the times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays due to weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation; installation times are shown to agree with real data with relative errors of less than 35\%. Case studies are presented to demonstrate the functionality of the model. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. This quantifies the cost benefit tradeoffs of decreasing number of turbines, increased turbine spacing, and fewer turbine terminations and shows a net cost savings. These results demonstrate that the BOS model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Process-based balance of system cost modeling for offshore wind power plants in the United States

This paper describes the development of a process-based and open-source balance of system cost model that provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays caused by weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation. Installation times show reasonable agreement with real data. Project cost sensitivities are investigated to compute the system-level impact of different design choices. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. These values quantify the cost-benefit tradeoffs and show a net-cost savings of decreasing numbers of turbines, increased turbine spacing, and fewer turbine terminations. These results demonstrate that the balance of system model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Observations of Offshore Internal Boundary Layers

The growth of the marine internal boundary layer (MIBL, height h i ) with the shore-normal distance x, is a topic of continuing interest because of its applications in coastal dispersion, offshore wind farm siting, coastal air-sea fluxes and in evaporative ducting. Available data on MIBL are only scarce, given its difficult to measure the variability of coastal winds. During Coupled Air-Sea Processes and Electromagnetic Research (CASPER) campaigns an array of instrumentation was deployed to measure offshore spatial variability and its effect on electromagnetic wave propagation. Meteorological sensors (flux towers and remote sensing) were deployed along the coast of Point Mugu, California, on a research vessel and FLoating Instrument Platform (FLIP) provided surface layer and boundary layer observations. In this article, measurements from multiple remote sensing instruments, such as synchronized triple Doppler lidars, small boat operations with tethered lifting system, and radiosondes provide a holistic view of the MIBL growth and its spatial variability from the coast. A convective and stable MIBL observed during two intensive operating period days showed distinct growth characteristics off the coast of Point-Mugu. During stable stratified atmospheric conditions, an MIBL was observed at least up to 47 km from the coast. The growth of the MIBL within the nearshore adjustment zone was influenced by surrounding atmospheric, oceanographic, and topographic conditions. A new parameterization scheme is developed based on advection-diffusion balance equations accounting for upstream turbulence and compared with h i observations from Doppler lidar and profiles from small boat. An evaluation of existing IBL theories was also conducted.

54 ENVIRONMENTAL SCIENCES↗

Distributed Acoustic Sensing for Whale Vocalization Monitoring: A Vertical Deployment Field Test

Abstract There is growing interest in floating offshore wind turbine (FOWT) technology, where turbines are installed on floating structures anchored to the seabed, allowing wind energy development in areas unsuitable for traditional fixed-platform turbines. Responsible development requires monitoring the impact of FOWTs on marine wildlife, such as whales, throughout the operational lifecycle of the turbines. Distributed acoustic sensing (DAS)—a technology that transforms fiber-optic cables into vibration sensor arrays—has been demonstrated for acoustic monitoring of whales using seafloor telecommunications cables. However, no studies have yet evaluated DAS performance in dynamic, engineered environments, such as floating platforms or moving vessels with complex, dynamic strain loads, despite their relevance to FOWT settings. This study addresses that gap by deploying DAS aboard a boat in Monterey Bay, California, where a fiber-optic cable was lowered using a weighted and suspended mooring line, enabling vertical deployment. Humpback whale vocalizations were captured and identified in the DAS data, noise sources were identified, and DAS data were compared to audio captured by a standalone hydrophone attached to the mooring line and a nearby hydrophone on a cabled observatory. This study is unique in: (1) deploying DAS in a vertical deployment mode, where noise from turbulence, cable vibrations, and other sources posed additional challenges compared to seafloor DAS applications; (2) demonstrating DAS in a dynamic, nonstationary setup, which is uncommon for DAS interrogators typically used in more stable environments; and (3) leveraging looped sections of the cable to reduce the noise floor and mitigate the effects of excessive cable vibrations and strain. This research demonstrates DAS’s ability to capture whale vocalizations in challenging environments, highlighting its potential to enhance underwater acoustic monitoring, particularly in the context of renewable energy development in offshore environments.

Saw, Jaewon↗