First Wall Design of a Tokamak Pilot Plant Using a Monte Carlo Model for 3-D Heat Flux Deposition

We present a method for calculating the heat fluxes deposited on nonaxisymmetric tokamak first wall components, allowing for a first-of-its-kind model for power handling in the tokamak far scrape-off layer (SOL). The DIV3D Monte Carlo model features strict global power conservation and can calculate the finite cross-field plasma transport into magnetically-shadowed regions, which is significant when dealing with meter-scale shadows introduced by components such as poloidal limiters or antennas. As a case study, we apply the DIV3D model to inform the distribution of first wall poloidal limiters in an ARC-class reactor device. We demonstrate that discrete protection limiters can efficiently reduce peak heat fluxes on recessed breeder wall components in the presence of significant far-SOL plasma fluxes. By varying the toroidal periodicity and radial standoff depth of the limiters, we demonstrate one of the tradeoffs that must be considered in first wall design: more limiters provide greater protection, but at the cost of reduced breeding performance. We also present the impact that radial misalignments between limiters would have on first wall power loading.

Monte Carlo methods

Lessons learned from the development and implementation of a workforce training curriculum for advanced controls for high performance HVAC systems

Over the past decade, academic research on advanced controls has slowly transitioned into new software platforms, giving rise to various companies developing and deploying these innovative products, including solutions for light commercial HVAC systems. However, the current workforce remains widely unprepared to install, maintain and operate these systems, particularly complex software-based control platforms, as most workforce training programs still focus on traditional building automation for large commercial buildings. This paper presents the development and piloting of curriculum for three key types of professionals: ● Technicians (trade-level): installing and maintaining modern high-performance HVAC systems and controls ● Programmers (undergrad-level): developing and implementing advanced controls ● Engineers and energy professionals (undergrad/grad-level): managing and evaluating system performance We share details of the material developed including training videos, open-source software, instruction manuals. We also present the results of a pilot implementation of the training materials with real students.

Casillas, Armando

RG-CAT: Detection pipeline and catalogue of radio galaxies in the EMU pilot survey

Abstract We present source detection and catalogue construction pipelines to build the first catalogue of radio galaxies from the 270$\rm deg^2$pilot survey of the Evolutionary Map of the Universe (EMU-PS) conducted with the Australian Square Kilometre Array Pathfinder (ASKAP) telescope. The detection pipeline uses Gal-DINO computer vision networks (Gupta et al. 2024, PASA, 41, e001) to predict the categories of radio morphology and bounding boxes for radio sources, as well as their potential infrared host positions. The Gal-DINO network is trained and evaluated on approximately 5 000 visually inspected radio galaxies and their infrared hosts, encompassing both compact and extended radio morphologies. We find that the Intersection over Union (IoU) for the predicted and ground-truth bounding boxes is larger than 0.5 for 99% of the radio sources, and 98% of predicted host positions are within$3^{\prime \prime}$of the ground-truth infrared host in the evaluation set. The catalogue construction pipeline uses the predictions of the trained network on the radio and infrared image cutouts based on the catalogue of radio components identified using theSelavysource finder algorithm. Confidence scores of the predictions are then used to prioritiseSelavycomponents with higher scores and incorporate them first into the catalogue. This results in identifications for a total of 211 625 radio sources, with 201 211 classified as compact and unresolved. The remaining 10 414 are categorised as extended radio morphologies, including 582 FR-I, 5 602 FR-II, 1 494 FR-x (uncertain whether FR-I or FR-II), 2 375 R (single-peak resolved) radio galaxies, and 361 with peculiar and other rare morphologies. Each source in the catalogue includes a confidence score. We cross-match the radio sources in the catalogue with the infrared and optical catalogues, finding infrared cross-matches for 73% and photometric redshifts for 36% of the radio galaxies. The EMU-PS catalogue and the detection pipelines presented here will be used towards constructing catalogues for the main EMU survey covering the full southern sky.

Astronomy & Astrophysics

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Battery Material Synthesis and Scalability using a 50L Taylor Vortex Reactor (Final CRADA Report)

Under this agreement, Laminar will loan Argonne a 50L Taylor Vortex Reactor (TVR) and provide mechanical troubleshooting guidance and consulting to ensure the successful setup of the pilot-scale synthesis process. The U.S. Department of Energy (DOE) will allocate funding for the labor and materials required for the study. To evaluate the physical and electrochemical properties of the materials produced by the 50L TVR, Argonne will perform comprehensive characterizations, including XRD, SEM, PSA, ICP, tap density, and coin half-cell testing. Throughout the collaboration, Argonne will provide feedback and recommendations for mechanical improvements to the reactor system. Furthermore, Argonne will credit Laminar as a collaborator in any presentations or publications resulting from data generated by the system. Laminar will retain no rights to experimental results or intellectual property generated through the experiments conducted with the 50L TVR at Argonne.

25 ENERGY STORAGE

Justification that the Thermo-Fisher Scientific 241 Am Residues Were Generated by Atomic Energy Defense Activities

The Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA) as amended by the National Defense Authorization Act for Fiscal Year 1997 (1) requires that for Transuranic (TRU) waste to be eligible for disposal at WIPP, it must have been generated by atomic energy defense activities. The definition of “atomic energy defense activity” is defined in the Nuclear Waste Policy Act of 1982 (NWPA) (2).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Fluidized Bed Gasification For Conversion of Biomass and Waste Materials to Renewable Hydrogen

This project was undertaken in order to study the potential for hydrogen production, at low cost, from mixtures of biomass and municipal solid waste (MSW). This approach allows for the production of hydrogen with a very low fossil carbon burden, while taking advantage of tipping fees (associated with MSW) to improved process economics. The team sourced three primary feedstocks (wood, MSW, and waste plastics) and characterized them comprehensively using established techniques with a long track record in the field of gasification. All three primary feedstocks were highly reactive and lost most of their mass during initial devolatilization. The production of tars, including heavy tars, was quite high, and was most problematic in the case of the MSW and Waste Plastics feedstocks. Little practical difference was identified between the MSW and Waste Plastics materials, and the addition of bed-forming materials (dolomite and brown alumina) to the feedstocks was found to reduce production of tars during devolatilization under thermogravimetric analysis and/or Fischer Assay conditions. A series of four tests in a lab-scale bubbling-fluidized-bed gasifier, at 50 psig of pressure and about 825 C, confirmed these findings. Pellet feedstocks, broken into fragments, were used for these tests, and pellets comprised of 50% MSW and 50% biomass were found to be the best option in terms of fossil carbon burden, economic potential, and gasification characteristics. Tests were then undertaken in a pilot-scale gasifier facility based on the GTI U-Gas fluidized-bed gasification technology. The feedstock handling train of the 20 TPD U-Gas pilot-scale gasifier located in Des Plaines, IL, was operated under simulated gasification conditions, and the 50/50 pellets were found to be very robust and unproblematic. An improved design for the forward end of the feedstock injection screw of the gasifier was developed and installed. The design approach was based on improved passive cooling of the front-most shroud at the end of the screw, since this approach was found in comprehensive modeling studies to be more than sufficient to accomplish the project objectives associated with this phase of the work, while also avoiding thermal gradients that could have caused heat-stress-induced damage to the refractory around the feedstock inlet if an active cooling approach had been applied. Careful technoeconomic analysis (TEA) of two possible 1000 TPD facilities was carried out. The TEA of conversion of MSW with corn stover in one case, and MSW with woody feedstock in the other case, showed that both had the potential to provide hydrogen at about $1/kg (minimum selling price, 2018 dollar basis). Of the two TEA cases, the one that was based on the conversion of wood in the southeastern USA was found to have slightly better economic potential. The other TEA case was based on a real location in Nebraska and called for corn stover feedstock conversion along with MSW. An underserved communities outreach program plan was developed in cooperation with personnel from the Nebraska Public Power District.

08 HYDROGEN

The first high-redshift cavity power measurements of cool-core galaxy clusters with the International LOFAR Telescope

Radio-mode feedback associated with the active galactic nuclei (AGNs) at the cores of galaxy clusters injects a large amount of energy into the intracluster medium (ICM), offsetting radiative losses through X-ray emission. This mechanism prevents the ICM from rapidly cooling down and fueling extreme starburst activity as it accretes onto the central galaxies, and it is therefore a key ingredient in the evolution of galaxy clusters. However, the influence and mode of feedback at high redshifts (z ∼ 1) remains largely unknown. Low-frequency sub-arcsecond-resolution radio observations taken with the International LOFAR Telescope have demonstrated their ability to assist X-ray observations with constraining the energy output from the AGNs (or “cavity power”) in galaxy clusters, thereby enabling research at higher redshifts than before. In this pilot project, we tested this hybrid method on a high-redshift (0.6 < z < 1.3) sample of 13 galaxy clusters for the first time with the aim of verifying the performance of this method at these redshifts and providing the first estimates of the cavity power associated with the central AGN for a sample of distant clusters. We were able to detect clear radio lobes in three out of 13 galaxy clusters at redshifts of 0.7 < z < 0.9, and we used these detections in combination with ICM pressures surrounding the radio lobes obtained from standard profiles to calculate the corresponding cavity powers of the AGNs. Combining our results with the literature, the current data appear to suggest that the average cavity power peaked at a redshift ofz ∼ 0.4 and slowly decreases toward higher redshifts. However, we require more and tighter constraints on the cavity volume and a better understanding of our observational systematics to confirm any deviation of the cavity power trend from a constant level.

Astronomy & Astrophysics

Innovations Driven by Advanced Characterization to Strategize Critical Mineral Production and Beneficial Reuse from Fossil Energy Waste

Critical minerals (CM), such as rare earth elements (REE), cobalt, nickel, and lithium, have important uses in modern electronics and advanced manufacturing, yet are vulnerable to potential supply chain disruptions. Relatively abundant and readily available fossil energy (FE) wastes, such as coal combustion ash, acid mine drainage (AMD) and treatment solids (AMD solids), and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters) are under consideration as CM feedstocks. The National Energy Technology Laboratory (NETL) has studied CM resources for various FE wastes as part of the U.S. Department of Energy’s mission of bolstering the domestic CM supply, and makes the data available to the public on EDX at sites such as the NEWTS group. Advanced characterization utilizing synchrotron x-ray techniques coupled with laboratory extractions has been performed to identify CM hosting phases in these FE wastes to inform CM recoverability mechanisms. Novel methods to selectively recover CMs while co-producing other valuable byproducts have been developed. Successful examples discussed here include: (1) The identification of REE/Co/Ni/Sc binding and hosting phases in select FE waste (coal combustion ash and AMD solids), resulting in the development of a patented CM step-extraction process, (2) coupled production of functional sorbents from these extraction wastes and for CM recovery. A pilot-scale testing to evaluate the patent’s technical feasibility for extracting REE from coal ash on a barrel scale has been successfully performed. Additionally, (3) evaluation and measurements of brine geochemistry from U.S. O&G produced waters has informed a high Li recovery potential from Marcellus Shale produced water. NETL researchers have been developing tailored pre-treatment processes, an innovative and highly durable lithium sorbent, and geochemical model guided precipitation to accelerate Li production from the Marcellus Shale produced waters. These innovations driven by characterization are integral for maximizing and advancing the potential for CM recovery while offsetting the cost and environmental footprint for FE waste management.

critical mineral processing

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

Wetter, Michael [Lawrence Berkeley National Labora

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1