Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital optimisation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Optimisation of the Future Routine Orbit for Mars Express

Mars Express (MEX), the first planetary mission of the European Space Agency (ESA), reached Mars on December 25th 2003. Since then it is performing routine operations. Its operational phase had to cover one Martian year, with the possibility of an extension for a second Martian year (i.e. until November 2007). The end of the mission extension is approaching but, given the good health of the payload instruments and the high science return of the mission, there is a strong will to achieve further extensions. Mars Express is also seen as an important asset, capable to provide relay functions for future Martian missions. The ESA Science Program Committee has recently approved a second extension of the MEX mission until May 2009 and even further extensions are possible. Mars Express has an eccentric quasi-polar orbit with a period of approximately 6.72 hours and a pericentre height of about 300 km. Science observations are mainly performed at pericentre (but not only). In addition the orbit has a resonance of 11 revolutions per 3 Martian days. This means that ground tracks corresponding to orbits separated by 11 revolutions are adjacent, such that a given area can be covered by the on-board camera without leaving gaps. The J2 effect of Mars causes a drift of both ascending node and argument of pericentre. The drift of argument of pericentre makes it possible to observe periodically all Mars latitudes from close distance. Illumination conditions at pericentre are influenced by both the drift of the argument of pericentre and the drift of ascending node, as well as by the rotation of Mars around the Sun. The original MEX routine orbit was optimized for the duration of the nominal mission and extension, such that it produced a balanced share of day-side observations (for the optical instruments) and night-side observations (for the radar). The orbit was thus not optimized for the time beyond the assumed extension. Indeed, the evolution of the ascending node and argument of pericentre would cause in the following years a drift of the pericentre towards night-side observation conditions, hence uninteresting for the optical instruments. In order to prevent this an optimisation process for the future routine orbit has taken place. The share between day-side and night-side observations can be controlled by adjusting the drift of argument of pericentre and ascending node. This can in particular be achieved by changing the semimajor axis, eccentricity and/or inclination. A change of inclination is inefficient compared to a change in semimajor axis and eccentricity, and has therefore been discarded. An in-plane maneuvre can be performed to change both semi-major axis and eccentricity, and thus the period of the orbit. Although an apocentre manoeuvre is cheaper in terms of deltaV, it would result in raising the pericentre height, which is unfavourable for close observations. Hence a pericentre manoeuvre is proposed, which will increase the apocentre height. A repeat cycle is still required to allow mapping areas with adjacent ground tracks, so the change of semimajor axis must result in a new resonance. Resonances 18:5, 25:7 and 7:2 have been considered as potential candidates. The resulting long term evolution of the observation conditions has been analysed. Finally it has been decided to perform a change of orbit to reach the 18:5. Another aspect of the optimisation process is the control of the ground track. The previous MEX reference trajectory included regular maneuvres at every apocentre in order to adjust the orbital period, such that the separation of the ground tracks would be optimal, regardless of the latitude of pericentre. The implementation of the actual delatVs on-board was done partly by optimizing the attitude of reaction-wheel desaturation activities. Despite of it, this strategy has a significant propellant cost, because it prevents to optimize reaction wheel de-saturation activities to minimize propellant consumption. Therore, with the aim at preserving propellant resources for a long time extension it has been agreed to stop the ground-track control. This requires now a more accurate science operation planning, with improved attitude pointing control. Finally, the approach to phase Mars Express to provide back-up relay functions for NASA Phoenix landing is explained. In the context of the routine trajectory optimisation a new requirement for close fly-bys at Phobos, with different observation geometries, has been specified. The approach to fulfill this requirement is explained.

Carranza, Manuel↗

Design Optimisation and Mass Saving of the Structure of the Orion-MPCV European Service Module

This paper presents an overview of the design optimisation measures that have been proposed and analysed in order to reduce the mass of the structure, including the MMOD (Micro-Meteoroid and Orbital Debris) protection system, of the ESM (European Service Module) for the “Orion” MPCV (Multi-Purpose Crew Vehicle). Under an agreement between NASA and ESA, the NASA Orion MPCV for human space exploration missions will be powered by a European Service Module, based on the design and experience of the ATV (Automated Transfer Vehicle). The development and qualification of the European Service Module is managed and implemented by ESA. The ESM prime contractor and system design responsible is Airbus Defence and Space. Thales Alenia Space Italia is responsible for the design and integration of the ESM Structure and MMOD protection system in addition to the Thermal Control System and the Consumable Storage System. The Orion Multi-Purpose Crew Vehicle is a pressurized, crewed spacecraft that transports up to four crew members from the Earth’s surface to a nearby destination or staging point. Orion then brings the crew members safely back to the Earth’s surface at the end of the mission. Orion provides all services necessary to support the crew members while on-board for short duration missions (up to 21 days) or until they are transferred to another orbiting habitat. The ESM supports the crew module from launch through separation prior to re-entry by providing: in-space propulsion capability for orbital transfer, attitude control, and high altitude ascent aborts; water and oxygen/nitrogen needed for a habitable environment; and electrical power generation. In addition, it maintains the temperature of the vehicle's systems and components and offers space for unpressurized cargo and scientific payloads. The ESM has been designed for the first 2 Lunar orbit missions, EM-1 (Exploration mission 1) is an un-crewed flight planned around mid-2020, and EM-2, the first crewed flight, is planned in 2022. At the time where the first ESM is about to be weighted, the predicted mass lies slightly above the initial requirement. For future builds, mass reduction of the Service Module has been considered necessary. This is being investigated, together with other design improvements, in order to consolidate the ESM design and increase possible future missions beyond the first two Orion MPCV missions. The mass saving study has introduced new optimised structural concepts, optimisation of the MMOD protection shields, and optimised redesign of parts for manufacturing through AM (Additive Manufacturing).

Micro-Meteroids and Orbital Debris Protection Syst↗

Optimised radiative cooling of infrared space telescopes and applications to possible missions

Simple guidelines are presented for designing radiatively cooled space telescopes that must reach low temperatures. The limits achievable by such means are explored and secondary issues such as the on-orbit cooling time are examined. Results to date from a program of more detailed model simulations are summarized. These indicate that radiative cooling can indeed lower the temperatures of large-aperture telescopes sufficiently to make the technique of great interest for future IR space missions, while retaining advantages of size and duration, and can attain such low temperatures in quite reasonable times. Possible missions of this type are outlined, including the Edison proposal, the Japanese SMIRT survey mission, and an intermediate-size ESA/NASA mission.

Hawarden, T. G.↗

GTOC9: Methods and Results from the Jet Propulsion Laboratory Team

The removal of 123 pieces of debris from the Sunsynchronous LEO environment is accomplished by a 10-spacecraft campaign wherein the spacecraft, flying in succession over an 8-yr period, rendezvous with a series of the debris objects, delivering a de-orbit package at each one before moving on to the next object by means of impulsive manoeuvres. This was the GTOC9 problem, as posed by the European Space Agency. The methods used by the Jet Propulsion Laboratory team are described, along with the winning solution found by the team. Methods include branch-and-bound searches that exploit the natural nodal drift to compute long chains of rendezvous with debris objects, beam searches for synthesising campaigns, ant colony optimisation, and a genetic algorithm. Databases of transfers between all bodies on a fine time grid are made, containing an easyto- compute yet accurate estimate of the transfer V . Lastly, a final non-linear programming optimisation is performed to ensure the trajectories meet all the constraints and are locally optimal in initial mass.

Sims, Jon↗