Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning scheduling architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Used Nuclear Fuel Management Using the Next Generation System Analysis Model

The U.S. Department of Energy (DOE) is leading the National effort to manage the back end of the nuclear fuel cycle, encompassing the safe transportation, storage/staging, and/or eventual disposal of used nuclear fuel (UNF) and high-level radioactive waste. The Next Generation System Analysis Model (NGSAM) is DOE’s discrete-event, agent-based simulation tool designed to model the full life cycle of UNF from reactor discharge to final disposal. NGSAM supports the DOE Office of Spent Fuel and High-Level Waste Disposition by enabling a detailed, scenario-based analysis of logistics, infrastructure, and shipping strategies. NGSAM replaces legacy models with a modern, flexible platform built on Repast Simphony and enhanced by the Process Analysis Tool. NGSAM simulates the movement and interaction of individual fuel assemblies with system components such as canisters, casks, railcars, and facilities. The model integrates with the Java Transportation Operations Model to plan and execute transportation scenarios, supporting both constrained and unconstrained resource allocation. Key features include customizable allocation and acceptance algorithms, detailed facility-level operations, and a Quick Edit tool for rapid scenario adjustments. NGSAM supports multimodal transportation modeling (e.g. rail, road, barge) and provides comprehensive cost, schedule, and infrastructure data. NGSAM utilizes data from sources such as DOE’s STANDARDS UNF database and DOE’s Stakeholder Tool for Assessing Radioactive Transportation, while also allowing user-defined inputs for scenario customization. NGSAM enables stakeholders to evaluate complex UNF management strategies, assess system performance under varying assumptions, and inform decision making for future infrastructure investments. Its modular architecture and integration with other Integrated Waste Management System tools make it a critical asset for planning the safe and efficient disposition of the Nation’s growing UNF inventory.

Craig, Brian [Argonne National Laboratory (ANL)]↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Historic Significance and Current Condition Assessment of Building 06-CP-170, the Yucca Flat Weather Station, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-170, the Yucca Flat Weather Station on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-170 is scheduled for demolition as part of this undertaking. Building 06-CP-170 was originally recorded in 2018 during a Section 106 cultural resources inventory for a proposed installation of a 138-kilovolt transmission line on the NNSS. The building was determined individually eligible by the DOE, in consultation with the Nevada State Historic Preservation Office, for inclusion in the National Register of Historic Places under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing. Pursuant to Stipulation III.D.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-170 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.D.2.

54 ENVIRONMENTAL SCIENCES↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near-Real-Time Forecast of Satellite-Based Soil Moisture Using Long Short-Term Memory with an Adaptive Data Integration Kernel

Nowcasts, or near-real-time (NRT) forecasts, of soil moisture based on the Soil Moisture Active and Passive (SMAP) mission could provide substantial value for a range of applications including hazards monitoring and agricultural planning. To provide such a NRT forecast with high fidelity, we enhanced a time series deep learning architecture, long short-term memory (LSTM), with a novel data integration (DI) kernel to assimilate the most recent SMAP observations as soon as they become available. The kernel is adaptive in that it can accommodate irregular observational schedules. Testing over the CONUS, this NRT forecast product showcases predictions with unprecedented accuracy when evaluated against subsequent SMAP retrievals. It showed smaller error than NRT forecasts reported in the literature, especially at longer forecast latency. The comparative advantage was due to LSTM’s structural improvements, as well as its ability to utilize more input variables and more training data. The DI-LSTM was compared to the original LSTM model that runs without data integration, referred to as the projection model here. We found that the DI procedure removed the autocorrelated effects of forcing errors and errors due to processes not represented in the inputs, for example, irrigation and floodplain/lake inundation, as well as mismatches due to unseen forcing conditions. The effects of this purely data-driven DI kernel are discussed for the first time in the geosciences. Furthermore, this work presents an upper-bound estimate for the random component of the SMAP retrieval error.

54 ENVIRONMENTAL SCIENCES↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report for ARPA-E LOCOMOTIVES Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) Project

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool used to evaluate strategies for cost-effectively deploying advanced locomotive technologies and associated infrastructure. ALTRIOS simulates freight-demand-driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward trade-offs and operation integration of different technology rollout strategies. An open, integrated simulation tool is valuable for identifying future research needs and making decisions on technology development, routes, and train selection. This final report details the ALTRIOS software architecture, major modules and components, and data validation process. It demonstrates the software's utility through a 30-year rollout case study targeting high penetration of advanced powertrain technologies by 2050 for two BNSF Railway routes: loaded taconite ore trains from Hibbing, Minnesota, to Superior, Wisconsin, and mixed-freight trains from Superior to Minneapolis, Minnesota.

33 ADVANCED PROPULSION SYSTEMS↗

Historic Significance and Current Condition Assessment of Building 06-CP-10, Device Assembly Building, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-10, the first device assembly building on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-10 and two small magazine bunkers (06-CP-10A and 06-CP-805) associated with Building 06-CP-10 are scheduled for demolition as part of this undertaking. Building 06-CP-10 was originally recorded in 2003 during a historical evaluation of four buildings in Area 6. In consultation with the Nevada State Historic Preservation Office, the building was determined individually eligible for inclusion in the NRHP under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing and under Significance Criterion C as a distinct type of construction associated with the nuclear industry. Building 06-CP-10A, a munitions magazine, and 06- CP-805, a cap-and-fuse bunker, have been recorded as contributing accessory resources to 06-CP-10. Pursuant to Stipulation III.C.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-10 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.C.2.

54 ENVIRONMENTAL SCIENCES↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Celeritas: Accelerating Geant4 with GPUs

Celeritas [1] is a new Monte Carlo (MC) detector simulation code designed for computationally intensive applications (specifically, High Lumi- nosity Large Hadron Collider (HL-LHC) simulation) on high-performance heterogeneous architectures. In the past two years Celeritas has advanced from prototyping a GPU-based single physics model in infinite medium to implementing a full set of electromagnetic (EM) physics processes in complex geometries. The current release of Celeritas, version 0.3, has incorporated full device-based navigation, an event loop in the presence of magnetic fields, and detector hit scoring. New functionality incorporates a scheduler to offload electromagnetic physics to the GPU within a Geant4-driven simulation, enabling integration of Celeritas into high energy physics (HEP) experimental frameworks such as CMSSW. On the Summit supercomputer, Celeritas performs EM physics between 6 and 32 faster using the machine’s Nvidia GPUs compared to using only CPUs. When running a multithreaded Geant4 ATLAS test beam application with full hadronic physics, using Celeritas to accelerate the EM physics results in an overall simulation speedup of 1.8–2.3× on GPU and 1.2× on CPU.

Johnson, Seth R.↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗