Search NASA⌕ Search

SEARCH · Search NASA

Results for “plan review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Towards Risk-Informed Performance-Based Emergency Planning: Review of Regulation, Guidance, and Methods

At a fundamental level, nuclear facility safety is built upon the concept of defense-in-depth (DID), which entails multiple, independent layers of protection for public health and safety. Within the DID structure, emergency preparedness (EP) is the last layer of defense and provides reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. Over several decades, the EP regulatory framework has evolved in response to lessons learned from actual events, experience with maintaining and testing EP capabilities, and advances in a wide range of technologies. Furthering this evolution, recent developments in risk-informed performance-based (RIPB) design and licensing approaches provide an opportunity to leverage insights regarding the attributes of the specific facility and site to inform EP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Workforce planning: a review of methodologies

Workforce planning deals with determining the number of employees and associated skills necessary to meet the future operational needs of an organization. A workforce system consists of six elements: recruitment, attrition, promotion, training, retention, and scheduling. Historically, several workforce modeling and analysis methodologies have been developed to capture these elements. This paper reviews the results of workforce and manpower models published within peer-reviewed literature between 1959 and 2021 to provide an in-depth analysis of current models. The focus of this review is on analytical, simulation, and empirical models found in literature that were collected based on a citation requirement and keyword search criteria. Results demonstrate the trends in workforce modeling research and discuss the common uses of each model type and the advantages/disadvantages related to each model. Based on the common attributes of workforce systems, the discussion focuses on the most frequently used model type for each element and the best use for each model. Lastly, recommendations are made for the development of workforce models that allow the most comprehensive view of the workforce systems of the future.

42 ENGINEERING↗

Recovery of Zr from ZrCl 4 by Electrolysis in Fused Salts and Ionic Liquids: Literature Review and Test Plan

This report reviewed the current status on the research and development of Zr electrodeposition in high temperature molten salts and room temperature ionic liquids from ZrCl 4 , which is the product of the chlorination process developed for recycling the Zr claddings of the spent nuclear fuels. Due to the pyrophoricity issue, the Zr metal product from the electrodeposition process is desired to be of coarse, dense crystalline or plates (instead of powder or loose, fine crystals) that are not to be easily oxidized. The findings based on the literature review are included in the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

5 Easy Steps to SolarAPP+ Adoption

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.

automated permitting↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Neutron Absorber Plate Characterization Plan for Criticality Experiments Design

After being used in nuclear installations, depleted fuel can still be highly reactive and must be handled securely to prevent any radiological or criticality concerns. In particular, spent fuel from use in nuclear power reactors must be stored and transported in specifically designed containers using neutron absorber materials to prevent criticality. Various neutron absorber material types exist and are manufactured by various entities, as thoroughly described in the Handbook of Neutron Absorber Materials for Spent Nuclear Fuel Storage and Transportation Applications written by EPRI. Presently, one of the most modern and most widely used types of neutron absorber material contains particles of boron carbide, or B 4 C, embedded in aluminum matrix: Boralcan, manufactured by Rio Tinto. It is very important for the community to know as much as possible about such neutron absorber materials. Therefore, in the recent years, a US Department of Energy National Nuclear Security Administration–Nuclear Criticality Safety Program funded project initiated design of an experiment that places Boralcan neutron-absorbing plates in an established critical assembly using low-enriched uranium fuel at the Sandia Pulsed Reactor Facility/Critical Experiments (SPRF/CX) apparatus at Sandia National Laboratories. The goal of the experiment is to produce high-quality benchmark data to submit to the International Criticality Safety Benchmark Evaluation Project (ICSBEP), for use in validating calculational tools and nuclear data by criticality safety analysts. The project, named IER-554, is currently in its final design stage, following a successful preliminary design. In the work documented in the design study, ten critical configurations using Boralcan neutron absorber plates were designed, and the experiment was proven to be feasible, with a predicted low k eff uncertainty around 100 pcm. An overview of the modeled cutout of the critical assembly with a Boralcan plate is shown in Figure 1, representing one of the configurations planned for the critical experiments. Before the plates are inserted in the critical assembly, it is necessary to know more about their composition and uniformity. This summary focuses on the plate characterization plans. Each plate will undergo (1) neutron transmission measurements at different locations to determine the 10 B areal density and (2) an in-depth x-ray computed tomography (XCT) examination to obtain the exact Sizes and distribution of the B4C powder particles inside the plates. In parallel, plate modeling studies are performed with a goal to determine the validity of the currently used approximation of modeling the neutron absorber plates as a homogeneous mixture of Aluminum 1100 alloy and B4C— instead of explicitly modeling the B4C particles. By using the experimental 10 B areal density measurements, and the exact size and location of the B4C particles obtained by XCT, a plate model can theoretically be built that reproduces the plate with extremely high fidelity. The results of this modeling study could increase the confidence of the criticality safety community in its modeling methods when using this type of neutron absorber material, and the industry could use these validations to change the boron loading credit limits from the U.S. Nuclear Regulatory Commission standard review plan for dry cask storage of spent nuclear fuel. The modeling calculations are performed with SCALE 6.3.0 using the KENO V.a sequence for criticality calculations with the ENDF/B-VIII.0 continuous-energy cross section library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stations Tool for Automated Permitting (S-TAP) User Manual

The Stations Tool for Automated Permitting (S-TAP) is a spreadsheet-based plan review questionnaire designed to help automate and expedite the electric vehicle supply equipment (EVSE) permitting process. This manual goes into detail on the development of the tool and guidance for use cases of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Clear Sky Tampa Bay: Tampa Bay Regional Policy Landscape Analysis (Florida Energy Resilience Policy Landscape) [Slides]

This deck focuses on policies and programs that may enable, constrain, or inform the deployment of solar and storage for resilience in the Tampa Bay Region. This deck also reviews planning approaches within the Tampa Bay Region to ensure that resources developed under the Clear Sky Tampa Bay project are consistent with established practice and relevant to regional practitioners.

14 SOLAR ENERGY↗

2023 Sandia Day at UT Austin

On Wednesday, March 8 th and Thursday, March 9 th , 2023, the University of Texas at Austin hosted Sandia National Laboratories (Sandia) for “Sandia Day 2023 at UT Austin” with the intention of reviewing, planning and shaping ongoing and future collaborations in key areas that reflect each organization’s priorities and strengths. The event brought together nearly 100 UT and Sandia participants including executive leadership, researchers, faculty, staff, and students. The primary sessions of Sandia Day consisted of a half-day tour of select J.J. Pickle Research Campus facilities, a networking happy hour, leadership meetings, presentations by both Sandia and UT Austin representatives in areas of research strategic priorities: Grid Resiliency, Examining Climate Change, and Microelectronics, and a research poster session with lunch. The group also discussed growth opportunities in the following research areas: nuclear and radiation engineering, pulsed power and fusion physics, and digital engineering, specifically as it related to materials discovery and advanced manufacturing. Appendix A contains the full Sandia Day agenda.

99 GENERAL AND MISCELLANEOUS↗

System Level Analysis Software Validation with Argonne's THETA Experimental Facility (Final CRADA Report)

Under this CRADA, the Contractor will be generating and collecting sodium-based experimental data with modern instrumentation. The Contractor will work symbiotically with the Participant to generate SAS4A/SASSYS-1 and SAM computational models of the THETA experimental facility for validation of the system-level analysis codes utilized by Oklo, Inc. This effort will be specifically focused on the design basis event space scoped by Chapter 15 of the NRC’s Standard Review Plan (NUREG-0800) with an emphasis on natural circulation and thermal stratification phenomena in a prototypic sodium-cooled fast reactor (SFR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington

The objective of this document is to provide a maintenance plan (MP) that supports the Hanford Site composite analysis (CA). Maintenance consists of four activities: compliance and performance monitoring; research and development; planned reviews and analysis; and revisions to the CA. This MP will be reviewed annually by the site and updated as needed to address priorities based upon new information or proposed changes, the status of any disposal authorization statement (DAS) conditions/limitations and Low-Level Waste Disposal Facility Federal Review Group (LFRG) issues. This revision supersedes Revision 4.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating equity in transportation scenario planning: A systematic review

To address the growing uncertainties in the future transportation industry, planners and engineers have identified and implemented scenario planning, a multi-step and strategic approach, in long-range transportation planning. A comprehensive examination of how equity is envisioned, planned, and analyzed during this process remains absent, despite several key guidelines of scenario planning exercises. This paper conducts a systematic literature review focusing on how equity has been considered and evaluated in scenario planning. The resources include academic papers, agency reports, and materials from the recent scenario planning conference, the 2nd Conference on Scenario Planning in Transportation hosted by the Transportation Research Board. This paper examines equity in scenario planning in three important ways: 1) the ways equity has been integrated across steps; 2) how equity analysis has evolved; and 3) when it is necessary to consider equity. This work adds value to the existing body of knowledge by presenting the policy implications based on the review of the current scenario planning research and practices. Early policy recommendations include the need for more vertical equity evaluations, the construction of robustness and justice indicators, and the adoption of a flexible mindset of planning for rather than being fixated on a single scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sustaining the Z Facility (FY24 Progress Report)

Based on planning and reviews conducted in 2020, it is clear today that the Z Facility must be sustained through 2040 or longer. This requires a well-developed and executed maintenance and sustainment effort. Z’s Sustainment Plan outlines the approach that Sandia’s Pulsed Power Sciences Center will pursue to assure that the Z Facility maintains its world class research and development program supporting the NNSA’s Science Based Stockpile Stewardship efforts. In FY24, the Pulsed Power Center at SNL planned and executed many substantial sustainment projects as well as maintenance-driven-sustainment aligned to the Sustainment Plan. These projects are listed in this section with brief descriptions of the work executed.

42 ENGINEERING↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗