Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An Orbit Plan toward AKATSUKI Venus Reencounter and Orbit Injection

On December 7, 2010, AKATSUKI, the Japanese Venus explorer reached its destination and tried to inject itself into Venus orbit. However, due to a malfunction of the propulsion system, the maneuver was interrupted and AKATSUKI again escaped out from the Venus into an interplanetary orbit. Telemetry data from AKATSUKI suggests the possibility to perform orbit maneuvers to reencounter the Venus and retry Venus orbit injection. Reported in this paper is an orbit plan investigated under this situation. The latest results reflecting the maneuvers conducted in the autumn 2011 is introduced as well.

Japanese Venus explorer↗

WARC and CCIR support for spectrum-orbit planning

Papers prepared for the use of the U.S. delegation to the 1979 World Administrative Radio Conference; papers contributed to the National CCIR study groups on broadcasting satellites and spectrum-orbit utilization; responses to specific requests for technical analyses and evaluations; and papers presented at technical conferences on related topics are presented. Nonlinear optimization methods for finding optimum positions of satellites in the fixed satellite service; the effects of geography on the use of the geostationary orbit; intercontinental orbit sharing; traffic coordination in interfering satellites operating in the fixed satellite service; and domestic fixed and broadcasting satellite systems are covered. A possible channel orbit plan for broadcasting satellite service in the U.S. and Canada; polarization for broadcasting satellite systems; and the communication capacity of the geostationary satellite orbit are also examined.

Sawitz, P. H.↗

The Last Orbit: Planning Cassini's Plummet into Saturn

Cassini’s final orbit around Saturn will culminate in a dramatic ending as the spacecraft plunges into the ringed planet’s atmosphere, never to escape or be heard from again. The last hours of the mission prior to the final loss of signal have some of the most unique and valuable science to date. Cassini will take a unique trajectory to dive deep into the atmosphere on its approach to final disposal and no spacecraft, Cassini included, has entered these depths of Saturn’s atmosphere. The science community has placed heavy emphasis onthis once-in-a-lifetime opportunity to inspect these deeper regions of Saturn’s atmosphere. The Cassini project specifically aims to collect the very last bits of data during the final plunge to get samples of the deepest regions before the spacecraft is lost forever. The desire to collect the final bits of data presents several challenges. Cassini’s Mission Planning (MP) team has developed an End of Mission (EOM) scenario to tackle these demands. The EOM scenario outlines the framework for the entire last orbit of the mission and details thestrategy for data collection and transmission. Attaining near real-time transmission is key for the acquisition of the very last bits of data. The Cassini spacecraft will use a new mode of operations to successfully achieve this real-time transmission. In addition to this primary investigation and planning for telecommunications, key risks have been studied within the realm of the last orbit. Ultimately, this paper shows how the Cassini Project plans to ensurethe return of every last bit of data before the spacecraft is consumed by Saturn forever.

Bittner, Molly E.↗

The Lunar Reconnaissance Orbiter: Plans for the Science Phase

The Lunar Reconnaissance Orbiter spacecraft (LRO), which was launched on June 18, 2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's primary objectives included the search for resources and to investigate the Lunar radiation environment. This phase of the mission was completed on September 15,2010 when the operational responsibility for LRO was transferred from ESMD to NASA's Science Mission directorate (SMD). Under SMD, the mission focuses on a new set of goals related to the history of the Moon, its current state and what its history can tell us about the evolution of the Solar System.

Vondrak, Richard R.↗

The Lunar Reconnaissance Orbiter: Plans for the Extended Science Phase

The Lunar Reconnaissance Orbiter spacecraft (LRO), launched on June 18, 2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's objectives included the search for surface resources and to investigate the Lunar radiation environment. Having marked the two-year anniversary, we will review here the major results from the LRO mission for both exploration and science and discuss plans and objectives going forward including plans for an extended science phase out to 2014.

Vondrak, R. R.↗

Planning Orbiter Flights

Shuttle Mission Design and Operations Software (SMDOS) assists in design and operation of missions involving spacecraft in low orbits around Earth by providing orbital and graphics information. SMDOS performs following five functions: display two world and two polar maps or any user-defined window 5 degrees high in latitude by 5 degrees wide in longitude in one of eight standard projections; designate Earth sites by points or polygon shapes; plot spacecraft ground track with 1-min demarcation lines; display, by means of different colors, availability of Tracking and Data Relay Satellite to Shuttle; and calculate available times and orbits to view particular site, and corresponding look angles. SMDOS written in Laboratory Micro-systems FORTH (1979 standard)

Harris, H. M.↗

The Mars Surveyor Program: Planned Orbiter and Lander for 2001

Replanning could affect the 2001 mission. The orbiter will arrive at Mars on Oct. 20, 2001, carrying the Gamma Ray Spectrometer (GRS) and the Thermal Emission Imaging System (THEMIS). The Lander is scheduled to land on Mars on January 22, 2002.

Saunders, R. S.↗

Lunar orbital mission plans.

Lunar orbital mission plans intended to optimize spacecraft procurement, flight schedules, science objectives and available funds

Allenby, R. J.↗

Low Altitude Mapping Orbit Design and Maintenance for the Dawn Discovery Mission at Vesta

NASA's Dawn discovery mission will orbit the giant asteroid Vesta beginning in the summer of 2011. Four different near polar science orbits are planned. The lowest planned orbit at Vesta is called the Low Altitude Mapping Orbit or LAMO and is by far the most challenging to design and maintain due to the strong, nonspherical gravity expected there. This paper describes the orbit selection process. The true gravity field of Vesta remains highly uncertain. The proposed orbit selection process will be applied once sufficient gravity knowledge is obtained at higher orbits. The orbit selection process is applied here to a fictitious gravity field based on a Hubble space telescope shape model for Vesta assuming uniform density. The outcome of the process described here is a variety of stable orbits. However, Initially stable orbits at the LAMO altitude are not expected to remain stable operationally due to the unpredictable impulses resulting from the Dawn spacecraft thruster firings to de-saturate its momentum wheels. As a result, orbital maintenance maneuvers will be probably be necessary. This paper also briefly describes the statistical maneuver design process that resulted in the orbit maintenance plan.

orbit stability↗

The Mars Reconnaissance Orbiter Mission Plan

This paper describes the Mars Reconnaissance Orbiter Mission Plan with emphasis on major mission activities and key challenges in mission design, spacecraft design, and science data acquisition.

Jah, Moriba↗

The Mars Reconnaissance Orbiter mission plan

This paper describes the Mars Reconnaissance Orbiter Mission Plan with emphasis on major mission activities and key challenges in mission design, spacecraft design, and science data acquisition.

Jah, Moriba↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

A synthetic environment for visualization and planning of orbital maneuvers

An interactive proximity operations planning system, which allows on-site planning of fuel-efficient, multi-burn maneuvers in a potential multi-space-craft environment has been developed and tested. This display system most directly assists planning by providing visual feedback in a synthetic virtual space that aids visualization of trajectories and their constraints. Its most significant features include (1) an 'inverse dynamics' algorithm that removes control nonlinearities facing the operator and (2) a stack-oriented action-editor that reduces the order of control and creates, through a 'geometric spreadsheet,' the illusion of an inertially stable environment. This synthetic environment provides the user with control of relevant static and dynamic properties of way-points during small orbital changes allowing independent solutions to otherwise coupled problems of orbital maneuvering.

Ellis, Stephen R.↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021. This paper will provide the original plan, requirements and restriction, and the plan changes that were made to adjust to this condition. The document will also discuss lessons learned.

flight dynamics↗