Search NASA⌕ Search

SEARCH · Search NASA

Results for “on-site generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Progressing Analysis of Variable Electric Rates (PAVER) Study

The Progressing Analysis of Variable Electric Rates (PAVER) study analyzed the impact of a range of time-varying electric rates on the performance of a regional electric grid and the resulting costs for participating and non-participating customers. This analysis leveraged and extended the work of PNNL’s Distribution System Operator with Transactive (DSO+T) study. Five different rate designs were included: a flat volumetric energy charge, a typical Time of Use (TOU) rate, a dynamic energy (DE) rate (based on wholesale locational marginal prices), a dynamic energy and capacity (DE+C) rate, and, finally, a Block and Swing (B&S) rate that billed customers based on their average load profile at constant pricing, but used the DE+C dynamic price for load deviations from their average profile. These rates were analyzed in a large-scale co-simulation of an entire regional grid with a customer population representative of the current state. A large fraction (80%) of residential and commercial customers were assumed to participate in these time-varying rates with automatically controlled HVAC, water heaters, electric vehicles, and batteries. This study assumed no industrial sector participation. The DE and DE+C rates saw system peak loads reduced by 6-7%, while the large participation in the TOU rate case saw a significant rebound effect and a resulting peak load increase of >5%. The impacts to the annual and peak system demand impacted system wholesale prices and the overall grid operating costs. This cost structure determined the revenue needed to be collected from customers by each rate design. Participating customers on the DE and DE+C rates (located in one of the modeled DSOs) saw reductions in average annual electricity bills of 11-17% with average increases in monthly bill variation of no more than 13%. At such high participation levels, TOU customers saw 10% higher average annual bills (due to system-wide rebound effects) and average increased monthly bill variation of 16%. Residential owners of large flexible loads (such as electric vehicles) saw larger bill savings (17-20%) when on a fully dynamic rate. The presence of on-site generation (such as rooftop solar) did not appear to appreciably change customer outcomes. Customers on the Block and Swing rate did see 6% lower monthly bill variation (as intended) than the flat rate case, but at the expense of appreciable bill savings, which were only 3%, comparable to the savings seen by non-participants. Given this finding we recommend that additional research be conducted into how best various bill protection mechanisms can balance minimizing customer bill variation with providing financial incentives commensurate with the flexibility customers provide. We also recommend that customer outcomes be explored across a range of regions using current actual customer and system cost data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Prime Time for Model-Predictive Control? Assessing the Technical and Market Readiness of Advanced Controls in Buildings

Despite three decades of extensive research and field testing that have consistently validated the benefits of Model Predictive Control (MPC) in building applications, the technology has seen limited market adoption. This paper evaluates the readiness of MPC for widespread deployment, showcases recent demonstrations and field tests across diverse building types, including residential, small commercial, large commercial, and campus settings. Our results demonstrate that MPC can optimize system operations to achieve load shifting, minimize curtailment of on-site generation, and reduce energy costs by up to 80 %, while maintaining or improving occupant comfort. We also show that MPC can effectively control large assets, such as MW-sized thermal storage systems, and respond to dynamic pricing signals. However, achieving scale remains difficult due to labor-intensive workflows, reliance on a “PhD-in-the-loop” for MPC design and maintenance, susceptibility to fragile data infrastructure, and persistent workforce education and acceptance barriers. To bridge this gap, we outline a transition from bespoke, labor intensive prototypes toward streamlined, segment-targeted deployment strategies that leverage model templates, semantic tools, and generative AI. By automating control configuration and reducing engineering effort, these recommendations provide a pathway for transforming successful research demonstrations into scalable, market ready solutions for MPC-based controls.

Pritoni, Marco↗

Energy Technology Innovation Partnership Project [Slides]

This presentation introduces the Energy Technology Innovation Partnership Project (ETIPP) and outlines proposed technical assistance to support St. Vincent's House in developing a resilient community hub in Galveston, Texas. The project explores opportunities for on-site energy solutions to ensure continuity of critical services during coastal hazards and grid disruptions. The session aims to gather stakeholder input to refine priorities and inform next steps for resilient, reliable, and cost-effective energy strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimated Hourly Electricity Demand Profiles for Each County in the Contiguous United States

In this data descriptor, we present hourly electricity demand estimates for each county in the contiguous United States from 2016 to 2023. The demand profiles represent the sum of two components for each county. The first is the weighted average of reported hourly demand profiles for North American Electric Reliability Corporation balancing authority (BA) regions and subregions, scaled to match annual estimates of county-level retail sales and direct use of electricity and weighted by the estimated percentage of county load served by each BA region or subregion. The second is the weighted average of modeled hourly, county- and sector-level distributed photovoltaic (DPV) capacity factor profiles, scaled to match annual estimates of on-site consumption of DPV-generated electricity for each county and weighted by the percentage of consumption attributable to each sector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline vs. DER Scenario

Projections and associated uncertainty estimates are generated for a variety of user-selectable EV charging sessions, electricity tariffs, subsidy levels, revenue schemes, charging station configurations, and on-site solar and/or storage options. The outputs are presented in CHIP's web portal browser in the form of easily interpretable graphics (interactive graphs and bar charts) that facilitate convenient comparison among different scenarios to aid decision-making. The user should bring assumptions for modeling on simulation planning horizon, number of EV charging sessions per year, electricity costs (energy and demand charge rates; flat versus time-of-use rate), site capital costs (equipment for EV chargers and transformer), solar PV, and battery energy storage (kW).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Solar Project Models: An Introduction to Basic Financial and Administrative Relationships [Slides]

This resource is a collection of visual aids and descriptions to help explain the basic financial and administrative relationships underpinning common community solar project models. The graphics in this resource depict the flow of electricity from generation to consumption and the financial exchanges between the community solar project owner, subscribers, and distribution utility. Community solar models vary based on ownership (e.g., third party, utility), customer type (e.g., multifamily, single-household), and solar array location (e.g., on-site, off-site).

14 SOLAR ENERGY↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗