Search NASA⌕ Search

SEARCH · Search NASA

Results for “operation window”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Highly Selective Acetylene Semihydrogenation Catalyst with an Operation Window Exceeding 150 °C

The operating window (OW) is a primary performance criterion for the selective hydrogenation of acetylene in excess ethylene. Currently, most state-of-the-art catalyst systems have an OW of less than 50 °C in front-end processes. Selective acetylene hydrogenation catalysts with an OW wider than 100 °C are rare. Here, we demonstrate a facile stepwise chemical method to synthesize calcite-supported PdBi intermetallic compounds (PdBi/Calcite) that feature isolated and electron-rich Pd atoms as active sites for acetylene hydrogenation. Beneficial from the extremely weak ethylene absorption abilities and the stable structures against the formation of β-PdH x , PdBi/Calcite exhibit >99% selectivity to C 2 H 4 in the whole temperature range tested (50–300 °C) and ~100% C 2 H 2 conversion from 150 to 300 °C. Finally, as a result, an operation window exceeding 150 °C has been achieved.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Predicting operational windows of ELMs suppression by resonant magnetic perturbations in the DIII-D and KSTAR tokamaks

A newly developed plasma response model, combining the nonlinear two-fluid MHD code TM1 and toroidal MHD code GPEC run in ideal mode, quantitatively predicts the narrow isolated q 95 windows (Δq 95 ~ 0.1) of ELM suppression by n = 1, 2 and 3 resonant magnetic perturbations (RMPs) in both DIII-D and KSTAR tokamaks across a wide range of plasma parameters. The key physics that unites both experimental observations and our simulations is the close alignment of essential resonant q-surfaces and the location of the top of the pedestal prior to an ELM. This alignment permits an applied RMP to produce field penetration due to the lower E × B rotation at the pedestal top rather than being screened. The model successfully predicts that narrow magnetic islands form when resonant field penetration occurs at the top of pedestal, and these islands are easily screened when q 95 moves off resonance, leading to very narrow windows of ELM suppression (typically Δq 95 ~ 0.1). Furthermore, the observed reduction in the pedestal height is also well captured by the calculated classical collisional transport across the island. We recover observed q 95 , β N and plasma shape dependence of ELM suppression due to the effect of magnetic islands on pedestal transport and Peeling-Ballooning- Mode (PBM) stability. Importantly, experiments do occasionally observe wide windows of ELM suppression (Δq 95 > 0.5). Our model reveals that at low pedestal-top density multiple islands open, leading to wide operational windows of ELM suppression consistent with experiment. The model indicates that wide q95 windows of ELM suppression can be achieved at substantially higher pedestal pressure with less confinement degradation in DIII-D by operating at higher toroidal mode number (n = 4) RMPs. As a result, this can have significant implications for the operation of the ITER ELM control coils for maintaining high confinement together with ELM suppression.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Space station proximity operations windows: Human factors design guidelines

Proximity operations refers to all activities outside the Space Station which take place within a 1-km radius. Since there will be a large number of different operations involving manned and unmanned vehicles, single- and multiperson crews, automated and manually controlled flight, a wide variety of cargo, and construction/repair activities, accurate and continuous human monitoring of these operations from a specially designed control station on Space Station will be required. Total situational awareness will be required. This paper presents numerous human factors design guidelines and related background information for control windows which will support proximity operations. Separate sections deal with natural and artificial illumination geometry; all basic rendezvous vector approaches; window field-of-view requirements; window size; shape and placement criteria; window optical characteristics as they relate to human perception; maintenance and protection issues; and a comprehensive review of windows installed on U.S. and U.S.S.R. manned vehicles.

Haines, Richard F.↗

The Impact of Operated Window Shading on Visual Comfort, Non-Visual Health, and Energy Demand from Electric Lighting

This paper introduces a simulation-based workflow to assess annual circadian lighting performance, glare risk and energy demand for an array of seated view positions under operated shading and electric lighting conditions. This workflow uses a combination of 9-band and 81-band simulations to represent daylight and electric lighting respectively. Annual daylight-driven calculations rely on a python-based code provided in the LARK simulation engine which was used to run 180-degree high dynamic range (HDR) renderings with 9-bands of spectral resolution. The results reveal the impact of shading systems on equivalent melanopic lux (EML) and daylight glare probability (DGP) over time and the energy demand (kWh) from electric lighting systems to supplement eye-level recommendations from the WELL v2 Building Standard.

Rockcastle, Siobhan↗

Wide Operational Windows of Edge-Localized Mode Suppression by Resonant Magnetic Perturbations in the DIII-D Tokamak

Edge-Localized-Mode (ELM) suppression by resonant magnetic perturbations (RMPs) generally occurs over very narrow ranges of the plasma current (or magnetic safety factor $q_{95}$) in the DIII-D tokamak. However, wide $q_{95}$ ranges of ELM suppression are needed for the safety and operational flexibility of ITER and future reactors. In DIII-D ITER Similar Shape (ISS) plasmas with $n$=3 RMPs, the range of $q_{95}$ for ELM suppression is found to increase with decreasing electron density. Nonlinear two-fluid MHD simulations reproduce the observed $q_{95}$ windows of ELM suppression and the dependence on plasma density, based on the conditions for resonant field penetration at the top of the pedestal. When the RMP amplitude is close to the threshold for resonant field penetration, only narrow isolated magnetic islands form near the top of the pedestal, leading to narrow $q_{95}$ windows of ELM suppression. However, as the threshold for field penetration decreases with decreasing density, resonant field penetration can take place over a wider range of $q_{95}$. For sufficiently low density (penetration threshold) multiple magnetic islands form near the top of the pedestal giving rise to continuous $q_{95}$ windows of ELM suppression. The model predicts that wide $q_{95}$ windows of ELM suppression can be achieved at substantially higher pedestal pressure in DIII-D by shifting to higher toroidal mode number ($n$=4) RMPs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Screening of alkali-assisted storage conditions to define the operational window of deacetylation within storage systems in the bioenergy supply chain

Overcoming biomass heterogeneity and associated recalcitrance to thermal, chemical, and enzymatic depolymerization is a necessary but challenging aspect of valorizing lignocellulosic biomass to fuels and chemicals. Here, this study explores how this recalcitrance can be reduced during the supply chain unit operation of storage, which is required for seasonally harvested agricultural residues to maintain constant throughput at a biorefinery. In this work, partial alkali pretreatment was performed just prior to corn stover entering storage, which had the benefit of providing a high pH environment entering storage such that soluble sugars were preserved and saponified acetyl groups in hemicellulose. This work investigated a range of viable conditions where saponification and preservation occur simultaneously by varying the moisture content (40% and 60%) and concentrations of sodium hydroxide (low and high) during aerobic and anaerobic storage. Anaerobic conditions preserved overall dry matter below 5% in the three scenarios evaluated, and the highest alkali loading solubilized up to 15% lignin, 18% xylan, and 50% of acetate, meanwhile doubling the extractable components. Scanning electron microscopy images highlighted potential physical impacts including cell-wall disruption near vascular bundles, pitting within parenchyma cells, and cell-wall distortion. Techno-economic assessment indicated that this storage approach and associated logistics system is economically competitive with a conventional approach using low-moisture bales.

09 BIOMASS FUELS↗

Slot-die-coating operability windows for polymer electrolyte membrane fuel cell cathode catalyst layers

Roll-to-roll (R2R) slot-die coating of polymer electrolyte membrane fuel cell (PEMFC) catalyst layers represents a scalable deposition method for producing 10–20 m 2 ·min -1 of catalyst-coated gas diffusion layers (GDLs). This high-throughput production technique will help lower the cost of PEMFC catalyst layers. The uniformity of the wet layer applied by slot die deposition is affected by process parameters such as substrate speed, vacuum pressure applied at the upstream meniscus, gap between the slot die lips and substrate, ink rheology, and other ink and substrate properties. The set of conditions for producing a defect-free coating with a dilute ink typically requires little to no upstream vacuum pressure, so suitable operating conditions can be found easily through trial and error and operator intuition. However, the higher viscosity of more concentrated inks dramatically shifts the range of settings that result in a homogeneous coating to higher vacuum levels, which are harder to find through hit or miss. A predictive model showing the range of operable conditions decreases material wastage inherent in experimentally searching for suitable parameters. In this study, the defect-free coating parameter window is explored experimentally and theoretically for two concentrations of PEFC cathode inks. Both a full capillary hydrodynamic model and a computationally cheaper viscocapillary model successfully predict the experimentally determined coating window within the experimental and model uncertainty limits for inks with 5.3 wt% and 12.0 wt% solids ink while maintaining the 0.1 mg Pt ·cm -2 Pt areal loading target. Here, this paper demonstrates a viable pathway for meeting the $30/kW net ultimate cost target of the United States Department of Energy (U.S. DOE) Hydrogen Fuel Cells Technologies Office (HFTO). The concentrated ink lowers the thermal energy and capital expenditure (CapEx) budget of the coating process by decreasing the amount of time, energy, and floorspace required for drying the coating.

25 ENERGY STORAGE↗

Strain–Activated Stimulated Emission from Multilayer MoSe 2 in a Narrow Operation Window

Herein, photoluminescence (PL) and fluorescence lifetime imaging (FLIM) in multilayer MoSe 2 are studied. Strain-activated stimulated emission via defect levels in multilayer MoSe 2 under laser excitation is observed, for the first time in defects of transition metal dichalcogenides. The stimulated emission is indicated by a threshold behavior of PL emission intensity with respect to laser intensity, strong polarization effects, achieved population inversion with a difference in lifetimes of two competing excited states, and localization of the stimulated emission zone as observed in FLIM. Here, the presented results not only demonstrate strain-activated stimulated emission and highlight the necessity of strain engineering in tailoring 2D layered materials for optoelectronic applications, but also shed light on the design of stimulated emission in transition metal dichalcogenide's defects to tailor for potential single-photon emission behavior.

enhanced emission↗

An evaluation of the demand response potential of integrated dynamic window and HVAC systems

Demand response (DR) increases the flexibility and reliability of the electricity grid as use of intermittent renewable energy sources increases. HVAC and envelope DR measures present the largest aggregate energy and peak demand savings potential of all commercial building end uses because their net demand savings occur during critical peak demand periods. Controllable envelope measures include switchable electrochromic windows, operable window attachments such as outdoor louvers, roller shades, and awnings, as well as other innovative facade technologies that can modulate both solar heat gain and daylight admission over a broad solar-optical range. This study evaluated the technical potential of DR-enabled dynamic windows to reduce critical peak demand for a prototypical medium office building situated in all 16 U.S. climates. Model predictive control (MPC) algorithms were designed to minimize electricity cost in daylit perimeter office zones through control of an electrochromic window with and without HVAC thermostat setpoint control. Conventional and time-of-use rates were used to shape the degree of DR. Median annual peak demand savings with window and thermostat control across all climate zones were 24.3 kW (4.4 W/m 2 ) per building or 15.9 W/m 2 for non-north perimeter zones. Resource adequacy at the whole building level was estimated to be 13.1 to 43.4 $/kW per year over the 30-year life of the installation. Co-benefits were increased energy efficiency, and reduced electricity cost and emissions. Visual and thermal comfort requirements were met at all times. Dynamic facades controlled by MPC have substantial technical potential for DR across all U.S. climates and warrant serious consideration for inclusion in DR portfolios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Space station proximity operations and window design

On-orbit proximity operations (PROX-OPS) consist of all extravehicular activity (EVA) within 1 km of the space station. Because of the potentially large variety of PROX-OPS, very careful planning for space station windows is called for and must consider a great many human factors. The following topics are discussed: (1) basic window design philosophy and assumptions; (2) the concept of the local horizontal - local vertical on-orbit; (3) window linear dimensions; (4) selected anthropomorphic considerations; (5) displays and controls relative to windows; and (6) full window assembly replacement.

Haines, Richard F.↗

Utilizing the US Lab Nadir Research Window for Remote Sensing Operations with The Window Observational Research Facility (WORF)

The Window Observational Research Facility (WORF) is an ISPR-based rack facility designed to take advantage of the high optical quality US Lab Nadir research window. The WORF is based on the ISS Expedite the Processing of Experiments to Space Station (EXPRESS) rack mechanical structure and electronic systems. The WORF has a unique payload volume located at the center of the rack that provides access to the window. The interior dimensions of the payload volume are 34-in. (86.36 cm) wide by 33-in. (83.82 cm) high by 23-in. (58.42 cm) deep. This facility supports the deployment of payloads such as 9 in. aerial photography cameras and 12 in. diameter optical equipment. The WORF coupled with the optical quality of the United States Lab window support the deployment of various payload disciplines. The WORF provides payloads with power, data command and control, air cooling, water cooling, and video processing. The WORF's payload mounting surfaces and interfaces include the interior payload mounting shelf and the interior and exterior aircraft-like seat tracks. The payload mounting shelf is limited to a maximum mass of 136 kg (299 pounds). The WORF can accommodate large payloads such as the commonly used Leica-Heerbrug RC-30 aerial photography camera (whose dimensions are 53.3 cm (21-in.) wide by 50.8 cm (20-in.) deep by 76.2 cm (30-in.) long). The performance characteristics of the WORF allow it to support an array of payload disciplines. The WORF provides a maximum of 3 Kw at 28 Vdc and has a maximum data rate of 10 Mbps. The WORF's unique payload volume is designed to be light-tight, down to 2.8 x 10(exp -11) Watts/cm2/steradian, and have low-reflective surfaces. This specially designed WORF interior supports payload investigations that observe low-light-level phenomenon such as aurora. Although the WORF rack does not employ any active rack isolation (i.e., vibration dampening) technology, the rack provides a very stable environment for payload operations (on the order of X microradians). The facility's software is capable of being updated during its period of deployment. The WORF project also includes a Suitcase Simulator to allow for a payload developer to verify data interfaces at his development site, a trainer rack for astronauts to learn how to operate the WORF prior to flight, and the use of the EXPRESS Functional Checkout Units to allow for payload checkout at the KSC prior to launch.

Turner, Richard↗

Dynamically re-configurable CMOS imagers for an active vision system

A vision system is disclosed. The system includes a pixel array, at least one multi-resolution window operation circuit, and a pixel averaging circuit. The pixel array has an array of pixels configured to receive light signals from an image having at least one tracking target. The multi-resolution window operation circuits are configured to process the image. Each of the multi-resolution window operation circuits processes each tracking target within a particular multi-resolution window. The pixel averaging circuit is configured to sample and average pixels within the particular multi-resolution window.

Yang, Guang↗

Advanced Fuels Campaign Time-at-Temperature Irradiation Campaign and Post-Irradiation Examination Plan

With increasing per capita energy consumption and rapidly growing energy consumption predicted for data centers, the US faces challenges in meeting projected energy demands. The current administration is attempting to accelerate the deployment of new nuclear construction by providing significant investments in advanced nuclear and by modernizing regulatory approaches for the licensing new reactors. However, enabling extended power uprates (EPUs) for the current nuclear reactor fleet would provide a shorter-term solution to better calibrate near-term energy generation capacity to the ever-growing energy demands of the modern era. One pathway to achieve power uprates is to increase the operational window by reassessing fuel safety limits around anticipated transients. Existing light-water reactors (LWRs) utilize a targeted operational window with well-defined operational efficiencies, yet this window is also often bound by conservative safety limits that result in suboptimal operational performance. For example, the operation of the existing fleet is highly constrained by safeguards to operation related to anticipated operational occurrences (AOOs), which are moderate-frequency transients expected with a frequency greater than 0.01 per reactor-year. These AOOs include temperature excursions where the critical heat flux for the system is exceeded, resulting in a departure from nucleate boiling (DNB) at the cladding surface. This DNB event is a thermohydraulic condition that, with current conservative fuel safety limits, results in the fuel rods being classified as “failed,” meaning that the cladding may not be returned to service.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Time-at-Temperature Irradiation Campaign and Post-Irradiation Examination Plan

With increasing per capita energy consumption and rapidly growing energy consumption predicted for data centers, the US faces challenges in meeting projected energy demands. The current administration is attempting to accelerate the deployment of new nuclear construction by providing significant investments in advanced nuclear and by modernizing regulatory approaches for the licensing new reactors. However, enabling extended power uprates (EPUs) for the current nuclear reactor fleet would provide a shorter-term solution to better calibrate near-term energy generation capacity to the ever-growing energy demands of the modern era. One pathway to achieve power uprates is to increase the operational window by reassessing fuel safety limits around anticipated transients. Existing light-water reactors (LWRs) utilize a targeted operational window with well-defined operational efficiencies, yet this window is also often bound by conservative safety limits that result in suboptimal operational performance. For example, the operation of the existing fleet is highly constrained by safeguards to operation related to anticipated operational occurrences (AOOs), which are moderate-frequency transients expected with a frequency greater than 0.01 per reactor-year. These AOOs include temperature excursions where the critical heat flux for the system is exceeded, resulting in a departure from nucleate boiling (DNB) at the cladding surface. This DNB event is a thermohydraulic condition that, with current conservative fuel safety limits, results in the fuel rods being classified as “failed,” meaning that the cladding may not be returned to service.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increasing the density in Wendelstein 7-X: benefits and limitations

In stellarators, increasing the density is beneficial for the energy confinement. While there is no single reason for this observation, it is still very robust across different devices and this is reflected in the empirical energy confinement time scaling for stellarators, ISS04. In order to study whether this is also true for Wendelstein 7-X, here the density scaling of the energy confinement time is analyzed and compared to ISS04 for the first divertor experiments. When the density is increased beyond a critical density, however, radiative collapses are frequently observed. Existing analytical models for the critical density are revisited to assess whether they can predict the accessible density range. Furthermore, since close to the collapse the radiation losses increase substantially, the impact on the global energy confinement is investigated. It is found that in plasmas with high radiation the density scaling of the energy confinement time becomes weaker, the reason for this observation is not yet clear. In the second half of the first divertor campaign, boronization was applied to W7-X for the first time. This broadened the operational window, allowing for operation at higher density and, hence, higher stored energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗