Search NASA⌕ Search

SEARCH · Search NASA

Results for “parallel asset management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Battery asset management with cycle life prognosis

We report Battery Asset Management problem determines the minimum cost replacement schedules for each individual asset in a group of battery assets that operate in parallel. Battery cycle life varies under different operating conditions including temperature, depth of discharge (DOD), charge rate, etc., and a battery deteriorates due to usage, which cannot be handled by current asset management models. This paper presents a new battery asset management methodology where battery cycle life prognosis is integrated with parallel asset management to reduce lifecycle cost of the Battery Energy Storage Systems (BESS). For the battery failure time prognosis, a nonlinear physics-based battery capacity fade model is developed and incorporated in parallel asset management model to update battery capacity over time. Experiment results have shown that the developed battery asset management methodology can be conveniently used to facilitate BESS asset management decision making thereby decreasing asset lifecycle costs.

25 ENERGY STORAGE↗

Software Control Program For Transportable Microgrid State-of-charge Balancing And Frequency Stability Controls

A deterministic state-of-charge (SOC) balancing approach software control code is introduced as an integral secondary management to primary control layer of an islanded small microgrid or nanogrid system made up of multiple grid-forming inverter/battery/solar combination systems, where each set of batteries with each inverter are on independent DC buses (i.e. non-paralleled on the DC sides). A DERMS-level control approach, algorithm and automation controller program was developed to improve coordination and enable microgrid asset compliance and SOC balancing, enabling provision of a system-level power stability support architecture, load support, and asset scalability. The architecture is configured to treat each unit or micro/nano-grid as a node in a microgrid network, allowing for autonomous DERMS control regarding load and SOC balancing and power stability. As the network grows with the addition of units, greater coordination efforts may be required. The ideal small network microgrid ranges from 2-10 inverter/battery units before additional control parameters must be considered in the existing architecture. The control approach focuses on a deterministic state-of-charge analysis as the primary level control process followed by a secondary control loop using a forced frequency-watt droop strategy to conform off-the-shelf components into behaving under a leader-follower configuration. Adopting this control scheme has been shown to allow for a balanced, unit-coordinated microgrid network, enabling stable power flow. The deterministic state-of-charge approach is introduced as an integral primary control layer of an islanded small network microgrid. A standard strategy for SOC balancing is implementing a battery management system (BMS) to control SOC on the DC side. An alternative approach is to determine how to coordinate sending and receiving power on the AC side with multiple units. The latter approach assesses all the integrated units in the microgrid network. Once the individual units are identified, further system data is required to calculate each unit's total kWh, provided information about its capability to supply or consume kWh and availability. The secondary control layer in the multi-layered small network microgrid methodology uses the primary layer’s decision to initiate frequency setpoint changes, initializing the SOC balancing. The secondary control layer considers numerous system-dependent variables to enable a charging and discharging profile based on adjustable frequency setpoints. The combined architecture will result in stable, coordinated power flow enhancing an AC microgrid's functionalities.

Myers, KurtS [Idaho National Laboratory (INL), Ida↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Keep It Smart and Simple - Henriette - The Advanced Designed Drum Gripper for Remote Handling Tasks - 19327

A power manipulator has many applications in the handling, treatment and packaging of radioactive waste. In high radiation environments, where humans cannot work safely, a power manipulator is essential to perform difficult and heavy tasks. For more than 40 years, Waelischmiller has provided power manipulators to the nuclear market. Specifically in a high radiation nuclear environment, electrical driven manipulators are preferred. The basic design of a power manipulator is divided into the following parts: Bridge, carriage, telescopic mast and manipulator arm. All parts are customizable in length, width and capacity. The standard power manipulator version is equipped with a manipulator arm. For the nuclear waste disposal industry, there is a special need for a drum gripper. Drums are used for packing low, medium or high activated material and for storage. After packing, the drums must be handled remotely. For both tasks, a power manipulator with a drum gripper is needed. For this project KTE (Kerntechnische Entsorgung Karlsruhe GmbH) required a total refurbishment of equipment in a cell used for handling, sorting and packaging radioactive waste drums. The power manipulator was obsolete and provided low availability and through put. This cell was an essential asset in their decommissioning process and was impacting KTE's ability to meet their volume objectives. Our challenge was to develop a new system with few details from the original cell construction. The new manipulator must meet all capabilities of the old system and in addition have the ability to achieve 180 degree tilting of the drums. An additional challenge was the requirement to use the existing rails in the cell which were very close to the roof structure which required a special design. Our project, named internally Henriette, is the first of its kind. The drum gripper is based on the power manipulator A1000 series. The biggest challenges in this project were to adapt the standard components of the power manipulator to the non-standard type of gripper to have 180 deg. tilting of the drum and a handling capacity of 1200 kg in the whole working range. The new manipulator fits to the old rails and is mountable in a hot cell with restricted access and can operate with the other A1000 manipulator which is located in the cell. The result is a system with no external wiring, maintenance-free and easy to decontaminate. Other features include a 5 t auxiliary hoist on additional and parallel carriages, emergency drives for bridge and carriage, emergency drive for telescope turn movement and emergency lifting unit for telescope. A tilt and pan holder for camera on the telescope and external mechanical emergency drives on the gripper were also essential. This paper will address the complexity, challenges and engineering ingenuity required to replace very old and obsolete equipment with a state-of-the-art system within very limited physical space and within a high radiation environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗