Search NASA⌕ Search

SEARCH · Search NASA

Results for “operational planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

SU-F-T-44: A Comparison of the Pre-Plan, Intra-Operative Plan, and Post-Implant Dosimetry for a Prostate Implant Case Using Prefabricated Linear Polymer-Encapsulated Pd-103

Purpose: To investigate the reproducibility and limitations of Pd-103 prostate brachytherapy using fixed length linear sources (CivaString). Methods: An LDR prostate brachytherapy case which was preplanned on MR images with prefabricated linear polymer-encapsulated Pd-103 sources (CivaString) was studied and compared with ultrasound based intra-operative planning and CT based post-implant dosimetry. We evaluated the following parameters among the three studies: prostate geometry (volume and cross sectional area), needle position and alignment deviations, and dosimetry parameters (D90). Results: The prostate volumes and axial cross sectional areas at center of prostate were measured as 41.8, 39.3 and 36.8 cc, and 14.9, 14.3, and 11.3 respectively on pre-plan MR, inter-op US, and post-implant CT studies. The deviation of prostate volumes and axial cross sectional areas measured on pre-planning MR and intra-operative US were within 5%. 17 out of 19 pre-planned needles were positioned within 5mm (the template grid size). One needle location was adjusted intra-operatively and another needle was removed due to proximity to urethra. The needle pathways were not always parallel to the trans-rectal probe due to the flexibility of CivaString. The angle of deviation was up to 10 degrees. Two pairs of needles were exchanged to better fit the length of prostate at the time of implant. This resulted in a prostate D90 of 153.8 Gy (124%) and 131.4 Gy (106.7%) for intra-op and PID respectively. Conclusion: Preplanning is a necessary part of implants performed with prefabricated linear polymer sources. However, as is often the case, there were real-time deviations from the pre-plan. Intra-op planning provides the ability conform to anatomy at the time of implant. Therefore, we propose to develop a systematic way to order extra strings of different length to provide the flexibility to perform intra-operative planning with fixed length strands.

60 APPLIED LIFE SCIENCES↗

Operational Plan for Underground Storage Tank 322 R2U2

This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

54 ENVIRONMENTAL SCIENCES↗

Developing Novel Performance Measures for Traffic Congestion Management and Operational Planning Based on Connected Vehicle Data

In this study, the authors present their efforts in exploring a new type of traffic data, referred to as internet-connected vehicle (ICV) data, for traffic congestion management and operational planning. Most currently manufactured vehicles contain onboard GPS and cellular modules, and they constantly connect to automobile manufacturers' clouds via cellular networks and upload their status. Some automobile manufacturers have recently redistributed the nonpersonal part of such data, such as geolocation, to third-party organizations for innovative applications. Compared with the traditional vehicle GPS data, the ICV data contain high-resolution GPS waypoints accompanied with the vehicles' abnormal moving events (e.g., hard braking). The ICV data also have huge potential in congestion management and operational planning. They explore to identify and analyze traffic congestion on both freeways and arterials using the ICV data. The ICV data adopted for this research are redistributed by Wejo Data Service, representing 10%-15% of all moving vehicles in the Dallas-Fort Worth (DFW) area in Texas. Through one case study for a freeway segment and one for an arterial segment, new traffic performance metrics based on the characteristics of ICV data have been presented. The highlights of these efforts are as follows: (I) queue length and propagation at freeway bottlenecks can be directly measured based on where and when most internet-connected vehicles slow down and join the queue; (II) an internet-connected vehicle's actual delay time on arterials can be directly measured according to its slow movement percentage, without assuming the nondelay travel speed; and (III) the ICV data set are also combined with the high-resolution traffic signal events to generate a ground-truth time-space diagram (TSD) on arterials - a common visualization of arterial signal performance for transportation planning and operations.

33 ADVANCED PROPULSION SYSTEMS↗

Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

54 ENVIRONMENTAL SCIENCES↗

Operational Planning Strategy for a Sequim Bay Underwater UXO Test Site (SBU2)

The Department of Defense (DoD) has identified more than 400 underwater sites that are potentially contaminated with munitions. Most areas are in shallow water (0-35 m) where the munitions pose a threat to human health and the environment. The Strategic Environmental Research and Development Program (SERDP) and Environmental Security Technology Certification Program (ESTCP) held a workshop in 2018 to establish the requirements, framework, protocols, responsibilities, and time lines for development of a series of underwater UXO Standardized Demonstration sites (“test beds”) for the purpose of testing the efficacy of sensors, equipment, and technologies to detect UXO. The workshop recommended a phased approach to building test beds to capitalize on: 1) incorporation of lessons learned from existing DoD funded projects, 2) leveraging existing underwater test bed environments funded by other programs, and 3) supporting recursive learning from early phases of the test bed development (i.e. efficiently optimizing through a scaling-up approach). This strategy document provides the framework to establish a working operational plan for the Sequim Bay Underwater UXO (SBU2) Test Bed (Phase II). Details of the plan are dependent on earlier phases of the effort as shown in Figure 1. Results from Phase I are being evaluated, and when complete, will inform the next iteration of this plan. As such, it should be considered a living document that will be informed by the lessons learned and updated as new information becomes known and requirements are refined. This approach will allow SBU2 to evolve to meet the needs of the remediation community.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ARM FY2024 Aerosol Operations Plan

The Atmospheric Radiation Measurement user facility (ARM) deploys a suite of aerosol and trace gas (further mentions of aerosols will assume inclusion of trace gases) instrumentation at each of ARM's observatories. ARM currently deploys five Aerosol Observing Systems, one each at: Southern Great Plains (SGP); Eastern North Atlantic (ENA); ARM Mobile Fabilities (AMFI 1, 2, and 3). Aerosol measurements at ARM’s North Slope of Alaska (NSA) observatory have historically been made by the National Oceanic and Atmospheric Administration (NOAA) and provided to ARM through a collaboration. As ARM’s support for aerosol instrumentation increases, it is important for ARM to communicate plans and priorities for aerosol measurements to the community to maximize the benefit and planning around scientific activities and to advance confidence in ARM’s aerosol measurements. ARM will develop a yearly aerosol operations plan for the upcoming fiscal year (October 1-September 30) starting with FY24. This plan will be open and available through the ARM aerosol instrument webpages and will include: Review of the previous activities since the last plan (in this case, 2018); Planned activities and their priorities for the upcoming FY; Calibration timing and efforts; Planned activities for data products and value-added products (VAP).

54 ENVIRONMENTAL SCIENCES↗

Near-Term Operational Planning at the Hanford Tank Farms: Link to Execution - 17091

Washington River Protection Solutions, LLC uses an earned value management system to flow-down contractual requirements to operational activities. A Rolling Work Window Schedule Process is then used to plan and coordinate near-term operational activities at the Hanford tank farms for execution. This near-term operational planning process has been extended using a Multi-Year Operating Plan, underpinned with a dynamic simulation model, to better link execution of daily activities with mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Duke Energy’s Integrated System and Operations Planning: A comparative analysis of integrated planning practices

Lawrence Berkeley National Laboratory and the National Renewable Energy Laboratory provided technical assistance to the South Carolina Office of Regulatory Staff to examine how Duke Energy’s Integrated System Operations Planning (ISOP) framework interacts with other electricity planning processes in South Carolina. While this report was prepared for the South Carolina ORS, the information contained herein may be useful to audiences in other states who are interested in IDP, including public utility commissions, state energy offices, other state agencies, utilities, and stakeholders. The report discusses how to access the ISOP process diagram created for the report, provides observations about Duke Energy’s ISOP from our interviews and review of publicly available materials; and assesses ISOP, based on best practices for integrated distribution planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Downhole Microphone Operation Plan

This document describes the setup and operation of an infrasound microphone manifold designed to capture acoustic waves in the shot borehole.

42 ENGINEERING↗

Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

54 ENVIRONMENTAL SCIENCES↗

LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

54 ENVIRONMENTAL SCIENCES↗

Trans Atlantic Infrasound Payload (TAIP) Operation Plan.

The Carolina Infrasound package, added as a piggyback to the 2016 ULDB ight, recorded unique acoustic signals such as the ocean microbarom and a large meteor. These data both yielded unique insights into the acoustic energy transfer from the lower to the upper atmosphere as well as highlighted the vast array of signals whose origins remain unknown. Now, the opportunity to y a payload across the north Atlantic offers an opportunity to sample one of the most active ocean microbarom sources on Earth. Improvements in payload capabilities should result in characterization of the higher frequency range of the stratospheric infrasound spectrum as well. Finally, numerous large mining and munitions disposal explosions in the region may provide \ground truth" events for assessing the detection capability of infrasound microphones in the stratosphere. The flight will include three different types of infrasound sensors. One type is a pair of polarity reversed InfraBSU microphones (standard for high altitude flights since 2016), another is a highly sensitive Chaparral 60 modified for a very low corner period, and the final sensor is a lightweight, low power Gem infrasound package. By evaluating these configurations against each other on the same flight, we will be able to optimize future campaigns with different sensitivity and mass constraints.

47 OTHER INSTRUMENTATION↗

ARM FY2025 Aerosol Operations Plan

The U.S. Department of Energy’s Atmospheric Radiation Measurement user facility (ARM) deploys at each of ARM’s observatories a suite of aerosol and trace gas (further mention of aerosols will assume inclusion of trace gases) instrumentation that constitute the Aerosol Observing Systems (AOS; Uin et al. 2019).

54 ENVIRONMENTAL SCIENCES↗