Search NASA⌕ Search

SEARCH · Search NASA

Results for “operational ranging systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cascaded systems analysis of photon counting detectors

Purpose: Photon counting detectors (PCDs) are an emerging technology with applications in spectral and low-dose radiographic and tomographic imaging. This paper develops an analytical model of PCD imaging performance, including the system gain, modulation transfer function (MTF), noise-power spectrum (NPS), and detective quantum efficiency (DQE). Methods: A cascaded systems analysis model describing the propagation of quanta through the imaging chain was developed. The model was validated in comparison to the physical performance of a silicon-strip PCD implemented on an experimental imaging bench. The signal response, MTF, and NPS were measured and compared to theory as a function of exposure conditions (70 kVp, 1–7 mA), detector threshold, and readout mode (i.e., the option for coincidence detection). The model sheds new light on the dependence of spatial resolution, charge sharing, and additive noise effects on threshold selection and was used to investigate the factors governing PCD performance, including the fundamental advantages and limitations of PCDs in comparison to energy-integrating detectors (EIDs) in the linear regime for which pulse pileup can be ignored. Results: The detector exhibited highly linear mean signal response across the system operating range and agreed well with theoretical prediction, as did the system MTF and NPS. The DQE analyzed as a function of kilovolt (peak), exposure, detector threshold, and readout mode revealed important considerations for system optimization. The model also demonstrated the important implications of false counts from both additive electronic noise and charge sharing and highlighted the system design and operational parameters that most affect detector performance in the presence of such factors: for example, increasing the detector threshold from 0 to 100 (arbitrary units of pulse height threshold roughly equivalent to 0.5 and 6 keV energy threshold, respectively), increased the f{sub 50} (spatial-frequency at which the MTF falls to a value of 0.50) by ∼30% with corresponding improvement in DQE. The range in exposure and additive noise for which PCDs yield intrinsically higher DQE was quantified, showing performance advantages under conditions of very low-dose, high additive noise, and high fidelity rejection of coincident photons. Conclusions: The model for PCD signal and noise performance agreed with measurements of detector signal, MTF, and NPS and provided a useful basis for understanding complex dependencies in PCD imaging performance and the potential advantages (and disadvantages) in comparison to EIDs as well as an important guide to task-based optimization in developing new PCD imaging systems.

60 APPLIED LIFE SCIENCES↗

System Design of a 2.0 MWth Sodium/Molten Salt Pilot System

Nitrate molten salt concentrating solar power (CSP) systems are currently deployed globally and are considered state-of the art heat transfer fluids (HTFs) for present day high-temperature operation. Although slightly higher limits may be possible with molten salt, to fully realize SunShot efficiency goals of $15/kWhth HTFs and an LCOE of 6¢/kWh, HTF technologies working at higher temperatures (e.g., 650 °C to 750 °C) will require an alternative to molten salts, such as with alkali metal systems. This investigation explores the development of a 2.0 MWth sodium receiver system that employs a sodium receiver as the HTF, as well as with a ternary chloride (20%NaCl/40%MgCl/40%KCl by mol wt.%) salt as a thermal energy storage (TES) medium to facilitate a 6-hr. storage duration. A sodium-to-salt heat exchanger model as well as a salt-to-sCO2 primary heat exchanger model are employed and evaluated in this investigation. A thermodynamic system design model was developed using Engineering Equation Solver (EES) where state properties were calculated at inlets and outlets along both hot and cold legs of the pilot-scale plant. This investigation assesses receiver performance as well as system efficiency studies for the pump and system operational ranges. Results found that high efficiency sodium receivers were found to have higher heat transfer coefficients and required far less spreading of incident flux. The system performance model results suggest that for a pump speed of 2400 RPM, respective hot and cold pump TDH values were determined to be 260.1–307 ft. and 260.1–307 ft for pump flow rates of 90–120 GPM.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a networked hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAr regulation technologies as an example to illustrate system setups, communication requirements among different HIL simulation systems, and system connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

Xie, Fuhong↗

Broadband carbon monoxide laser system operating in the wavelength range of 2.5 - 8.3 {mu}m

A two-cascade frequency conversion of CO-laser radiation is demonstrated in a single sample of a nonlinear ZnGeP{sub 2} crystal. The crystal is pumped by a repetitively pulsed cryogenic lowpressure CO laser operating on {approx}150 vibration - rotational transitions in the wavelength range 5.0 - 7.5 {mu}m, which corresponds to the frequency range of a half octave. In the first conversion cascade, generation of second harmonic and sum frequencies of various pairs of CO-laser radiation give {approx}350 emission lines in the wavelength range 2.5 - 3.7 {mu}m. In the second cascade, by mixing the radiation converted in the first cascade with the residual radiation of the CO laser we have obtained {approx}90 lines in the range 4.3 - 5.0 {mu}m and more than 80 lines in the range 7.5 - 8.3 {mu}m. Thus, using a single sample of the nonlinear ZnGeP{sub 2} crystal pumped by the radiation of a single CO laser we have produced a source of broadband (more than one and a half octaves) laser radiation, simultaneously operating at {approx}670 lines in the wavelength range 2.5 - 8.3 {mu}m. (lasers)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Initial Characterization of the NREL Large-Amplitude Motion Platform

The Large Amplitude Motion Platform (LAMP) at NREL represents a significant advancement in the controlled testing of Wave Energy Converters (WECs) under laboratory conditions. Originally designed by E2M as a six-degree-of-freedom (DOF) Stewart platform for flight simulation, LAMP has been adapted by NREL to facilitate the mounting and evaluation of WECs. This adaptation enables dry testing of WECs using motion profiles similar to the ocean, facilitating the iterative design, testing, and validation of WEC performance prior to ocean deployments. This report presents the initial work completed to characterize LAMP, with particular emphasis on its stability and operational capabilities across various single and multi-degree-of-freedom (DOF) motion profiles. The report includes planned comparisons at three distinct mass payloads, aimed at assessing the platform's positional accuracy, frequency response, and endurance over extended runtime periods. These experimental tests are critical for establishing the platform's limitations and ensuring that the data generated during WEC validation is both accurate and reproducible. The outcomes of this study not only contribute to a deeper understanding of LAMP's capabilities but also lay the groundwork for future advancements in WEC testing methodologies. By providing robust and reliable performance data within a controlled laboratory setting, the findings are expected to significantly enhance the development and commercialization of marine energy technologies. This report presents the initial findings of the LAMP Characterization work and proposed steps to further understand and characterize LAMP. Data collected during this work can be found on MHKDR at: https://mhkdr.openei.org/submissions/602 Note that this report shares the measured/found instantaneous maximum operating range of LAMP. For most applications the maximum operating range cannot be used for system health and longevity. The operating range and capabilities of LAMP will be evaluated on a case-by-case basis, single-DOF position, velocity, and acceleration values presented in Table 4a-c, and Table 5 should be taken as instantaneous absolute maximum values. Future use of LAMP will likely be limited to smaller values.

16 TIDAL AND WAVE POWER↗

Dynamic modeling of heat pipe integrated thermal battery latent heat storage system experiment validation

A heat pipe integrated thermal battery system has been constructed to investigate a high-temperature latent heat thermal energy storage technology that takes advantage of near isothermal operation of latent heat storage and heat pipes to potentially enable high-energy isothermal heat storage. A dynamic model constructed in Modelica has been validated, showing errors between 2.5 °C–39.7 °C across 10-h to 47-h simulations against experiment results, showing good prediction capability of experiment output, especially against phase change time. Model calibrations showing vessel heat-up capability of 3 kW and heat pipes combining to provide 600 W each during experiment operation validate experiment circumstances including reduced material loading and reduced power capability. The experiment configuration uses an Al-Mg-Zn eutectic metal as the storage material, heated via heat tape wrapped around the vessel and guide tubes to bring the system to operation range (>400 °C) and to simulate charging heat exchange, respectively, with heat rejection occurring through the surfaces of the material and facilitated via guide tubes with less insulation wrapping. The model is available in the open-source repository HYBRID on Github.

25 - ENERGY STORAGE↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

digital twin, distribution system, co-simulation, ↗

Dynamometer Facts

The National Renewable Energy Laboratory's (NREL's) Flatirons Campus features two dynamometers in the Water Power Systems Laboratory that can perform research validation on marine and hydrokinetic energy devices as well as wind turbine systems from 100 watts to 15 kilowatts (kW) in size. These capabilities can also be combined with programmable loads, blue economy (nrel.gov/water/powering-blue- economy.html) application simulators, and microgrid emulators to test an extensive range of system operation and technology integration. The dynamometers replicate realistic operational conditions to assess power take-of systems and advance the technical readiness of innovations.

dynomometer↗

Reliability Study: On-Site Electrical System, 1998-2015

This report documents an analysis of the reliability of on-site electrical systems at U.S. commercial nuclear plants during the period 1998-2015. The study contains both individual component studies and system studies. The component studies are focused on key electrical components including circuit breakers, battery chargers, buses, batteries, and transformers. Data from the range of 1998 to 2015 were gathered, reviewed, and statistically evaluated for impacts on reliability as a function of relevant parameters: manufacturer, system, operating environment, inspection/testing regimen, operating range (voltages, amperes), setpoints, and other factors. The system studies identify seven operating nuclear power plants/units that represent different designs of offsite power sources and interconnecting power circuit paths, develop electrical single line diagrams and detailed fault tree models for the representing designs, and evaluate the electrical system reliability using the reliability data obtained from the component studies.

99 GENERAL AND MISCELLANEOUS↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The Distribution System Operator with Transactive (DSO+T) Study

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution System Operator with Transactive (DSO+T) Study: Volume 1 (Main Report)

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrogen generation systems utilizing sodium silicide and sodium silica gel materials

Systems, devices, and methods combine reactant materials and aqueous solutions to generate hydrogen. The reactant materials can sodium silicide or sodium silica gel. The hydrogen generation devices are used in fuels cells and other industrial applications. One system combines cooling, pumping, water storage, and other devices to sense and control reactions between reactant materials and aqueous solutions to generate hydrogen. Multiple inlets of varied placement geometries deliver aqueous solution to the reaction. The reactant materials and aqueous solution are churned to control the state of the reaction. The aqueous solution can be recycled and returned to the reaction. One system operates over a range of temperatures and pressures and includes a hydrogen separator, a heat removal mechanism, and state of reaction control devices. The systems, devices, and methods of generating hydrogen provide thermally stable solids, near-instant reaction with the aqueous solutions, and a non-toxic liquid by-product.

08 HYDROGEN↗

Hydrogen generation systems utilizing sodium silicide and sodium silica gel materials

Systems, devices, and methods combine reactant materials and aqueous solutions to generate hydrogen. The reactant materials can sodium silicide or sodium silica gel. The hydrogen generation devices are used in fuels cells and other industrial applications. One system combines cooling, pumping, water storage, and other devices to sense and control reactions between reactant materials and aqueous solutions to generate hydrogen. Multiple inlets of varied placement geometries deliver aqueous solution to the reaction. The reactant materials and aqueous solution are churned to control the state of the reaction. The aqueous solution can be recycled and returned to the reaction. One system operates over a range of temperatures and pressures and includes a hydrogen separator, a heat removal mechanism, and state of reaction control devices. The systems, devices, and methods of generating hydrogen provide thermally stable solids, near-instant reaction with the aqueous solutions, and a non-toxic liquid by-product.

08 HYDROGEN↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Resource Adequacy Suite (PRAS) v0.8 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system's risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.8 of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DSO+T: Expanded Study Results DSO+T Study: Volume 5

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. This report volume provides a detailed set of results for the DSO+T study extending results presented in Volumes 1, 2, and 4. The engineering and economic performance of the transactive energy scheme is presented for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

24 POWER TRANSMISSION AND DISTRIBUTION↗