Ground Winds Experienced During Artemis I Pad Stays
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
A three year program was conducted at the NASA Langley Research Center (LaRC) Aeroelasticity Branch (AB) and Transonic Dynamics Tunnel (TDT) with the primary objective to acquire scaled steady and dynamic ground-wind loads (GWL) wind-tunnel data for rollout, on-pad stay, and on-pad launch configurations for the Ares I-X Flight Test Vehicle (FTV). The experimental effort was conducted to obtain an understanding of the coupling of aerodynamic and structural characteristics that can result in large sustained wind-induced oscillations (WIO) on such a tall and slender launch vehicle and to generate a unique database for development and evaluation of analytical methods for predicting steady and dynamic GWL, especially those caused by vortex shedding, and resulting in significant WIO. This paper summarizes the wind-tunnel test program that employed two dynamically-aeroelastically scaled GWL models based on the Ares I-X Flight Test Vehicle. The first model tested, the GWL Checkout Model (CM), was a relatively simple model with a secondary objective of restoration and development of processes and methods for design, fabrication, testing, and data analysis of a representative ground wind loads model. In addition, parametric variations in surface roughness, Reynolds number, and protuberances (on/off) were investigated to determine effects on GWL characteristics. The second windtunnel model, the Ares I-X GWL Model, was significantly more complex and representative of the Ares I-X FTV and included the addition of simplified rigid geometrically-scaled models of the Kennedy Space Center (KSC) Mobile Launch Platform (MLP) and Launch Complex 39B primary structures. Steady and dynamic base bending moment as well as model response and steady and unsteady pressure data was acquired during the testing of both models. During wind-tunnel testing of each model, flow conditions (speed and azimuth) where significant WIO occurred, were identified and thoroughly investigated. Scaled data from the Ares I-X GWL model test was used in the determination of worst-case loads for the analysis of Ares I-X FTV design wind conditions. Finally, this paper includes a brief discussion of the limited full-scale GWL data acquired during the rollout and on-pad stay of the Ares I-X FTV that was launched from KSC on October 28, 2009.
The pad stay and rollout components of the Ares I-X life cycle can generate cyclic stress oscillations to the vehicle that could initiate and grow fatigue cracks from weld defects. The Ares I-X Project requested that a study be performed to determine if stabilization of the vehicle is required to reduce the stresses that could initiate and grow fatigue cracks at the flange-to-skin weld of the Command Module (CM) and Service Module (SM) interface. A fatigue crack growth analysis was conducted that used loads (LC-2) and stress analyses developed by the Ares I-X Project and utilized material data and analysis methods developed by a critical initial flaw size (CIFS) analysis conducted by NASA Engineering and Safety Center (NESC) for the Upper Stage Simulator (USS) of the Ares I-X vehicle. A full CIFS analysis for the CM-to-SM flange-to-skin weld was not performed because the full flight spectrum was not provided and was not necessary to answer the question posed by the Ares I-X Project. Instead, an approach was developed to determine if the crack growth due to the pad stay and rollout components of the flight spectrum would adversely influence the CIFS. The approach taken used a number of conservative assumptions that eliminated the need for high-fidelity analyses and additional material testing, but still provided a bounding solution for the uncertainties of the problem. The results from this analysis indicate that the LC-2 pad stay and rollout spectrum components would not produce significant fatigue crack growth on the CM-to-SM flange-to-skin weld. Thus, from a fatigue crack growth standpoint, no stabilization is required to reduce the LC-2 pad stay and rollout cyclic stresses on the CM-to-SM flange-to-skin weld.
The Manifold Integrated Pyrovalve (MI-PV) provides a state-of-the-art, low mass, low volume, normally-closed (NC) pyrotechnic isolation valve configuration which is optimized for small free-flier applications. Small scale free-flier (e.g. CubeSat) applications require high pressure fluid isolation valves with leak rates low enough to endure long pad stays, and often have severe mass and volume limitations. The MI-PV utilizes a unique configuration where the shear section and the pyrotechnic ram assembly (PRA) are installed directly into a ported gas manifold, allowing elimination of heavy fluid fittings and connections. This configuration can be readily scaled and adapted to the needs of other long duration missions.
The Prelaunch loads analysis traditionally captures the vehicle and Mobile Launcher (ML) loads associated with stacking in the Vehicle Assembly Building (VAB), rollout to the pad, and high-speed winds while out on the pad prior to liftoff. The following paper details the methodology used in this analysis for loads for the Artemis Flight Readiness assessment. This paper focuses on the stacking and assembly loads, the loads induced by fueling, and the load seen during rollout to the pad. Methods for integrating multiple structural models in dynamic simulations using interface forces, constraint modes, and residual vectors is discussed. Both linear and nonlinear responses are addressed. Simulation results are compared to measured data from the Dynamic Rollout Test (DRT) and Wet Dress Rehearsal (WDR).
Natural environments were determined for each of the Shuttle mission phases as a guide to design and operational decisions. The phases were categorized as mission planning, prelaunch, launch/ascent, booster recovery, on-orbit, and descent and landing. The wind criteria included magnitude/height, gust factors, turbulence spectra, wind shear, and vector properties for all flight and ground phases. A maximum design risk of 1 percent was permitted for the windiest two weeks the Shuttle would have to stay on the pad at either KSC or Vandenberg. The ascent wind profile was determined with the Jimsphere Vector Wind profiles, which cover the wind speeds, shears, gusts, and turbulence up to 18 km altitude. The models used to define the environmental situations of the Shuttle comprised wind, thermodynamic, space, lightning, sea state, mission analysis, and ET ice data base formulations.
Geometric modeling of aircraft during the Conceptual design phase is very different from that needed for the Preliminary or Detailed design phases. The Conceptual design phase is characterized by the rapid, multi-disciplinary analysis of many design variables by a small engineering team. The designer must walk a line between fidelity and productivity, picking tools and methods with the appropriate balance of characteristics to achieve the goals of the study, while staying within the available resources. Identifying geometric details that are important, and those that are not, is critical to making modeling and methodology choices. This is true for both the low-order analysis methods traditionally used in Conceptual design as well as the highest-order analyses available. This paper will highlight some of Conceptual design's characteristics that drive the designer s choices as well as modeling examples for several aircraft configurations using the open source version of the Vehicle Sketch Pad (Open VSP) aircraft Conceptual design geometry modeler.
This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.
Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.
Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.
Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.
Upon returning to the moon, or further a field such as Mars, presents enormous challenges in sustaining life for extended periods of time far beyond the few days the astronauts experienced on the moon during the Apollo missions. A stay on Mars is envisioned to last several months, and it would be cost prohibitive to take all the requirements for such a stay from earth. Therefore, future exploration missions will be required to be self-sufficient and utilize the resources available at the mission site to sustain human occupation. Such an exercise is currently the focus of intense research at NASA under the In-situ Resource Utilization (ISRU) program. As well as oxygen and water necessary for human life, resources for providing building materials for habitats, radiation protection, and landing/launch pads are required. All these materials can be provided by the regolith present on the surface as it contains sufficient minerals and metals oxides to meet the requirements. However, before processing, it would be cost effective if the regolith could be enriched in the mineral(s) of interest. This can be achieved by electrostatic beneficiation in which tribocharged mineral particles are separated out and the feedstock enriched or depleted as required. The results of electrostatic beneficiation of lunar simulants and actual Apollo regolith, in lunar high vacuum are reported in which various degrees of efficient particle separation and mineral enrichment up to a few hundred percent were achieved.
Kennedy Space Center, just off the east coast of Florida on Merritt Island, has been the starting place of every human space flight in NASA s history. It is where the first Americans left Earth during Project Mercury, the terrestrial departure point of the lunar-bound Apollo astronauts, as well as the last solid ground many astronauts step foot on before beginning their long stays aboard the International Space Station. It will also be the starting point for future NASA missions to the Moon and Mars and temporary host of the new Ares series rockets designed to take us there. Since the first days of the early NASA missions, in order to keep up with the demands of the intricate and critical Space Program, the launch complex - host to the large Vehicle Assembly Building, two launch pads, and myriad support facilities - has grown increasingly complex to accommodate the sophisticated technologies needed to manage today s space missions. To handle the complicated launch coordination safely, NASA found ways to automate mission-critical applications, resulting in streamlined decision-making. One of these methods, management software called the Control Monitor Unit (CMU), created in conjunction with McDonnell Douglas Space & Defense Systems, has since left NASA, and is finding its way into additional applications.
From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.
The Altair Lunar Lander is currently carrying options for both cryogenic and hypergolic ascent stage propulsion modules. The cryogenic option uses liquid methane and liquid oxygen to propel Altair from the lunar surface back to rendezvous with the Orion command module. Recent studies have determined that the liquid methane should be densified by subcooling it to 93 K in order to prevent over-pressurization of the propellant tanks during the 210 day stay on the lunar surface. A trade study has been conducted to determine the preferred method of producing; loading, and maintaining the subcooled, densified liquid methane onboard Altair from a ground operations perspective. The trade study took into account the limitations in mass for the launch vehicle and the mobile launch platform as well as the historical reliability of various components and their thermal efficiencies. Several unique problems were encountered, namely delivering a small amount of a cryogenic propellant to a flight tank that is positioned over 350 ft above the launch pad as well as generating the desired delivery temperature of the methane at 93 K which is only 2.3 K above the methane triple point of 90.7 K. Over 20 methods of subcooled liquid methane production and delivery along with the associated system architectures were investigated to determine the best solutions to the problem. The top four cryogenic processing solutions were selected for further evaluation and detailed thermal modeling. This paper describes the results of the preliminary trade analysis of the 20 plus methane densification methods considered. The results of the detailed analysis will be briefed to the Altair Project Office and their propulsion team as well as the Ground Operations Project Office before the down-select is made between cryogenic and hypergolic ascent stages in August 2010.
Electric vehicle brake rotors demand lightweight, high thermal conductivity materials with good resistance to wear, creep, salt corrosion, and thermal fade, all of which present challenges to the traditionally used cast iron. In this work, we investigated the braking performance of recently developed high-temperature aluminum alloys in both cast and 3D printed forms, that possess excellent microstructural and mechanical stability at elevated temperatures. Three aluminum alloys, Al-6Cu-Mn-Zr, Al-9Cu-Mn-Zr, and Al-Ce-Ni-Mn-Zr and a reference cast iron were tested on a sub-scale brake tester against a commercial brake pad material over a range of sliding speeds between 2 and 15 m/s. The performance of these alloys was evaluated for wear resistance, friction behavior, temperature elevation, and surface morphological change. Although all three candidate alloys had lower wear-resistance than cast iron, Al-Ce-Ni-Mn-Zr showed a significantly reduced wear rate in comparison to the Al-Cu-Mn-Zr alloys. Moreover, Al-Ce-Ni-Mn-Zr alloy had the most consistent friction behavior at all sliding speeds and good fade resistance, as the coefficient of friction did not dramatically decrease with temperature rise but stayed within a desirable range of 0.35–0.50 instead. The superior wear resistance and braking performance of the Al-Ce-Ni-Mn-Zr alloy were attributed to its higher hardness, and high temperature yield strength and creep resistance compared with the Al-Cu-Mn-Zr alloys. In conclusion, the results suggest that the braking performance of these aluminum alloys could be further enhanced by increasing the hardness and forming a more stable transfer layer on the sliding surface.
The sub-orbital rocket mission was a collaborative project between the University of New Hampshire, Cornell University, and the Jet Propulsion Laboratory (JPL) to study filamentation phenomena in the northern Auroral zone. The Enstrophy mission test flies the JPL Free-Flying Magnetometer (FFM) concept. The FFM technology development task has been funded by NASA develop miniaturized, low-power, integrated "sensorcrafts". JPL's role was to design, integrate, test, and deliver four FFMs for deployment from the sounding rocket, allowing a unique determination of curl-B. This provides a direct measurement of magnetic-field-aligned current density along the rocket trajectory. A miniaturized three-axis fluxgate magnetometer was integrated with a 4-channel 22-bit sigma-delta Analog to Digital Converter (ADC), four temperature sensors, digital control electronics, seven (Li-SOCl2) batteries, two (4 deg x 170 deg field of view) sun-sensors, a fan-shaped-beam laser diode beacon, a (16 MHz) stable Temperature Compensated Crystal Oscillator (TCXO) clock, Radio Frequency (RF) communication subsystem, and an antenna for approximately 15 minutes of operation where data was collected continuously and transmitted in three (3) bursts (approximately 26 seconds each) to ground station antennas at Poker Flat, Alaska. FFMs were stowed within two trays onboard the rocket during the rocket launch and were released simultaneously using the spinning action of the rocket at approximately 300 km altitude (approximately 100 sec. into the flight). FFMs were deployed with spin rate of approximately 17 Hz and approximately 3 m/sec linear velocity with respect to the rocket. For testing purposes while the rocket was in the launch pad and during flight prior to release of FFMs from the rocket, commands (such as "power on", "test", "flight", "power off', and clock "Reset" signal) were transmitted via a infrared Light Emitting Diode to an infrared detector in the FFM. Special attention was paid to low magnetic signature electronic design and choice of materials in packaging. The miniaturized fluxgate magnetometers had a range of 1-60000 nT with 0.1% full-scale linearity. The frequency range of interest for magnetic measurement was 10 mHz - 50 Hz. Digital data from the magnetometer's three axes were placed in a 4MB Static Random Access Memory (SRAM) in data packages (frames) formatted together with time tags and frame ID. After a specified time was elapsed, the data were Viterbi encoded and transmitted at a rate of 100 kbps (BPSK). Each of the four FFMs transmitted at different frequency. These carrier frequencies were in the range of 2200-2300 MHz. The antenna was a single patch on a high dielectric constant substrate covering one end-plate of the hockey-puck-sized unit. The local clocks aboard the FFMs were reset at the start of the mission and stayed synchronized within 3 msec during the mission. Position of each FFM with respect to the rocket is calculated by the knowledge of its release velocity (measured at exit point of the FFM launcher tract) providing an accuracy of 1 m over the maximum range of 3 km. Spatial and temporal nature of observants can be separated to within 3 m in space or 3 msec time interval.