Search NASA⌕ Search

SEARCH · Search NASA

Results for “pit disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

RADIOLOGICAL SURVEY STATION DEVELOPMENT FOR THE PIT DISASSEMBLY AND CONVERSION PROJECT

The Savannah River National Laboratory (SRNL) has developed prototype equipment to demonstrate remote surveying of Inner and Outer DOE Standard 3013 containers for fixed and transferable contamination in accordance with DOE Standard 3013 and 10 CFR 835 Appendix B. When fully developed the equipment will be part of a larger suite of equipment used to package material in accordance with DOE Standard 3013 at the Pit Disassembly and Conversion Project slated for installation at the Savannah River Site. The prototype system consists of a small six-axis industrial robot with an end effector consisting of a force sensor, vacuum gripper and a three fingered pneumatic gripper. The work cell also contains two alpha survey instruments, swipes, swipe dispenser, and other ancillary equipment. An external controller interfaces with the robot controller, survey instruments and other ancillary equipment to control the overall process. SRNL is developing automated equipment for the Pit Disassembly and Conversion (PDC) Project that is slated for the Savannah River Site (SRS). The equipment being developed is automated packaging equipment for packaging plutonium bearing materials in accordance with DOE-STD-3013-2004. The subject of this paper is the development of a prototype Radiological Survey Station (RSS). Other automated equipment being developed for the PDC includes the Bagless transfer System, Outer Can Welder, Gantry Robot System (GRS) and Leak Test Station. The purpose of the RSS is to perform a frisk and swipe of the DOE Standard 3013 Container (either inner can or outer can) to check for fixed and transferable contamination. This is required to verify that the contamination levels are within the limits specified in DOE-STD-3013-2004 and 10 CFR 835, Appendix D. The surface contamination limit for the 3013 Outer Can (OC) is 500 dpm/100 cm2 (total) and 20 dpm/100 cm2 (transferable). This paper will concentrate on the RSS developments for the 3013 OC but the system for the 3013 Inner Can (IC) is nearly identical.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pit Disassembly and Processing/Oxidation Capacity (PDP) for Disposition of Surplus Plutonium at Los Alamos (FY2021 Workshop 1) [Slides]

This workshop will establish NNSA/LANL consensus on the planning basis for: updating the 2017 Life Cycle Cost Estimate (LCCE) pre-conceptual estimate by identifying the specific scope elements that will be included; identifying the specific scope elements that will be included in the Line Item project; and identifying the preliminary agenda items for the next PDP workshop.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancements in Glovebox Design Resulting from Laboratory-Conducted FIre Tests

The primary mission of the Pit Disassembly and Conversion Facility (PDCF) Project was to disassemble nuclear weapons pits and convert the resulting special nuclear materials to a form suitable for further disposition. Because of the nature of materials involved, the fundamental system which allowed PDCF to perform its mission was a series of integrated and interconnected gloveboxes which provided confinement and containment of the radioactive materials being processed. The high throughput planned for PDCF and the relatively high neutron and gamma radiation levels of the pits required that gloveboxes be shielded to meet worker dose limits. The glovebox shielding material was required to contain high hydrogen concentrations which typically result in these materials being combustible. High combustible loadings created design challenges for the facility fire suppression and ventilation system design. Combustible loading estimates for the PDCF Plutonium (Pu) Processing Building increased significantly due to these shielding requirements. As a result, the estimates of combustible loading substantially exceeded values used to support fire and facility safety analyses. To ensure a valid basis for combustible loading contributed by the glovebox system, the PDCF Project funded a series of fire tests conducted by the Southwest Research Institute on door panels and a representative glovebox containing Water Extended Polyester (WEP) radiological shielding to observe their behavior during a fire event. Improvements to PDCF glovebox designs were implemented based on lessons learned during the fire test. In particular, methods were developed to provide high levels of neutron shielding while maintaining combustible loading in the glovebox shells at low levels. Additionally, the fire test results led to design modifications to mitigate pressure increases observed during the fire test in order to maintain the integrity of the WEP cladding. These changes resulted in significantly reducing the credited combustible loading of the facility. These advances in glovebox design should be considered for application in nuclear facilities within the Department of Energy complex in the future.

Brooks, Kriston P.↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (Final Report)

Based on conclusions of a recent pit disassembly and conversion (PDC) Alternatives Study, the plutonium facility at Los Alamos (TA-55-4, “PF-4”) may be a viable location for converting pits into a feed material for making mixed oxide fuel rods at Savannah River Site (SRS). The alternatives study was separate from the on-going effort to develop a Supplemental Environmental Impact Statement (SEIS) for Surplus Plutonium Disposition (SPD). The National Nuclear Security Administration (NNSA) has decided to include the Los Alamos option in the National Environmental Policy Act (NEPA) analysis. An NNSA memorandum “Data Call to Support the Surplus Plutonium Disposition Supplemental Environmental Impact Statement” received on October 26, 2011 directed Los Alamos to gather data in support of this effort.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

ARIES Oxide Production Program at LANL

Disassemble pits from stockpile-return units identified as excess by NA-23 and convert metal to oxide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARIES Blend Lot Book Data Analysis

The Advanced Recovery Integrated Extraction System (ARIES) Program being executed at Los Alamos TA-55 produces unpolished plutonium oxide powder from pit disassembly in batches of material referred to as a blend lot. Each blend lot is sampled and analyzed by Los Alamos group C-AAC (Chemistry Division, Actinide Analytical Chemistry Group) for radioactive and nonradioactive constituents contained in the material. A blend lot, which nominally consists of 12 kg(Pu), is then packaged into three DOE-STD-3013 containers that are analyzed by nondestructive analysis (NDA) to determine the fraction and total amount of plutonium mass relative to impure plutonium oxide. The analytical and NDA data are presented in a Blend Lot Book (BLB). The data are used to confirm that a blend lot grouping of three cans meets the requirements for off-site shipment specified in the formal interface control document (ICD). The analytical and NDA data from 49 blend lots were reviewed to provide summary-level information on the constituents present in the blend lots. The results provide an overall perspective in historical amounts for constituent averages over all blend lots and similar information in the variation between constituent levels. Note that to properly compare the can contents, it would be most appropriate to decay all of cans’ constituents to a particular date. Previously, this analysis only examined statistical data as determined at the time of blend lot chemical analysis. The chemical analysis dates span the period from June 2011 to May 2015 (4 years), which is 28% of one Pu-241 half-life. Therefore, the approximate nature of the aggregate information must be properly understood in this light. However, to address this issue, a new table is included in this revision that decays the 48 blend lots to a single date.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Uranium Disposition Efforts at Los Alamos National Laboratory

Summary: Doing uranium work in a plutonium facility has challenges: NDA is geared to plutonium, Pu contamination, DU discards. The future volume of the feed stream to UED is dependent on pit disassembly. The dilute and dispose Pu disposition option will cause the HEU stream to grow significantly. Shipping HEU metal directly to Y-12 is a long term goal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

THERMAL PERFORMANCE ANALYSIS FOR WSB DRUM

The Nuclear Nonproliferation Programs Design Authority is in the design stage of the Waste Solidification Building (WSB) for the treatment and solidification of the radioactive liquid waste streams generated by the Pit Disassembly and Conversion Facility (PDCF) and Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The waste streams will be mixed with a cementitious dry mix in a 55-gallon waste container. Savannah River National Laboratory (SRNL) has been performing the testing and evaluations to support technical decisions for the WSB. Engineering Modeling & Simulation Group was requested to evaluate the thermal performance of the 55-gallon drum containing hydration heat source associated with the current baseline cement waste form. A transient axi-symmetric heat transfer model for the drum partially filled with waste form cement has been developed and heat transfer calculations performed for the baseline design configurations. For this case, 65 percent of the drum volume was assumed to be filled with the waste form, which has transient hydration heat source, as one of the baseline conditions. A series of modeling calculations has been performed using a computational heat transfer approach. The baseline modeling results show that the time to reach the maximum temperature of the 65 percent filled drum is about 32 hours when a 43 C initial cement temperature is assumed to be cooled by natural convection with 27 C external air. In addition, the results computed by the present model were compared with analytical solutions. The modeling results will be benchmarked against the prototypic test results. The verified model will be used for the evaluation of the thermal performance for the WSB drum.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JOWOG 22/2 - Actinide Chemical Technology (July 9-13, 2012)

The Plutonium Science and Manufacturing Directorate provides world-class, safe, secure, and reliable special nuclear material research, process development, technology demonstration, and manufacturing capabilities that support the nation's defense, energy, and environmental needs. We safely and efficiently process plutonium, uranium, and other actinide materials to meet national program requirements, while expanding the scientific and engineering basis of nuclear weapons-based manufacturing, and while producing the next generation of nuclear engineers and scientists. Actinide Process Chemistry (NCO-2) safely and efficiently processes plutonium and other actinide compounds to meet the nation's nuclear defense program needs. All of our processing activities are done in a world class and highly regulated nuclear facility. NCO-2's plutonium processing activities consist of direct oxide reduction, metal chlorination, americium extraction, and electrorefining. In addition, NCO-2 uses hydrochloric and nitric acid dissolutions for both plutonium processing and reduction of hazardous components in the waste streams. Finally, NCO-2 is a key team member in the processing of plutonium oxide from disassembled pits and the subsequent stabilization of plutonium oxide for safe and stable long-term storage.

36 MATERIALS SCIENCE↗

HEAT TRANSFER ANALYSIS FOR NUCLEAR WASTE SOLIDIFICATION CONTAINER

The Nuclear Nonproliferation Programs Design Authority is in the design stage of the Waste Solidification Building (WSB) for the treatment and solidification of the radioactive liquid waste streams generated by the Pit Disassembly and Conversion Facility (PDCF) and Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The waste streams will be mixed with a cementitious dry mix in a 55-gallon waste container. Savannah River National Laboratory (SRNL) has been performing the testing and evaluations to support technical decisions for the WSB. Engineering Modeling & Simulation Group was requested to evaluate the thermal performance of the 55-gallon drum containing hydration heat source associated with the current baseline cement waste form. A transient axi-symmetric heat transfer model for the drum partially filled with waste form cement has been developed and heat transfer calculations performed for the baseline design configurations. For this case, 65 percent of the drum volume was assumed to be filled with the waste form, which has transient hydration heat source, as one of the baseline conditions. A series of modeling calculations has been performed using a computational heat transfer approach. The baseline modeling results show that the time to reach the maximum temperature of the 65 percent filled drum is about 32 hours when a 43 C initial cement temperature is assumed to be cooled by natural convection with 27 C external air. In addition, the results computed by the present model were compared with analytical solutions. The modeling results will be benchmarked against the prototypic test results. The verified model will be used for the evaluation of the thermal performance for the WSB drum. Detailed results and the cases considered in the calculations will be discussed here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oxide production program monthly report - December 2014

A summary of the major activities, accomplishments, milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program for the month of December 2014 is presented in this Executive Summary.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALDWP Operational Highlights 2021

The Weapons Pit production manufacturing team completed pit build 21-1 assembly operations on December 23, 2020. This build utilized all essential flow sheet steps and included the second -01 long tube cut off extension and welding activity. This is the best build produced in the MC4597-01 pit program to date. Final out-of-line operations, non-destructive evaluation, and radiography was completed during the week of January 4. Depending on the results from high energy radiography, this pit will be considered to be a candidate for CERT-02 and shipment to Lawrence Livermore National Laboratory in support of pit certification. It is notable that this build was completed while concurrently making Plutonium (Pu) metal, producing additional castings, machining Pu parts for Build 22, completing disassembly of two pits, supporting Nightshade B Pu target characterization, and precision machining of Jasper certification base plates.

42 ENGINEERING↗

Los Alamos National Laboratory W76 Pit Tube Lifetime Study

A metallurgical study was requested as part of the Los Alamos National Laboratory (LANL) W76-1 life-extension program (LEP) involving a lifetime analysis of type 304 stainless steel pit tubes subject to repeat bending loads during assembly and disassembly operations at BWXT/Pantex. This initial test phase was completed during the calendar years of 2004-2006 and the report not issued until additional recommended tests could be performed. These tests have not been funded to this date and therefore this report is considered final. Tubes were reportedly fabricated according to Rocky Flats specification P14548 - Seamless Type 304 VIM/VAR Stainless Steel Tubing. Tube diameter was specified as 0.125 inches and wall thickness as 0.028 inches. A heat treat condition is not specified and the hardness range specification can be characteristic of both 1/8 and 1/4 hard conditions. Properties of all tubes tested were within specification. Metallographic analysis could not conclusively determine a specified limit to number of bends allowable. A statistical analysis suggests a range of 5-7 bends with a 99.95% confidence limit. See the 'Statistical Analysis' section of this report. The initial phase of this study involved two separate sets of test specimens. The first group was part of an investigation originating in the ESA-GTS [now Gas Transfer Systems (W-7) Group]. After the bend cycle test parameters were chosen (all three required bends subjected to the same amount of bend cycles) and the tubes bent, the investigation was transferred to Terri Abeln (Metallurgical Science and Engineering) for analysis. Subsequently, another limited quantity of tubes became available for testing and were cycled with the same bending fixture, but with different test parameters determined by T. Abeln.

36 MATERIALS SCIENCE↗