Search NASA⌕ Search

SEARCH · Search NASA

Results for “operation phases”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Phase operators and phase relations for photon states

For a quantized mode of the radiation field, the operator whose classical analog is the ordinary phase factor of the mode amplitudes has been shown to be nonunitary. A rigorous formulation of the phase P is given on the basis of the canonical factorization theorem. Many of the seemingly complex features of phase operators are found to be simple direct consequences of the general mathematical theory. It can be readily seen that P is a partial isometry but not a unitary operator. In contrast to the amplitude operator, it is found that P is not a spectral operator and that the set of phase eigenstates is not complete. Mathematically precise operator relations are developed, and a complete spectral analysis is given for each of the phase operators.-

Volkin, H. C.↗

System safety in the operational phase

The operational phase of system safety is investigated. Data cover manufacturing, test operations, materials handling, flight tests, and operational mission analysis.

John Gera, Jr↗

A New Definition to the Phase Operator and its Properties

By introducing a series of mathematical symbols and the phase quantization condition, we give a new definition of the phase operator, which not only is made directly in infinite state spaces, but also circumvents all difficulties appearing in the traditional approach Properties of the phase operator and its expressions in some widely-used representations are also given.

Duan, Lu-Ming↗

Ripple-induced neoclassical toroidal viscous torque in Augmented-First Plasma operation phase in ITER

Abstract A systematic calculation is performed on the ripple-induced neoclassical toroidal viscous (NTV) torque for new ITER scenarios designed for the Augmented-First Plasma (A-FP) operation phase with the full tungsten wall, where the plasma-wall gap is varied in view of mitigating the impact of tungsten wall-plasma interactions. The torque calculation includes drift kinetic response of the plasma thermal and energetic particles to the n = 18 ( n is the toroidal harmonic number) ripple field. For the plasma scenario with ~45 cm plasma-wall gap at the outboard mid-plane and considering the corrected ripple level of 0.17% by the ferritic steel inserts, the computed net NTV torque acting on the plasma column is in the sub-Nm level. However, with decreasing the plasma-wall gap, the computed net NTV torque can reach a level comparable to that produced by the neutral-beam momentum injection in ITER. Ripple correction by ferritic inserts reduces the net torque by a factor of 3.3 for all the three A-FP scenarios considered. The n ω d = l ω b (with ω d and ω b being the toroidal precession and bounce frequencies of trapped particles, respectively, and l an integer number) type of resonance-enhancement of the NTV torque, due to thermal particles, is found to be weak in ITER despite high- n of 18. The same also holds for the ITER 10 MA steady state scenario from the D-T operation phase, where the aforementioned resonance associated with fusion-born alphas is also included. The ripple-induced NTV torque is well below that produced by the resonant magnetic perturbation applied for controlling the type-I edge-localized mode in ITER.

ITER↗

Phasing operator for two oscillators in classical field

The origin of Dicke cooperative states was studied by considering two harmonic oscillators driven by a common field of radiation. The origin is assumed for superradiance in a system of molecules where no mutual interactions exist, but all of the molecules encounter the same field of radiation. A phasing operator as Phi(sub Nu) equals D(alpha) + P(sub Nu)D(alpha), where D(alpha) is the displacing operator and P(sub Nu) the projection operator for constant energy Nu for two oscillators, was derived. The eigenstates of the phasing operator Phi are found to show a finite correlation as in the Dicke cooperative states.

Kim, Jong-Jean↗

Design and development of the magnetic diagnostic systems for the first operational phase of the SMART tokamak

A set of magnetic diagnostics has been designed, manufactured, and calibrated for the first operational phase of the small aspect ratio tokamak. The sensor suite comprises of Rogowski coils; 2D magnetic probes; and poloidal, saddle, and diamagnetic flux loops. Here, a set of continuous Rogowski coils has been manufactured for the measurement of plasma current and induced eddy currents in conductive elements. A set of flux loops and magnetic probes will be used as input for the reconstruction of the magnetohydrodynamic equilibrium. The quantity and position of these sensors have been verified to be sufficient with synthetic equilibrium reconstructions using the equilibrium fitting code and baseline scenarios computed with the Fiesta code. These sensors will also be used as input for the real-time control system, and magnetic probes will be used for the detection of plasma instabilities. The calibration procedure for the magnetic probes is described, and the results are shown. The signal conditioning and data acquisition systems are described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

HISPASAT launch and early operations phases: Computation and monitoring of geostationary satellite positioning

Since 1974, CNES, the French National Space Agency, has been involved in the geostationary launch and early operations phases (LEOP) of moving satellites from a transfer orbit delivered by a launcher to a geostationary point. During the operations and their preparation, the Flight Dynamics Center (FDC), part of CNES LEOP facilities, is in charge of the space mechanics aspects. What is noteworthy about the Spanish HISPASAT satellite positioning is that all the operations were performed on the customer's premises, and consequently the FDC was duplicated in Madrid, Spain. The first part of this paper is the FDC presentation: its role, its hardware configuration, and its space dynamics ground control system called MERCATOR. The second part of this paper details the preparation used by the FDC for the HISPASAT mission: hardware and software installation in Madrid, integration with the other entities, and technical and operational qualifications. The third part gives results concerning flight dynamics aspects and operational activities.

Brousse, Pascal↗

Observables, measurements and phase operators from a Bohmian perspective

Bohmian mechanics is a deterministic theory of point particles in motion. While avoiding all the paradoxes of nonrelativistic quantum mechanics, it yields the quantum formalism itself--especially the role of self-adjoint operators--as a macroscopic measurement formalism. As an 'application' it is shown that much of the confusion connected with the phase operator for the electromagnetic field arises from a misunderstanding of the role of operators in quantum theory.

Daumer, Martin↗

Effectiveness evaluation of STOL transport operations (phase 2)

A computer simulation program which models a commercial short-haul aircraft operating in the civil air system was developed. The purpose of the program is to evaluate the effect of a given aircraft avionics capability on the ability of the aircraft to perform on-time carrier operations. The program outputs consist primarily of those quantities which can be used to determine direct operating costs. These include: (1) schedule reliability or delays, (2) repairs/replacements, (3) fuel consumption, and (4) cancellations. More comprehensive models of the terminal area environment were added and a simulation of an existing airline operation was conducted to obtain a form of model verification. The capability of the program to provide comparative results (sensitivity analysis) was then demonstrated by modifying the aircraft avionics capability for additional computer simulations.

Welp, D. W.↗

Short term hearing loss in general aviation operations, phase 1, part 1

The effects of light aircraft noise on six subjects during flight operations were investigated. The noise environment in the Piper Apache light aircraft was found to be capable of producing hearing threshold shifts. The following are the principal findings and conclusions: (1) Through most of the frequency range for which measurements were taken (500 to 6000 Hz), there was a regular progression showing increased loss of auditory acuity as a function of increased exposure time. (2) Extensive variability was found in the results among subjects, and in the measured loss at discrete frequencies for each subject. (3) The principal loss of hearing occurred at the low frequencies, around 500 Hz.

Parker, J. F., Jr.↗

The CERES S'COOL Project: Development and Operational Phases

As part of NASA's Mission to Planet Earth, the first Clouds and the Earth's Radiant Energy System (CERES) instrument will be launched on the Tropical Rainfall Measuring Mission (TRMM) spacecraft from the Tanegashima launch site in Japan in November 1997. The instrument will measure the radiation budget incoming and outgoing radiant energy - of the Earth. The major feature of interest is clouds, which play a very strong role in regulating our climate. CERES will identify clear and cloudy regions and determine cloud physical and microphysical properties using imager data from a companion instrument. Validation efforts for the remote sensing algorithms will be intensive. As one component of the validation, the S'COOL (Students' Cloud Observations On-Line) project will involve school children around the globe in making ground truth measurements at the time of a CERES overpass. They will report cloud type, height, fraction, and opacity, as well as the local surface conditions. Their observations will be collected at the NASA Langley Distributed Active Archive Center (DAAC) and made available over the Internet for educational purposes as well as for use by the CERES Science Team in validation efforts. Pilot testing of the S'COOL project began in January 1997 with two local schools in Southeastern Virginia and one remote site in Montana. National testing in April 1997 involved 8 schools (grades 3 to high school) across the United States. Global testing will be carried out in October 1997. Details of the S'COOL project, which is mainly Internet-based, are being developed in each of these phases according to feedback received from participants. In 1998, when the CERES instrument is operational, a global observer network should be in place providing useful information to the scientists and learning opportunities to the students. Broad participation in the S'COOL project is planned, both to obtain data from a wide range of geographic areas, and to involve as many students as possible in learning about clouds and atmospheric science. This paper reports on the development phase of the S'COOL project, including the reaction of the teachers and students who have been involved. It describes the operational state of the S'COOL network, and identifies opportunities for additional participants.

Chambers, Lin H.↗

Design of inducers for two-phase operation

A mathematical model and a digital computer program were developed for the design and evaluation of inducers for pumping two-phase oxygen. The mathematical model indicated that any design would have to be run at relatively low speeds to pump two-phase oxygen and that the J-2S oxygen inducer was close to optimum and should perform the task. A J-2S pump was built up and tested in two-phase oxygen at speeds indicated by the mathematical model. The pump was able to handle two-phase oxygen over a wide range of inducer incidence angles and up to a vapor content of 37 percent by volume with very little loss in head. The pump was still able to produce some head at vapor fractions approaching 60 percent.

King, J. A.↗

Mars Reconnaissance Orbiter Ka-band (32 GHz) Demonstration: Cruise Phase Operations

The X-band (8.41 GHz) frequency currently used for deep space telecommunications is too narrow (50 MHz) to support future high rate missions. Because of this NASA has decided to transition to Ka-band (32 GHz) frequencies. As weather effects cause much larger fluctuations on Ka-band than on X-band, the traditional method of using a few dBs of margin to cover these fluctuations is wasteful of power for Ka-band; therefore, a different operations concept is needed for Ka-band links. As part of the development of the operations concept for Ka-band, NASA has implemented a fully functioning Ka-band communications suite on its Mars Reconnaissance Orbiter (MRO). This suite will be used during the primary science phase to develop and refine the Ka-band operations concept for deep space missions. In order to test the functional readiness of the spacecraft and the Deep Space Network's (DSN) readiness to support the demonstration activities a series of passes over DSN 34-m Beam Waveguide (BWG) antennas were scheduled during the cruise phase of the mission. MRO was launched on August 12, 2005 from Kennedy Space Center, Cape Canaveral, Florida, USA and went into Mars Orbit on March 10, 2006. A total of ten telemetry demonstration and one high gain antenna (HGA) calibration passes were allocated to the Ka-band demonstration. Furthermore, a number of "shadow" passes were also scheduled where, during a regular MRO track over a Ka-band capable antenna, Ka-band was identically configured as the X-band and tracked by the station. In addition, nine Ka-band delta differential one way ranging ((delta)DOR) passes were scheduled. During these passes, the spacecraft and the ground system were put through their respective paces. Among the highlights of these was setting a single day record for data return from a deep space spacecraft (133 Gbits) achieved during one 10-hour pass; achieving the highest data rate ever from a planetary mission (6 Mbps) and successfully demonstrating Ka-band DDOR. In addition, DSN performed well. However, there are concerns with the active pointing of the Ka-band antennas as well as delivery of the monitor data from the stations. The spacecraft also presented challenges not normally associated with planetary missions mostly because of its very high equivalent isotropic radiated power (EIRP). This caused problems in accurately evaluating the in-flight EIRP of the spacecraft which led to difficulties evaluating the quality of the HGA calibration data. These led to the development of additional measurement techniques that could be used for future high-power deep space missions.

Mars Reconnaissance Orbiter (MRO)↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗