Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimal meter placement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Scalable Meter Placement Method for Distribution System State Estimation

This paper studies the optimal meter placement problem for distribution system state estimation given limited measurement resources. We formulate the problem as a mixed integer semi-definite programming that minimizes the worst case estimation errors over a set of operating points. To solve the problem, we first relax the problem as a convex optimization problem. Motivated by the lack of scalability of existing solvers, we next leverage the special structure of the cost function and propose an algorithm based on barrier method that solves the problem with significantly better numerical performance. The proposed method has been validated on the IEEE 13-bus, IEEE 123-bus, and IEEE 8,500-bus feeders.

barrier method↗

Electrical Resistivity Tomography based monitoring of stress perturbations to optimize placement of high-precision strain meters

The Center for Understanding Subsurface Signals and Permeability is a new U.S. Department of Energy Earthshot Center focused on understanding and predicting the long-term evolution of permeability in enhanced geothermal systems. The center will use a highly instrumented testbed within the Sanford Underground Research Facility to conduct field scale experiments that elucidate and test capabilities to simulate geochemical-geomechanical interactions and permeability evolution. Here we demonstrate initial developments using previously collected electrical resistivity tomography (ERT) monitoring data with high-performance multi-physics modelling advancements to inform the optimal location of two new monitoring boreholes. Specifically, ERT monitoring data collected during shear stimulation testing shows marked responses to changes in stress during borehole pressurization. We demonstrate how the same response is being simulated, ultimately to train a machine-learning algorithm to estimate rock properties and enable enhanced prediction of stress and strain responses anticipated during future testing campaigns.

Stress, EGS, CUSSP, 3D Electrical Imaging↗

Real-Time Identifiability of Power Distribution Network Topologies With Limited Monitoring

Recovering the distribution grid topology in real time is essential to perform several distribution system operator (DSO) functions. DSOs often do not have any direct monitoring of switch statuses to track reconfiguration. At the same time, installing real-time meters at a large number of buses is challenging due to the cost of endowing every metered bus with a real-time communication channel. The goal of this letter is to develop a meter placement strategy allowing DSOs to deploy only few real-time meters. After casting the topology recovery task as an optimization problem, a meter placement strategy ensuring unique recovery of the true topology is devised. A graph-theoretical approach is pursued to partition the grid into connected portions called observable islands . The proposed strategy then simply requires installing a meter in the path between every pair of boundary nodes , i.e., ends of edges connecting two different islands. Under some ideal assumptions, this placement strategy ensures unique recovery of the topology. The approach is also validated through numerical simulations under realistic scenarios using a standard IEEE benchmark feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal placement of data concentrators for expansion of the smart grid communications network

Evolving power systems with increasing renewables penetration, along with the development of the smart grid, calls for improved communication networks to support these distributed generation sources. Automatic and optimal placement of communication resources within the advanced metering infrastructure is critical to provide a high‐performing, reliable, and resilient power system. Three network design formulations based on mixed‐integer linear and non‐linear programming approaches are proposed to minimise network congestion by optimising residual buffer capacity through the placement of data concentrators and network routeing. Results on a case study show that the proposed models improve network connectivity and robustness, and increase average residual buffer capacity. Maximising average residual capacity alone, however, results in both oversaturated and underutilised nodes, while maximising either minimum residual capacity or total reciprocal residual capacity can yield much‐improved network load allocation. Consideration of connection redundancy improves network reliability further by ensuring quality‐of‐service in the event of an outage. Analysis of multi‐period network expansion shows that the models do not deviate significantly from optimal when used progressively (within 5% deviation), and are effective for utility planners to use for smart grid expansion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Efficiency and Operational Cost Savings: A Framework for Automated Rooftop PV Placement

Residential energy consumers are charged based on a utility rate structure, such as net metering or feed-in tariff. To lower consumers' electricity bills, expensive batteries are deployed to reduce the electricity fed from the grid during peak hours. However, strategic photovoltaic (PV) panel placement enables the reduction of operational energy cost while considering the spatial feasibility and efficiency for hosting rooftop PV. In this paper, we present a framework to automatically identify the optimal location of rooftop PV panels on residential buildings. Our framework integrates multiple workflows, including energy and environmental simulation, parametric modeling, and optimization to identify the ideal location of PV panels to balance the demand and supply at a building and community scale. These workflows are linked using the Grasshopper plug-in for Rhinoceros CAD software. The framework includes two different workflows, each satisfying a target for optimal PV placement: (a) maximizing PV panel efficiency, where users aim to maximize energy generation, and (b) minimizing operational energy cost, where "best'' panels are selected considering utility rates for operational energy cost. Our framework is demonstrated in a residential community in Fort Collins, Colorado, to generate the optimal PV placement for each of the two aforementioned targets. Results from the two workflows are compared to illustrate the effect of PV location and orientation on solar energy production efficiency and operational energy cost. The developed workflows are introduced as tools within the Grasshopper plug-in to investigate the solar potential of rooftop PV panels while taking into account factors such as contextual shading, utility rate structures, and buildings' energy demand profiles.

30 DIRECT ENERGY CONVERSION↗

Smart distribution systems

The increasing importance of system reliability and resilience is changing the way distribution systems are planned and operated. To achieve a distribution system self-healing against power outages, emerging technologies and devices, such as remote-controlled switches (RCSs) and smart meters, are being deployed. The higher level of automation is transforming traditional distribution systems into the smart distribution systems (SDSs) of the future. The availability of data and remote control capability in SDSs provides distribution operators with an opportunity to optimize system operation and control. In this paper, the development of SDSs and resulting benefits of enhanced system capabilities are discussed. A comprehensive survey is conducted on the state-of-the-art applications of RCSs and smart meters in SDSs. Specifically, a new method, called Temporal Causal Diagram (TCD), is used to incorporate outage notifications from smart meters for enhanced outage management. To fully utilize the fast operation of RCSs, the spanning tree search algorithm is used to develop service restoration strategies. Optimal placement of RCSs and the resulting enhancement of system reliability are discussed. Distribution system resilience with respect to extreme events is presented. Furthermore, test cases are used to demonstrate the benefit of SDSs. Active management of distributed generators (DGs) is introduced. Future research in a smart distribution environment is proposed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sensor Placement Optimization Study for the Built Environment: Operational Use Cases

Systems of fixed-position radiation sensors can provide information that assists emergency responders following nuclear and radiological incidents. State, local, tribal, and territorial (SLTT) government agencies that implement systems of fixed-position sensors are faced with numerous decisions regarding sensor selection, quantity, and placement. To develop guidance on implementation of radiation detection systems, we simulated the release of radioactive material in an urban environment using a combination of three models: the Weather Research Forecasting (WRF), Quick Urban and Industrial Complex (QUIC), and Monte Carlo N-Particle (MCNP) models. We then evaluated the performance of several hypothetical sensor systems. The small number of simulations we conducted are not sufficient to generate definitive design guidance for radiation sensor systems, but we did identify trends that would be of interest to emergency planners. For a scenario that releases 1000 curies of Cs-137, radiation detectors were needed at 500-meter intervals to have a high likelihood of event detection and to estimate source location and plume detection. We also noted that optimal detector altitude varied with distance to the source. We recommend additional research in this area be conducted to support developing sensor placement guidelines that expand on a range of locations, isotopes, activity levels, and different weather conditions. Original simulation strategies included a range of environments, additional radioisotopes (Am241 and AmBe), and a larger selection of sensor types. These types of expansions would support SLTT guidance on sensor system recommendations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Learning Distribution Grid Topologies: A Tutorial

Unveiling feeder topologies from data is of paramount importance to advance situational awareness and proper utilization of smart resources in power distribution grids. This tutorial summarizes, contrasts, and establishes useful links between recent works on topology identification and detection schemes that have been proposed for power distribution grids. The primary focus is to highlight methods that overcome the limited availability of measurement devices in distribution grids, while enhancing topology estimates using conservation laws of power-flow physics and structural properties of feeders. Grid data from phasor measurement units or smart meters can be collected either passively in the traditional way, or actively, upon actuating grid resources and measuring the feeder's voltage response. Analytical claims on feeder identifiability and detectability are reviewed under disparate meter placement scenarios. Such topology learning claims can be attained exactly or approximately so via algorithmic solutions with various levels of computational complexity, ranging from least-squares fits to convex optimization problems, and from polynomial-time searches over graphs to mixed-integer programs. Although the emphasis is on radial single-phase feeders, extensions to meshed and/or multiphase circuits are sometimes possible and discussed. Here this tutorial aspires to provide researchers and engineers with knowledge of the current state-of-the-art in tractable distribution grid learning and insights into future directions of work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Determining Optimal Magnetometer Configuration on MAGIS-100

Long-baseline atom interferometers such as the Matter-wave Atomic Gradiometer Interferometric Sensor (MAGIS-100) require stringent control and continuous characterization of background magnetic fields and spatial gradients to prevent systemic phase shifts that mimic ultralight dark matter or gravitational wave signatures. Because direct sensor placement within the ultra-high vacuum beam pipe is infeasible, in-situ magnetic field monitoring relies on external sensor arrays situated in the surrounding annular region. This work demonstrates a field reconstruction framework for a 5.3-meter MAGIS-100 modular section using finite-element Opera simulations. Transverse magnetic fields are expanded using a cylindrical multipole framework as informed by Fermilab’s Muon g-2 experiment, with magnetometer array configurations optimized via Fisher information matrix D-optimality. Inverting external sensor readings through a Gauss-Newton scheme recovers interior tube fields across distinct axial positions. In the discontinuity-averse uniform region (slice pair P4), the model achieves sub-noise-floor performance with a cross-validated root-mean-square error (RMSE) of $6.7227 \times 10^{-4}\text{ A/m}$ ($0.845\times$ sensor noise floor) and an interior field coefficient of variation of $1.71\%$. An elbow criterion in the Fisher bounds establishes $n_{\text{max}} = 2$ as the optimal multipole truncation order to prevent noise amplification from over-parameterization, with $n_{\text{max}} = 3$ (sextupole) order chosen for analysis to demonstrate further complexity and cross-pair comparison. Furthermore, analytical differentiation of the fitted multipole coefficients yields dense spatial maps of the transverse Jacobian gradient matrix $\nabla \mathbf{H}$ along with propagated $1\sigma$ uncertainty bounds across the beam region ($r \le 2.75\text{ in}$). This operational framework confirms that external magnetometer arrays can reliably monitor magnetic field uniformity and spatial gradients along the 100-meter flight path given appropriate sampling for any complexity order.

Appleby, Darwin [William Rainey Harper Coll.] (ORC↗

Determining Optimal Magnetometer Configuration on MAGIS-100

Long-baseline atom interferometers such as the Matter-wave Atomic Gradiometer Interferometric Sensor (MAGIS-100) require stringent control and continuous characterization of background magnetic fields and spatial gradients to prevent systemic phase shifts that mimic ultralight dark matter or gravitational wave signatures. Because direct sensor placement within the ultra-high vacuum beam pipe is infeasible, in-situ magnetic field monitoring relies on external sensor arrays situated in the surrounding annular region. This work demonstrates a field reconstruction framework for a 5.3-meter MAGIS-100 modular section using finite-element Opera simulations. Transverse magnetic fields are expanded using a cylindrical multipole framework as informed by Fermilab’s Muon g-2 experiment, with magnetometer array configurations optimized via Fisher information matrix D-optimality. Inverting external sensor readings through a Gauss-Newton scheme recovers interior tube fields across distinct axial positions. In the discontinuity-averse uniform region (slice pair P4), the model achieves sub-noise-floor performance with a cross-validated root-mean-square error (RMSE) of $6.7227 \times 10^{-4}\text{ A/m}$ ($0.845\times$ sensor noise floor) and an interior field coefficient of variation of $1.71\%$. An elbow criterion in the Fisher bounds establishes $n_{\text{max}} = 2$ as the optimal multipole truncation order to prevent noise amplification from over-parameterization, with $n_{\text{max}} = 3$ (sextupole) order chosen for analysis to demonstrate further complexity and cross-pair comparison. Furthermore, analytical differentiation of the fitted multipole coefficients yields dense spatial maps of the transverse Jacobian gradient matrix $\nabla \mathbf{H}$ along with propagated $1\sigma$ uncertainty bounds across the beam region ($r \le 2.75\text{ in}$). This operational framework confirms that external magnetometer arrays can reliably monitor magnetic field uniformity and spatial gradients along the 100-meter flight path given appropriate sampling for any complexity order.

Appleby, Darwin [William Rainey Harper Coll.] (ORC↗

Intermediate Scale Laboratory Testing to Understand Mechanisms of Capillary and Dissolution Trapping during Injection and Post-Injection of CO 2 in Heterogeneous Geological Formations

Carbon Capture and Storage (CCS) represents a technology aimed to reduce atmospheric loading of CO 2 from power plants and heavy industries by injecting it into deep geological formations, such as saline aquifers. A number of trapping mechanisms contribute to effective and secure storage of the injected CO 2 in supercritical fluid phase (scCO 2 ) in the formation over the long term. The primary trapping mechanisms are structural, residual, dissolution and mineralization. Knowledge gaps exist on how the heterogeneity of the formation manifested at all scales from the pore to the site scales affects trapping and parameterization of contributing mechanisms in models. An experimental and modeling study was conducted to fill these knowledge gaps. Experimental investigation of fundamental processes and mechanisms in field settings is not possible as it is not feasible to fully characterize the geologic heterogeneity at all relevant scales and gathering data on migration, trapping and dissolution of scCO 2 . Laboratory experiments using scCO 2 under ambient conditions are also not feasible as it is technically challenging and cost prohibitive to develop large, two- or three-dimensional test systems with controlled high pressures to keep the scCO 2 as a liquid. Hence, an innovative approach that used surrogate fluids in place of scCO 2 and formation brine in multi-scale, synthetic aquifers test systems ranging in scales from centimeter to meter scale developed used. New modeling algorithms were developed to capture the processes controlled by the formation heterogeneity, and they were tested using the data from the laboratory test systems. The results and findings are expected to contribute toward better conceptual models, future improvements to DOE numerical codes, more accurate assessment of storage capacities, and optimized placement strategies. This report presents the experimental and modeling methods and research results.

54 ENVIRONMENTAL SCIENCES↗

Metrics for Assessment of Smart Grid Data Integrity Attacks

There is an emerging consensus that the nation’s electricity grid is vulnerable to cyber attacks. This vulnerability arises from the increasing reliance on using remote measurements, transmitting them over legacy data networks to system operators who make critical decisions based on available data. Data integrity attacks are a class of cyber attacks that involve a compromise of information that is processed by the grid operator. This information can include meter readings of injected power at remote generators, power flows on transmission lines, and relay states. These data integrity attacks have consequences only when the system operator responds to compromised data by redispatching generation under normal or contingency protocols. These consequences include (a) financial losses from sub-optimal economic dispatch to service loads, (b) robustness/resiliency losses from placing the grid at operating points that are at greater risk from contingencies, and (c) systemic losses resulting from cascading failures induced by poor operational choices. This paper is focused on understanding the connections between grid operational procedures and cyber attacks. We first offer two examples to illustrate how data integrity attacks can cause economic and physical damage by misleading operators into taking inappropriate decisions. We then focus on unobservable data integrity attacks involving power meter data. These are coordinated attacks where the compromised data are consistent with the physics of power flow, and are therefore passed by any bad data detection algorithm. We develop metrics to assess the economic impact of these attacks under re-dispatch decisions using optimal power flow methods. These metrics can be use to prioritize the adoption of appropriate countermeasures including PMU placement, encryption, hardware upgrades, and advance attack detection algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of the Number of Applied Current Meter Sensors on the Accuracy of Flow Rate Measurements across a Range of Hydroelectric Facilities Indicative of the Domestic Hydroelectric Fleet

The following paper represents the results of an investigation into the impact of the number and placement of Current Meter (CM) flow sensors on the accuracy to which they are capable of predicting the overall flow rate. Flow measurement accuracy is of particular importance in multiunit plants because it plays a pivotal role in determining the operational efficiency characteristics of each unit, allowing the operator to select the unit (or combination of units) which most efficiently meet demand. Several case studies have demonstrated that optimization of unit dispatch has the potential to increase plant efficiencies from between 1 to 4.4 percent [2] [3]. Unfortunately current industry standards do not have an established methodology to measure the flow rate through hydropower units with short converging intakes (SCI); the only direction provided is that CM sensors should be used. The most common application of CM is horizontally, along a trolley which is incrementally lowered across a measurement cross section. As such, the measurement resolution is defined horizontally and vertically by the number of CM and the number of measurement increments respectively. There has not been any published research on the role of resolution in either direction on the accuracy of flow measurement. The work below investigates the effectiveness of flow measurement in a SCI by performing a case study in which point velocity measurements were extracted from a physical plant and then used to calculate a series of reference flow distributions. These distributions were then used to perform sensitivity studies on the relation between the number of CM and the accuracy to which the flow rate was predicted. The following research uncovered that a minimum of 795 plants contain SCI, a quantity which represents roughly 12% of total domestic hydropower capacity. In regards to measurement accuracy, it was determined that accuracy ceases to increase considerably due to strict increases in vertical resolution beyond the application of 49 transects. Moreover the research uncovered that the application of 5 CM (when applied at 49 vertical transects) resulted in an average accuracy of 95.6% and the application of additional sensors resulted in a linear increase in accuracy up to 17 CM which had an average accuracy of 98.5%. Beyond 17 CM incremental increases in accuracy due to the addition of CM was found decrease exponentially. Future work that will be performed in this area will investigate the use of computational fluid dynamics to acquire a broader range of flow fields within SCI.

Flow Measurement↗

In-Situ Magnetic Field Reconstruction in the MAGIS-100 Experiment

Long-baseline atom interferometers such as the Matter-wave Atomic Gradiometer Interferometric Sensor (MAGIS-100) require stringent control and continuous characterization of background magnetic fields and spatial gradients to prevent systemic phase shifts that mimic ultralight dark matter or gravitational wave signatures. Because direct sensor placement within the ultra-high vacuum beam pipe is infeasible, in-situ magnetic field monitoring relies on external sensor arrays situated in the surrounding annular region. This work demonstrates a field reconstruction framework for a 5.3-meter MAGIS-100 modular section using finite-element Opera simulations. Transverse magnetic fields are expanded using a cylindrical multipole framework as informed by Fermilab’s Muon g-2 experiment, with magnetometer array configurations optimized via Fisher information matrix D-optimality. Inverting external sensor readings through a Gauss-Newton scheme recovers interior tube fields across distinct axial positions. In the discontinuity-averse uniform region (slice pair P4), the model achieves sub-noise-floor performance with a cross-validated root-mean-square error (RMSE) of $6.7227 \times 10^{-4}\text{ A/m}$ ($0.845\times$ sensor noise floor) and an interior field coefficient of variation of $1.71\%$. An elbow criterion in the Fisher bounds establishes $n_{\text{max}} = 2$ as the optimal multipole truncation order to prevent noise amplification from over-parameterization, with $n_{\text{max}} = 3$ (sextupole) order chosen for analysis to demonstrate further complexity and cross-pair comparison. Furthermore, analytical differentiation of the fitted multipole coefficients yields dense spatial maps of the transverse Jacobian gradient matrix $\nabla \mathbf{H}$ along with propagated $1\sigma$ uncertainty bounds across the beam region ($r \le 2.75\text{ in}$). This operational framework confirms that external magnetometer arrays can reliably monitor magnetic field uniformity and spatial gradients along the 100-meter flight path given appropriate sampling for any complexity order.

Appleby, Darwin [William Rainey Harper Coll.; Ferm↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Robotic Manipulators for Radioactive Waste Inspection - 20090

The global nuclear industry has a growing volume of nuclear waste which needs to be scanned, sorted according to its activity and material type, then processed into the correct waste packages for long term storage and disposal. It is vital that there is a detailed understanding of the waste inventory stored in long term waste containers, as knowledge of their contents could predict or prevent any adverse effects in storage. The numerous 'scan and sort' tables which are currently used at many different facilities around the world to sort waste into their correct containers are human operated and require very slow gamma scanning procedures combined with educated guesswork to manually sort the waste. This often leads to excessive conservatisms, with placement of lower activity wastes in higher activity containers, which in turn costs significantly more to store. In the United Kingdom it costs UK Pounds 46 k per cubic meter to store intermediate level waste compared to just UK Pound 2.9 k per cubic meter to store low level waste according to a 2008 Department of Energy and Climate Change report in the UK. A proposed solution to this problem, is the use of a robotic manipulator to automatically inspect the 'scan and sort table' in order to produce an accurate 3D model of the table's waste contents and attach an overlaid radiation map. The radiation map contains spectrometry data and can in consequence be used to distinguish and locate specific radioisotopes. The 3D model should be as accurate as possible in order to allow for a second robot arm with an attached gripper to grasp the objects and place them into their designated long-term storage container. Various scanning procedures are explored in this study including basic raster scanning, adaptive raster scanning and point sampling. The optimal solution will in practice be defined by the required application and activity level of the wastes being inspected. The results presented in this study indicate that it is possible to produce a centimeter accurate 3D model of a mixed assortment of components on a nuclear waste 'scan and sort' table. In addition, it was shown that the waste objects emitting radiation could be accurately identified and located, with an overlaid radiation map. This study is applicable across the nuclear waste management sector. Many of the ideas and concepts developed in this study are applicable in other decommissioning settings for example, dismantling of legacy gloveboxes or routine inspection of nuclear waste packages in storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗