Defining Pupil Knowledge Requirements for Roman Space Telescope Integrated Payload Assembly Testing

This thesis examines the use of phase retrieval to characterize an optical system under testing conditions with pupil knowledge error. The purpose of this investigation is to define pupil knowledge requirements for the integrated payload testing of the Roman Space Telescope. We have conducted a Monte Carlo study to determine how location uncertainty of the ground support equipment relative to the payload caused by the temperature deformation in the Space Environment Simulator will affect our ability to use image-based wavefront sensing during the test to characterize system alignment. This test will be conducted with significant wavefront error (WFE) present due to gravity sag on the primary mirror. The study incrementally decenters two pieces of ground support equipment and evaluates how the phase retrieval algorithm attempts to fit the wavefront. We conducted this investigation in two steps. First, we used an ideal optical model of the test configuration without the gravity sag on the primary mirror to see the fitting effects related only to pupil knowledge error introduced by the decentering. Then, we used perturbed and gravity sag models to investigate the effects of decentering dependent wavefront effects in addition to pupil knowledge error. The results from the ideal model provided a clear limit of the amount of pupil knowledge error that can be present before seeing significant WFE in the phase retrieval. For the second study, we used the decentering tolerances from the ideal model results to determine the WFE effects of decentering in the presence of gravity sag and system misalignments. The second part of this study will be factored into the overall integrated payload assembly testing WFE budget.

Roman Space Telescope↗

Defining Pupil Knowledge Requirements for Roman Space Telescope Integrated Payload Assembly Testing

This thesis examines the use of phase retrieval to characterize an optical system under testing conditions with pupil knowledge error. The purpose of this research is to define pupil knowledge requirements for the integrated payload testing of the Roman Space Telescope (RST). I have conducted a Monte Carlo study to determine how uncertainty in the location of the ground support equipment relative to the payload will affect the ability to use image-based wavefront sensing during the test to characterize system alignment. This test will be conducted in the Space Environment Simulator (SES) with the presence of Wavefront Error (WFE) due to gravity sag on the primary mirror. In this study, I incrementally decentered a piece of ground support equipment, the SubAperture Metrology System (SAMS), and evaluated how the phase retrieval algorithm attempted to fit the wavefront with the pupil mismatch. The results of this study are a factor in the overall Integrated Payload Assembly (IPA) testing WFE budget.

Roman Space Telescope↗

SPARCS Payload Assembly, Integration, and Test Update

The Star-Planet Activity Research CubeSat (SPARCS) is a 6U CubeSat under construction that is devoted to the photometric monitoring of M stars in the far-UV (FUV) and near-UV (NUV), to measure the time-dependent spectral slope, intensity and evolution of low-mass star high-energy radiation. We report on the progress made in the assembly, integration and test of the instrument payload at Arizona State University using a custom TVAC chamber and optical stimulus that provides calibration light sources and the custom contamination control environment that the FUV demands. The payload consists of a custom 90mm clear aperture telescope developed by Hexagon/Sigma Space, combined with a dichroic plate to separate the FUV and NUV beams developed by Teledyne Acton and Materion, married with twin focal plane array cameras separately optimized for their band passes as developed by JPL.

FUV↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modification of integrated partial payload lifting assembly

The Integrated Partial Payload Lifting Assembly (IPPLA) is currently used to transport and load experimental payloads into the cargo bay of the Space Shuttle. It is unable to carry the astronaut/passenger tunnel without a structural modification. The purpose of this design is to create a removalbe modification that will allow the IPPLA to lift and carry the passenger tunnel. Modifications evaluated were full-length insert beams which would extend through the existing strongback arms. These beam proposals were eliminated because of high cost and weight. Other proposals evaluated were attachments of cantilever beams to the existing strongback areas. The cantilever proposals reduced cost and weight compared to the full-length modifications. A third method evaluated was to simply make modifications to one side of the IPPLA therefore reducing the materials of the cantilever proposals by 40 percent. The design of the modification selected was completed with two channel beams jointly welded to a centered steel plate. The extension arm modification is inserted into the existing strongback channel beams and bolted into place. Two extension arms are added to one side of the IPPLA to provide the extra length needed to accommodate the passenger tunnel. The center counterbalance will then be offset about 20 inches to center gravity and therefore maintain horizontal status. The extension arm modification was selected because of minimum cost, low weight, and minimal installation time.

Groah, Melodie↗

Payload spin assembly for the commercial Titan launch vehicle

A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.

Robinson, Wilf↗

CH Packaging Operations Manual (Rev. 10.2)

This procedure provides instructions for assembling the following CH packaging payload Drum payload assembly Standard Waste Box (SWB) assembly Ten-Drum Overpack (TDOP) Shielded Container Assembly.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 11.0)

This procedure provides instructions for assembling the following Contact-Handled (CH) packaging payload: Drum payload assembly, Standard Waste Box (SWB) assembly, Ten-Drum Overpack (TDOP), and Shielded Container Assembly.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Skylab vibroacoustic test program

Vibroacoustic testing was performed on the orbital workshop dynamic test article and the payload assembly, the two major elements of the Skylab payload. The testing was conducted on each of the Skylab elements separately in the reverberation chamber at the Johnson Space Center. The two test configurations were high fidelity flight article simulations. The testing was conducted in two phases; in the first phase, acoustic tests were performed at levels simulating the lift-off and atmospheric flight acoustic criteria. In the second phase, low frequency sinusoidal vibration tests were conducted to obtain modal response data. The objectives of the Skylab vibroacoustic test program were to: verify the vibration design and test criteria; qualify selected flight components to the vibroacoustic criteria; and verify analytical models used for dynamic load analyses. This paper describes the vibroacoustic testing and discusses the results.

Jewell, R. E.↗

Used fuel rail shock and vibration testing options analysis

The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data that are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a cask’s internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges) on the surrogate fuel assemblies, cask and cradle structures, and the railcar so that forces and deflections that would result in the greatest potential for damage to high burnup and long-cooled UNF can be determined. For purposes of this report we consider testing on controlled track when we have control of the track and speed to facilitate modeling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A sounding rocket spectroheliometer for photometric studies at extreme ultraviolet wavelengths

Construction and mode of operation are described for a sounding rocket spectroheliometer used to establish the sensitivity of the EUV spectroheliometer on the Skylab Apollo Telescope Mount (ATM). The sounding rocket instrument was calibrated immediately before and after two flights and the calibration was transferred when the rocket and ATM instruments simultaneously measured the average intensity emitted by a quiet area of the solar disk. Descriptions are presented for the payload assembly and flight sequence, the optical system (telescope, spectrometer, and pointing reference camera), the vacuum pumping system, and the instrument electronics. Results obtained from the two flights in August and December 1973 are discussed, which included unambiguous determinations of the absolute intensity emitted by a region of the quiet solar disk over the wavelength range from 1350 to 300 A on two separate occasions and the establishment of photometric accuracy to that of laboratory calibration procedures.

Timothy, J. G.↗

A Concept for a Mobile Remote Manipulator System

A conceptual design for a Mobile Remote Manipulator System (MRMS) is presented. This concept does not require continuous rails for mobility (only guide pins at truss hardpoints) and is very compact, being only one bay square. The MRMS proposed is highly maneuverable and is able to move in any direction along the orthogonal guide pin array under complete control at all times. The proposed concept would greatly enhance the safety and operational capabilities of astronauts performing EVA functions such as structural assembly, payload transport and attachment, space station maintenance, repair or modification, and future spacecraft construction or servicing. The MRMS drive system conceptual design presented is a reasonably simple mechanical device which can be designed to exhibit high reliability. Developmentally, all components of the proposed MRMS either exist or are considered to be completely state of the art designs requiring minimal development, features which should enhance reliability and minimize costs.

Mikulus, M. M., Jr.↗

X-ray satellite

An overview of the second quarter 1985 development of the X-ray satellite project is presented. It is shown that the project is proceeding according to plan and that the projected launch date of September 9, 1987 is on schedule. An overview of the work completed and underway on the systems, subsystems, payload, assembly, ground equipment and interfaces is presented. Problem areas shown include cost increases in the area of focal instrumentation, the star sensor light scattering requirements, and postponements in the data transmission subsystems.

Source record↗

About White Sands Missile Range

Information on the White Sands Missile Range is given in viewgraph form. Navy programs, test sites, rocket programs, research rockets' booster capacity, current boost capabilities, ordnance and payload assembly areas, commercial space launch history and agreements, and lead times are among the topics covered.

Source record↗

Vented Tank Resupply Experiment (VTRE) for In-space Technology Experiment Program (IN-STEP)

An overview of the Vented Tank Resupply Experiment (VTRE) program is presented in outline and graphical form. The goal of the program is to develop, design, build and provide flight and post flight support for a Shuttle Hitchhiker Experiment to investigate and demonstrate vented tank venting in space. Program schedules and experiment subsystem schematics are presented and specific technical objectives, power requirements, payload assemblies, Hitchhiker canister integration, and orbiter mission approach are addressed.

Source record↗