Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of future energy demand increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can reduce the grid stress for improving the resilience of the grid. The integration of renewable power and storage has several significant and positive impacts including expanding the renewable energy portion of electricity generation, meeting peak-load demand, and coordinating supply and demand. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Thermal energy storage (TES) has the ability to store a large capacity of energy with improved site flexibility compared to incumbent LDES technologies (i.e., pumped hydro) and has attracted significant interest. Our development in TES technology using solid particles as the storage medium has shown feasibility and potential in serving LDES purposes. Particle TES has various advantages over commercialized molten nitrate salt TES and has emerged as a promising storage technology originating from Generation 3 concentrating solar power (CSP) development. Stable, inexpensive silica sand produced in the Midwestern U.S. was identified as a suitable storage medium and has been validated through lab heating and cycling tests. We have successfully developed particle TES for bidirectional electric energy storage to broaden the applications for TES beyond CSP technologies and into standalone electric-thermal energy storage (ETES) systems. Key component designs and performance were verified with prototype testing and model simulations. The ETES system uses high-temperature, low-cost particle thermal energy storage coupled with a unique pressurized fluidized bed heat exchanger that supports a high-efficiency, air-Brayton combined power cycle. At times of low energy demand or high renewable production, an electric particle heater heats large quantities of solid particles to high temperatures in excess of 1100 degrees C. The particles are stored in internally insulated silos. At times of high electricity demand, the hot particles are gravity-fed through the heat exchanger where stored thermal energy is transferred to the power cycle working fluid to drive the gas turbine power generation system, thereby converting the thermal energy back into electricity for the grid. The cold particles leaving the heat exchanger are returned to the storage silos by a well-insulated particle conveyor. This ETES technology using particle TES can be sited anywhere and is predicted to be economic and efficient. Moreover, this ETES technology could be co-located with a retired coal or gas plant to leverage existing power generation and grid infrastructure. Our work has focused on the development of each of the key components (e.g., the electric particle heater, particle storage silos, and the particle-to-gas pressurized fluidized bed heat exchanger) through conceptual designs, prototype testing, and computational modeling. These developments demonstrate technological feasibility and are an important step towards the next phase of development of this promising LDES technology. This presentation will show the progress in developing a pilot demonstration of the ETES system on a commercially relevant scale.

25 ENERGY STORAGE↗

Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of variable renewable power generation increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can bridge the intermittency of increasing variable renewable energy (VRE) and facilitate emission-free dispatchable electricity to improve the resilience of the grid and provide reliable and potentially cost-effective energy. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Electro-thermal energy storage (ETES) can store a large capacity of energy with site flexibility and has attracted significant interest for LDES purposes. This paper shows the progress of developing a demonstration test facility for particle ETES technology including pilot-scale component design and fabrication.

25 ENERGY STORAGE↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Full-Scale Development and Piloting of a Hybrid Digital Twin for Wastewater Operations Optimization

This full-scale pilot of a machine learning based nutrient controller/digital twin is being done as part of The Water Research Foundation (WRF) project 5121: Development of Innovative Predictive Control Strategies for Nutrient Removal. The overall goal of this project is to develop and full-scale test a hybrid (machine learning + mechanistic model) nutrient management controller at four different water resource recovery facilities (WRRFs). The controller demonstrates both short-term optimization functions and predictive capabilities. This project includes the design of the controller, its performance at the WRRFs, and a description of the future improvements.

Johnson, Bruce↗

MW-Class SOFC Pilot System Development

The overall objective of this project is to develop a low-cost, efficient, and reliable MWe-class Solid Oxide Fuel Cell (SOFC) power system towards commercial deployment in natural-gas fueled distributed generation applications. This report details the successful completion of all project objectives. The main goals of the project were to develop the conceptual design of a MWe-class SOFC power system, and to complete a techno-economic analysis (TEA) to determine system costs at low-volume production levels of >100MW per year. The combination of the BoP equipment cost and SOFC stack module factory cost provided the net fabrication cost of the selected 1MW SOFC system configuration. The results of the study showed that the cost target of less than $6000/kW is achievable for a FOAK 1MW SOFC system, exclusive of the first-time engineering cost. Also, the project included an exploratory analysis of the factory cost of next generation stack technology based on the Compact Solid-oxide Architecture (CSA) design at a high annual manufacturing rate of one-GW produced in a giga-factory. The BoP capital cost for one giga-watt power production was estimated using learning-curve analysis based on the historical manufacturing cost data related to similar high temperature Molten Carbonate fuel cell systems built by FuelCell Energy (FCE). The giga-factory manufactured SOFC cost estimate combined with the BoP cost at high production rates led to the estimation of entire system capital cost. Ultimately, a Cost of Electricity (COE) analysis was performed including natural gas fuel prices, installation and O&M costs, and stack replacement cost. The results of the techno-economic analysis were summarized by parametric estimation of COE for 1MW SOFC NOAK (Nth-of-a-Kind) system with natural gas prices as a variable parameter.

08 HYDROGEN↗

Transport Affordable Clean Hydrogen Energy via Existing Pipeline Infrastructure (CRADA 573)

Our Nation’s vast network of oil pipelines span over 230,000 miles connecting remote energy producing regions to distant markets. The COVID-19 pandemic’s influence on oil prices intensified technical and economic vulnerabilities afflicting the Trans-Alaska Pipeline System (TAPS, operating below 25% capacity) that may soon resurface as energy demand shifts to low carbon sources. Through the opportunity afforded by the Arctic Advanced Manufacturing Program, I’ve toured the great State of Alaska learning about its culture, unique energy challenges, business ecosystem, research institutions, and regulatory agencies. With encouragement and support from dedicated Alaskans and my professional mentors, I’ve founded Mighty Pipeline for the purpose of developing and commercializing proprietary technology and hardware to convert oil pipelines into clean hydrogen energy transmission systems. Leveraging the advanced technical capabilities of Pacific Northwest National Laboratory, we’ve demonstrated proof-of-concept (TRL = 3) and are seeking pre-pilot development project opportunities to conduct hardware and system level tests. If we successfully achieve technical and regulatory milestones, Mighty Pipeline’s technology could be available to help facilitate bulk clean hydrogen energy export this decade.

08 HYDROGEN↗

Combined Sorbent/WGS-based CO 2 Capture Process with Integrated Heat Management for IGCC Systems

Southern Research has developed a combined CO 2 capture water-gas shift (WGS) process for integrated gasification combined cycle (IGCC) applications. A highly efficient regenerable magnesium based sorbent was prepared to remove CO 2 . It offers high and stable CO 2 capacity with minimum requirement for temperature and pressure swings. Under optimized conditions, the sorbents achieved up to 8 mmol/g of CO 2 working capacity and remained stable over 500 cycles of adsorption and regeneration. The selected WGS process achieved 96% CO per pass conversion and remained isothermal during the test duration that lasted over 500 cycles. The approach showed potential to reduce cost of electricity (COE) compared to the baseline carbon capture approaches. The process is for bench-scale and pilot development. In a commercial embodiment, syngas from the gasifier is cooled to warm gas conditions. It then enters the CO 2 sorbent-shift reactor that uses an efficient MgO-based CO 2 sorbent and a commercial catalyst to shift the CO to CO 2 and capture 90% + of the carbon. Using a dual-bed arrangement, the sorbent is regenerated periodically by a combination of pressure and temperature swing to maintain steady state conditions and produce a 95+ % CO 2 stream for sequestration. The hydrogen rich syngas is sent to the IGCC for power production. In addition to consolidating CO 2 capture with WGS, the proposed process reduces parasitic energy losses by operating at warm gas temperatures and reduces parasitic plant load (i.e., steam and auxiliary power) by reducing energy required for regeneration. The project consisted of 3 budget periods (BP) of laboratory-scale research and testing with go/no-go decisions after BP-1 and BP-2. In the 12 month BP-1, it was shown show that one promising sorbent maintained the required CO 2 capacity and durability of >1.5 mmol/g over 100 cycles. Also based on sorbent and WGS experiments in separate reactors and combined reactor modeling, it was shown that the process had the potential to capture 90% of the CO 2 at a lower than conventional amine-based approach. In the 18 month BP-2, a lab scale combined sorbent/WGS reactor system was built, commissioned, and tested with the promising sorbent from BP-1. 90% carbon capture was demonstrated over 100 cycles and it was shown that the process continued to have potential to capture 90% of the carbon at a cost that was less than the conventional amine-based approach. In the 6 month BP-3, a long term test was conducted using the best SR sorbent. The required durability of > 2 mmol/g was demonstrated after 500 cycles. Also, 90% carbon capture and 96% CO conversion was maintained over 1000 cycles. A technical and economic feasibility study was carried out to compare the proposed pre-combustion approach to a gasification plant employing a conventional pre-combustion approach and a conventional pulverized caol (PC) plant employing a conventional post combustion CO 2 capture approach.

01 COAL, LIGNITE, AND PEAT↗

Closing the Gap: A Global Perspective [Slides]

Against the backdrop of negotiations at COP26, a group of internationally recognised research and technology organisations launched a collaboration, with the intention to identify the national and international technology-led opportunities to decarbonise fossil fuel basins globally. This study will evidence the opportunities available to players across the entire energy ecosystem. Governments and funders will be able to spread costs and investment risk, energy companies will develop a greater understanding of the global transition and possible opportunities to develop pilot projects worldwide, and there will be greater incentive to the supply chain once they are aware of the global applicability of certain technologies and technology solutions. Through the analysis and comparison of national energy systems, a number of Net Zero Deployment Strategies and Technology Priorities have been identified, that are shaping the direction of the construction of net zero integrated energy systems globally. These have been considered to design Recommendations for International Collaboration to accelerate the global energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗

Window Attachments: The Next Big Energy-Savings Measure?

Windows in residential buildings are estimated to generate 29% of all HVAC heating and cooling load, approximately 2.67 quadrillion Btu (Apte and Arasteh 2006). Although more than a third of residential windows are single pane, very few utility programs offer incentives for installation of energy-efficient windows (Bickel et al. 2013). The reason is simple: unless someone is already planning to replace their windows, the payback can often take a decade, if not longer. Preliminary data indicates that some energy-efficient window attachments, such as low- emissivity (low-e) storm windows and interior panels, cellular shades, interior and exterior roller shades and shutters, window films, solar screens, window quilts, and awnings, can deliver cost-effective energy savings. Additionally, the means to reliably identify and compare energy-efficient window attachment products will soon be available through the Attachment Energy Rating Council (AERC), a public interest energy performance rating and certification organization co-funded by the U.S. Department of Energy (DOE) and the window attachment industry. This paper presents, for the first time, national and regional energy savings estimates for cellular shades and low-emissivity storm windows and panels using existing data on household energy savings potential. This paper is an early step in the process of determining the cost-effectiveness of window attachments for utility programs. The next step is for utilities to develop pilot programs to conduct field tests of these products, which will generate the energy savings data to determine if full-scale programs are cost-effective.

Bickel, Stephen↗

Development of a medium-duty stoichiometric diesel micro-pilot natural gas engine

Fueling a compression-ignition engine with premixed natural gas offers the potential to combine a clean-burning, low-carbon fuel with a high compression ratio, high-efficiency engine. This work describes the development of a multi-cylinder 6.7 L diesel engine converted to run stoichiometric diesel micro-pilot/ natural gas premix combustion with a maximum diesel contribution target of 5% of the total fuel energy and a three-way catalyst aftertreatment system. Results are given by comparing the stoichiometric combustion to the diesel baseline operation, showing combustion characteristics differences, including the rapid two stage heat release. A high load output of 23 bar brake mean effective pressure was obtained with diesel-like brake thermal efficiency of 41%. This operating condition enabled a brake specific CO 2 emissions reduction of up to 25% when compared to diesel. It was observed that the low load output is limited by combustion stability when operated at stoichiometric condition. The three-way catalyst is observed to run at peak efficiency with an equivalence ratio of 1.01. Injector fouling was observed through the inspection of the nozzle and its internal parts, indicating carbon build-up similar to that seen in injector coking mechanisms. A comparison of the developed engine to other engine technologies is given, showing that the diesel micro-pilot natural gas engine performance is in good standing among other diesel and gas engines in the market.

Engineering↗

Large Area Picosecond Photodetector (LAPPD TM ) - Pilot production and development status

Here, we discuss performance results achieved for fully functional sealed Large Area Picosecond Photodetectors (LAPPD (TM)) in tests performed at Incom Inc., as well as independent test results reported by our early adopters. The LAPPD is a microchannel plate (MCP) based large area picosecond photodetector, capable of imaging with single-photon sensitivity at high spatial and temporal resolutions in a hermetic package. The LAPPD has an active area of 350 square centimeters in an all-glass hermetic package with a fused silica window and bottom plate and sidewalls made of borosilicate float glass. Signals are generated by a bi-alkali Na 2 KSb photocathode and amplified with a stacked chevron pair of MCPs produced by applying resistive and emissive atomic layer deposition coatings to glass capillary array (GCA) substrates. Signals are collected on RF stripline anodes applied to the bottom plates which exit the detector via pin-free hermetic seals under the side walls. LAPPD test and performance results for product produced and delivered to early adopter customers during the first half of 2018 are reviewed. These results include electron gains ≥ 7.5 x 10 6 @ 850/950 V (entry/exit MCP), low dark noise rates (22 Cts/s/cm 2 ), single photoelectron (PE) timing resolution of 64 picoseconds RMS, and single photoelectron spatial resolution along and across strips of 2.8 mm and 1.3 mm RMS respectively. Many of these devices also had very high QE photocathodes that were uniform over the full 195 mm x 195 mm window active area (LAPPD #15 QE% @ 365 nm Max/Avg/Min = 25.8/22.3 ± 3/15.7). An update is additionally provided of developments that enable capacitive signal coupling from the detector to application specific pads or stripline readout patterns deployed on printed circuit boards positioned beneath the file, outside of the vacuum package. We conclude with examples of how sensors offering picosecond timing, in diverse applications can bring transformative change to detector technology and applications in future experiments.

47 OTHER INSTRUMENTATION↗

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-on Criticality Safety Training Courses

In 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗