Search NASA⌕ Search

SEARCH · Search NASA

Results for “operations & maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025

This report documents the operations, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) and its supporting infrastructure during FY2024. The METL facility had a very successful seventh year of operations while supporting the testing of multiple test article experiments in the facility. The METL facility continued supporting the Gear Test Assembly (GTA) testing and the Thermal Hydraulic Experimental Test Article (THETA) with the full testing with both the primary and secondary systems. Work to accommodate two additional experiments, a flow sensor test article (F-STAr) gripper test and a fuel handling gripper test article (GrTA) continued as they are expected to undergo testing in METL in FY2025. In addition, a new 18” test article, the Sample Testing Basket (STB) was used a few times to provide screening tests for sodium service materials. A fifth test vessel was installed in the location of Test Vessel 6, and a wet vapor nitrogen sodium processing system was developed and initially tested.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Solar Thermal Test Facility: Operations & Maintenance Report

The NSTTF O&M Project continues the operation and maintenance activities of the existing critical capabilities and infrastructure at the NSTTF. This project is to support and assure the success of Solar Heat for Industrial Process in the United States and the larger global community by ensuring the NSTTF is a safe and operational facility. The primary goal of this project will be to maintain the solar tower and heliostat field while also allowing NSTTF staff to improve processes for operations and maintenance. This includes expanding our preventative maintenance program, inventory systems, and our data sharing capabilities. Additionally, this will support an outreach program with regular seminars, sharing of data, and the release of open-source software to support heliostat metrology

14 SOLAR ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Operations, maintenance, and cost considerations for PV+Storage in the United States

Battery storage systems are increasingly being installed at photovoltaic (PV) sites to address supply-demand balancing needs. Although there is some understanding of costs associated with PV operations and maintenance (O&M), costs associated with emerging technologies such as PV plus storage lack details about the specific systems and/or activities that contribute to the cost values. This study aims to address this gap by exploring the specific factors and drivers contributing to utility-scale PV plus storage systems (UPVS) O&M activities costs, including how technology selection, data collection, and related and ongoing challenges. Specifically, we used semi-structured interviews and questionnaires to collect information and insights from utility-scale owners and operators. Data was collected from 14 semi-structured interviews and questionnaires representing 51.1 MW with 64.1 MWh of installed battery storage capacity within the United States (U.S.). Differences in degradation rate, expected life cycle, and capital costs are observed across different storage technologies. Most O&M activities at UPVS related to correcting under-performance. Fires and venting issues are leading safety concerns, and owner operators have installed additional systems to mitigate these issues. There are ongoing O&M challenges due the lack of storage-specific performance metrics as well as poor vendor reliability and parts availability. Insights from this work will improve our understanding of O&M consideration at PV plus storage sites.

14 SOLAR ENERGY↗

OPTOM: Optimization of Parabolic Trough - Operations & Maintenance

The US Department of Energy’s SunShot goals look to reduce the cost of Concentrating Solar Power (CSP) technology to 5¢/kWh for baseload plants. This is about a 50% reduction from current costs. To achieve this cost target, a significant reduction in operation and maintenance (O&M) costs of 40 to 50% is likely needed. Advances are needed in the O&M practices of CSP plants if the technology is to achieve the SunShot cost goals. Digitization of plant performance and O&M data has become a new best practice in the world of renewable energy asset management. Owners and operators of large photovoltaic and wind power plants are working to digitize performance and O&M data at their existing assets, to improve their management of the facilities, to increase performance, reduce O&M costs, and lower the overall life cycle cost of ownership. CSP power plants are behind the curve of other technologies on the digitization of plant information to aid in the plant asset management. This project directly addresses the objective of digitizing the O&M data of the solar field, focusing on three areas: 1) creating a framework for sharing data and information, 2) creating a system for monitoring and managing the maintenance of the solar field collectors, and 3) developing analytic tools to identify issues in the solar field. According to the NREL CSP Best Practices Study, the current practice at many CSP plants is to rely on paper lists, spreadsheets, and email for monitoring and managing problems and maintenance in the solar field. The key element to digitize solar field O&M is the creation of a centralized data archive that all users and systems can interface with. This project developed a centralized relational database framework that allows users and applications to access and share data. Conventional power plants utilize Computerized Maintenance Management Systems (CMMSs) to track the corrective, preventive (scheduled), and predictive maintenance of equipment and subsystems in the power plant. CSP plants use these systems in the power block, but while these systems specialize at tracking maintenance on up to thousands of pieces of equipment, they are not well suited for tracking the tens or hundreds of thousands of components in large commercial CSP or photovoltaic solar fields. In this project we developed a new software application referred to as FieldStatus (TM). This is a specialized database program that is used to track the status of each collector and its components. This application is designed to complement the existing CMMS to enable improved tracking and management of maintenance activities in the solar field. One of the major maintenance tasks for solar fields is maintaining the cleanliness of the mirrors. Although seemingly a relatively straight forward task, it has often proven challenging to maintain high levels of cleanliness in an efficient and cost-effective manner. This project developed new tools and metrics for monitoring and optimizing solar field cleaning resources and overall solar field cleanliness.

14 SOLAR ENERGY↗

Operation, maintenance, and installation instructions for HLW thermal catalytic oxidizer/reducer (TCO)

The HLW TCO Units are a combination of four rectangular vessels; the Recuperative Heat Exchanger, Electric Heater, Selective Catalytic Oxidizer (SCO), and the Selective Catalytic Reducer (SCR). Each housing is simply a closed rectangular box with formed angle stiffeners welded to the outside perimeter. The housings are connected with process piping and sit on a skid. There is an external frame to support all major process piping and the Electric Heater. The process piping consists of a 14" inlet which enters the heat exchanger. Then the off-gas flows through 18" cross over piping which leads to the heater. Once the off-gas is heated, another section of 18" process piping leads the off-gas through the SCO and SCR. The off-gas then flows through the heat exchanger before exiting through 16" process piping which leads to the customer's piping. The other equipment associated with the HLW TCO is the Ammonia Dilution Skid. The dilution skid controls the ammonia injection into the off-gas. The dilution skid supports two process lines, a 2" line and a 1" line which carries process air and anhydrous ammonia respectively. Ammonia injection into the off-gas is required prior to entering the SCR to ensure the NOx reduction occurs through the SCR catalyst bank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Uncertainty of Deep Reinforcement Learning Based Decision Making for Operations and Maintenance of Nuclear Power Plant

This paper summarizes research that integrates condition monitoring and prognostics with decision making for nuclear power plant operations and maintenance. As part of this research, we have developed an online asset management tool to help reduce life-cycle maintenance and repair costs. Using the latest advancements in condition monitoring, supply chain analytics, and deep reinforcement learning, we have created a predictive maintenance tool that can optimize the maintenance and spare-part management of a repairable nuclear system. To demonstrate these methods, preliminary studies were conducted on a simple, representative maintenance system undergoing a stochastic degradation process that requires repairs or replacement to continue operation. Through Monte Carlo simulations, we were able to reduce maintenance spending by approximately 50% compared to optimized, time-based maintenance strategies. Not only does the decision maker reduce the average life-cycle costs, it also minimizes the chance of high cost scenarios, lowering the variance of the expected cost distributions, and reducing overall financial risk. Furthermore, this work also studies the ability of the decision maker to handle various levels of noise from observation uncertainty. By introducing uncertainty into the decision-making process, we have quantified the robustness and resiliency of the decision maker, as well as identified necessary levels of observability to demonstrate cost effectiveness.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

DOE’s National Solar Thermal Test Facility Operations and Maintenance

This report details operations and maintenance (O&M) activities performed across Fiscal Years 2022 through 2024 in support of the continued capabilities of the National Solar Thermal Testing Facility (NSTTF) at Sandia National Laboratories. The NSTTF O&M project is funded by the U.S. Department of Energy Solar Energy Technologies Office (SETO) to support research activities and testing on behalf of external customers at the facility under award number CPS 38491. During the project period, the NSTTF made progress in the areas of site metrics, site maintenance and utilization tracking, and customer engagement. The O&M project also supported special initiatives including procurement of a heat exchanger for particle concentrating solar thermal processes and a scoping and cost study for refurbishment and repair of component in the NSTTF heliostat field.

14 SOLAR ENERGY↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wind Plant Operations and Maintenance Challenges and Research Opportunities

Global wind industry has experienced tremendous growth during the past two decades and the trend does not appear changing in near future. However, the industry is still challenged by premature component failures and high operations & maintenance (O&M) costs, which can account for up to 35% of levelized cost of energy. It is imperative for the industry to improve performance, reliability and reduce O&M costs through advanced technologies, enabled by research in related disciplines, to be competitive. This talk will first briefly discuss the challenges with wind plant O&M, then give an overview of related NREL research in the areas of performance, reliability, and O&M cost modeling, finally touch on future R&D opportunities in related areas. The authors hope some of these challenges are of interested to and can be addressed by the INFORMS community in future.

costs↗

Deploying Extended Reality (XR) for Digital Operations and Maintenance (O&M) at the Mechanisms Engineering Test Loop (METL)

This report documents the preliminary efforts to digitize operation and maintenance (O&M) activities for the Mechanisms Engineering Test Loop (METL). METL became operational in September 2018 with the mission to provide an ecosystem for Advanced Reactor Development (ARD). METLs flagship facility’s primary purpose is conducting small to intermediate scale tests for Sodium Fast Reactors (SFR). Its resemblance to commercial SFR’s intermediate heat transport system, prototypic operating conditions, and industrial construction practices/materials provides the overarching benefit of establishing a proving ground for emerging operations and maintenance (O&M) activities such as incorporating Extended Reality (XR) applications throughout the program lifecycle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

Operation and Maintenance of PV Systems: Data Science, Analysis, and Standards

This effort improves the effectiveness and reduce uncertainty in O&M cost through four primary objectives/tasks: 1) institutionalize standards for reliability and availability reporting for large PV power plants; 2) bridge systemic O&M knowledge gaps around important topics affecting O&M; 3) characterize systemic failure modes and patterns and accelerate O&M experiential learning cycles using field data; and 4) establish a baseline understanding of UPVS O&M cost drivers. Key results of this effort include publication of IEC standards, published topical papers on O&M topics, training, and characterize field data for climate- and service-related patterns (additional details below). Integrating these results serves to reduce performance risk and facilitate improvement in the way solar projects are operated and maintained. Results are well received and two publications are among the most successful SETO publications at NREL ("Model of Operation and Maintenance Costs for Photovoltaic Systems with over 40,000 downloads and "Best Practices in Operation and Maintenance of PV Systems, 3rd Ed." with over 90,000 downloads).

14 SOLAR ENERGY↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗