Results for “planning,”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION

Plan de Acción Comunitario de Energía: Pastillo Tibes [Community Energy Action Plan: Pastillo Tibes]

El Plan de Acción Comunitario de Energía para Pastillo Tibes es una estrategia integral orientada a fortalecer la resiliencia del sistema eléctrico en la comunidad frente a los desafios energéticos. Este documento preliminar enfatiza la importancia de asumir la responsabilidad del plan, además de la inclusión y la adaptabilidad en el proceso de planificación, y está especificamente diseñado para esta comunidad.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Regional Commercialization Plan (Final): Work Products 4.4.b (Regional Commercialization Plan) & 4.3 (Socioeconomic Impacts of CCUS and Workforce Readiness)

Commercialization of carbon capture and storage (CCS) within the SECARB-USA region is scaling up and will continue as governments and private companies expand on current decarbonization efforts. The Inflation Reduction Act (2022) enhanced 45Q tax credits beyond the 2018 Bipartisan Budget Act levels by incentivizing previously uneconomic projects to develop CCS plans and infrastructure. Additionally, the continued interest and support for CCS mitigates the relative risk of commercial-scale projects that are seeking long-term viability to develop capture facilities to accommodate their emissions reduction goals. This multifaceted Commercialization Plan provides an overview of the current status and potential for CCS in the Southeast and the pathways to achieve emissions reduction goals in the region by 2050. Specifically, the study addresses: • The current status of CCS activities in the SECARB region, • Assessment of buildout pathways for CCS projects and carbon transport infrastructure development opportunities, • Estimation of CCS job creation and economic impacts, and • The social justice considerations and public benefits associated with CCS activities in the SECARB-USA region.

42 ENGINEERING

Plan energético estratégico: Playa de Ponce, Ponce, Puerto Rico [Strategic Energy Plan: Playa de Ponce, Ponce, Puerto Rico]

Un Nuevo Amanecer Inc. (UNA), a community-based NGO (501C(3)), sought technical assistance through the U.S. Department of Energy's (DOE's) Energy Technology Innovation Partnership Project (ETIPP) to develop a strategic energy plan (SEP) for the community of Playa de Ponce on the south coast of Puerto Rico. A SEP helps communities identify energy goals and priority projects, and outline strategies and actions to build a shared path toward their energy vision.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES

A plan to revitalize the domestic superconducting radio-frequency industry

Superconducting radio-frequency (SRF) cavities are essential building blocks of modern particle accelerators for scientific research, and they offer unique capabilities that could be transformative for commercial applications. Growth of the domestic SRF industry in North America has faced several challenges over the past decades, as most of the international demand for cavities was supplied by European vendors. This contribution provides a brief review of the domestic industrial vendor space, an outlook of the global demand for SRF cavities and an outline of the challenges leading to this supply chain deficiency. One of the main challenges towards establishing a robust domestic SRF industry has been the large uncertainty in the demand. Meanwhile, research and development activities to raise technical readiness of SRF accelerators for industrial use have continued and several potential markets are emerging that may offer a consistent and growing demand for SRF cavities. Finally, reasons and means of establishing and sustaining competitive domestic suppliers are described.

Accelerator Physics

Integrating three plan evaluation approaches for coordinated heat resilience in cities across the Arizona urban corridor

Increasing heat poses a growing threat to cities worldwide due to both climate change and the urban heat island effect. While heat planning and governance are still emergent, research suggests that silos and conflicts within cities' networks of plans often impede heat resilience. Integrated heat resilience planning, therefore, requires a systematic and comprehensive analysis of the silos and conflicts relevant to heat resilience within networks of plans. This study is the first to combine three complementary plan evaluation methods to assess how cities' networks of plans address heat resilience. We applied 1) plan cross-referencing, 2) Plan Quality Evaluation for Heat Resilience, and 3) Plan Integration for Resilience Scorecard™ (PIRS™) for Heat to 19 plans from seven Arizona cities. We find similarities and differences in how these cities' networks of plans address heat hazards. The plans have consistently high-quality participation and coordination principles but lack details on vulnerability and climate change uncertainty, suggesting a need to move beyond immediate heat risks. We also identify opportunities to diversify policy mechanisms, spatially target high heat risk areas, and enhance the connection between planning efforts. These results validate that plan elements are interlinked and the importance of integrative plan development processes to improve heat resilience.

Extreme heat

Assessing heat resilience coordination in networks of plans

Networks of plans coordinating on hazard mitigation can limit losses. We offer a novel network analysis methodology to investigate how networks of plans explicitly coordinate, and the purpose and nature of coordination. We illustrate the method using networks of plans shaping heat resilience in seven Arizona cities. The network analysis can help planners to identify influential plans that need to be high quality, peripheral plans, and potential governance silos. Furthermore, investigation into plan roles offers an ontological lens into how plans network, consult, and share information. The nature of coordination varies by purpose. General plans are cited for goals, while hazard mitigation plans are referenced for heat fact base. Transportation plans cite goals and fact base in other transportation plans, but rarely cite other plan types. Furthermore, these findings will help planners to consider the roles and merits of different plans while integrating hazards across the next generation of networks of plans.

coordination

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership

Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future

Most states today require regulated electric utilities to file an IRP every 1 to 5 years, and some utilities voluntarily prepare these plans. Planning needs have changed in recent years due to emerging load growth, plant retirements, rising costs, and more extreme weather events – among other factors. In response, Synapse Energy Economics and Lawrence Berkeley National Laboratory produced a joint report, Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future. The guide offers best planning practices for electricity systems undergoing a major transition, but also contains a wealth of practical guidance to develop technically sophisticated, clearer, more effective, and state-of-the-art electric utility resource plans. The guide is for resource planning professionals and stakeholders involved in resource planning processes. This diverse group includes utility personnel tasked with conducting resource planning and making investment decisions, state regulatory commissions that develop planning guidance and oversee the resource planning process, and stakeholders that represent a wide range of interests—utility consumer advocates, environmental groups, industrial customers, local governments, independent power producers, and many other

29 ENERGY PLANNING, POLICY, AND ECONOMY

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS