Search NASASearch

SEARCH · Search NASA

Results for “point source capture analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Life Cycle Analysis Framework for Point Source Capture Systems

NETL studies the costs and benefits of PSC for electricity, industry, and mobile applications. Mobile point source capture (MPSC) and storage applied to freight modes captures emissions directly from exhaust. This poster presents a framework for conducting LCA of PSC systems applied to heavy-duty trucks, freight trains, and marine vessels. The framework defines a wheels-to-storage (gate-to-grave) boundary, including energy demands (electricity, heat, and cooling requirements), solvent use and cycling, onboard system components, carbon storage in a saline aquifer, and upstream manufacturing impacts for equipment, with a suggested functional unit of 1 tonne-km. Potential data sources for analysis include material, energy, and operational data from Oak Ridge National Laboratory, GREET (Greenhouse gases, Regulated Emissions, and Energy use in Technologies) model, and scientific literature. The suggested analytical approach includes comparison to publicly available business-as-usual systems without capture across all modes of transportation, sensitivity to composition of the capture solvent, and sensitivity to capture rate variation, all of which would support a wholistic PSC business case analysis. For future consideration, analysis can be augmented with consideration of different sources of electricity (e.g., nuclear), fuel substitution, deploying supportive infrastructure such as pipeline offloading points, and downstream applications like enhanced oil recovery (EOR).

life cycle analysis (LCA)

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING

Compact Absorber Technology Leads to Significant Reduction in the Cost of Point Source CO 2 Capture

The size of columns in traditional absorption-based processes for CO 2 capture contributes significantly to the overall capital cost. A demonstrated method to reduce the cost of point source CO 2 capture, focusing on reducing the absorber height by increasing the liquid-to-gas reaction contact area and decreasing the CO 2 diffusion resistance without increasing gas-side pressure drop is presented along with techno-economic analysis results. Bench-scale tests on the unique Compact Absorber showed overall CO 2 mass transfer enhancement of varying degrees compared to a traditional packed column for similar process conditions, demonstrating that a 60+% reduction in size of a typical post-combustion absorber with a packing height of 70-100 ft and total height of 150-180 ft can be achieved. The techno-economic analysis showed significant cost reductions when the Compact Absorber is combined with other transformative aspects of the University of Kentucky Institute for Decarbonization and Energy Advancement point source CO 2 capture process compared to the U.S. Department of Energy National Energy Technology Laboratory pertinent reference case for pulverized coal plants with CO 2 capture. Here, a levelized cost of electricity excluding CO 2 transportation and storage of $\$95.6$/MWh was estimated, which is a 9% reduction, with a total capital cost contribution of $45/MWh, which is a 12% reduction. Additionally, a breakeven CO 2 sales price also referred to as the cost of CO 2 capture, of $36.70/tonne was estimated when the UK hindered primary amine solvent is used, which is a 20% reduction compared to the reference case.

CO2 capture

Insights from Initial Engineering Designs of Point Source Capture at Industrial Facilities

Initial engineering design studies examining the application of state-of-the-art carbon capture technology at industrial plants contain generally overlooked real-world design considerations for near-term deployment of point source capture (PSC). The implementation of PSC across a wide range of industrial applications presents unique challenges associated with fluctuating CO<sub>2</sub> concentrations, flue gas composition, and utility and land availability. In this article, seven recent industrial retrofit PSC projects are reviewed to investigate the impact of site-specific factors on project design and cost. Across the seven projects, three capture technology classes and four industrial applications are considered, allowing insight into industry-specific opportunities for PSC technology synergy. Common challenges across projects and proposed design solutions are highlighted to propagate ideas and solutions to close the technology gaps and accelerate learning rates.

FEED Studies

A Review on Direct Air Capture of Carbon Dioxide: Sorbent Materials, Process Engineering, Industrial Scale-Up, and Future Perspectives

The relentless accumulation of anthropogenic greenhouse gases has driven atmospheric carbon dioxide concentrations to approximately 426 ppm, necessitating the aggressive deployment of negative-emission technologies to achieve net zero by 2050. Direct air capture (DAC) offers a scalable, location-independent approach to atmospheric carbon removal; however, it is fundamentally constrained by the significant thermodynamic barriers associated with capturing CO 2 from ultradilute ambient conditions, requiring minimum thermodynamic energy inputs substantially higher than those for postcombustion point sources. This comprehensive review critically examines the technological landscape of DAC, focusing on the interdependent triad of sorbent material design, contactor engineering, and regeneration thermodynamics. We evaluate the fundamental boundaries of adsorption, emphasizing that an optimal adsorption enthalpy and isosteric heat of adsorption must balance the high CO 2 uptake capacity with the energetic penalties of sorbent regeneration. A systematic, comparative analysis of state-of-the-art sorbents is presented, encompassing mesoporous silicas, zeolites, carbon-based materials (CBMs), metal−organic frameworks (MOFs), porous organic polymers (POPs), and polymeric membranes. Special attention is devoted to surface functionalization strategies, particularly amine grafting and impregnation, which transition capture mechanisms from physisorption to chemisorption to enhance selectivity under ambient moisture and low partial pressures. Furthermore, we assess the operational merits of various reactor configurations, including gas−solid, gas−liquid, and membrane contactors, alongside regeneration cycles such as temperature, vacuum, pressure, and moisture swing adsorption. Finally, the review bridges fundamental materials science with industrial application by chronicling the scale-up milestones of pioneering entities and providing a strategic roadmap for advancing DAC technology readiness levels toward global deployment.

Adsorption

Along-Trajectory Acoustic Signal Variations Observed During the Hypersonic Re-Entry of the OSIRIS-REx Sample Return Capsule

The re-entry of the Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer (OSIRIS-REx) sample return capsule (SRC) on 24 September 2023 presented a rare opportunity to study atmospheric entry dynamics through a dense network of ground-based infrasound sensors. As the first interplanetary capsule to re-enter over the United States since Stardust in 2006, this event allowed for unprecedented observations of infrasound signals generated during hypersonic descent. We deployed 39 single-sensor stations across Nevada and Utah, strategically distributed to capture signals from distinct trajectory points. Infrasound data were analyzed to examine how signal amplitude and period vary with altitude and propagation path for a nonablating hypersonic object with well-defined physical and aerodynamic properties. Raytracing simulations incorporated atmospheric specifications from the ground-2-space model to estimate source altitudes for observed signals. Results confirmed ballistic arrivals at all stations, with source altitudes ranging from 44 to 62 km along the trajectory. Signal period and amplitude exhibited strong dependence on source altitude, with higher altitudes corresponding to lower amplitudes, longer periods, and reduced high-frequency content. Regression analysis demonstrated strong correlations between signal characteristics and both altitude and propagation geometry. Our results suggest, when attenuation is considered, the amplitude is primarily determined by the source, with the propagation path playing a secondary role over the distances examined. These findings emphasize the utility of controlled SRC re-entries for advancing our understanding of natural meteoroid dynamics, refining atmospheric entry models, and improving methodologies for planetary defense. The OSIRIS-REx SRC campaign represents the most comprehensive infrasound study of a hypersonic re-entry to date, showcasing the potential of coordinated geophysical observational networks for high-energy atmospheric phenomena, including space debris re-entries.

58 GEOSCIENCES

Transformational Sorbent-Based Process for a Substantial Reduction in the Cost of CO 2 Capture

InnoSepra’s project, “Transformational Sorbent-Based Process for a Substantial Reduction in the Cost of CO 2 Capture,” utilized computational tools, materials characterization, and lab and pilot-scale testing to optimize previously identified materials to determine their performance under post-combustion capture conditions. InnoSepra utilized the test results to determine the energy required for regeneration and to develop a process design/analysis to demonstrate the application of developed materials for post-combustion capture. A techno-economic analysis was performed to fully assess the potential of the materials for post-combustion capture. InnoSepra also updated the State Point Data Table and completed the environmental, health, and safety (EH&S) Risk Assessment. The InnoSepra CO 2 capture technology has the potential for a significant reduction in the CO 2 capture cost for the power plant and industrial flue gases.

01 COAL, LIGNITE, AND PEAT

Preliminary Screening Techno-Economic Analysis of Industrial SOFC/SOEC and Reversible SOC Integration

National Energy Technology Laboratory (NETL) provides system-level process, cost, and market analyses on solid oxide cell (SOC) based technologies. Specifically, techno-economic analyses (TEA), market assessments, and other technology evaluations serve to guide the U.S. Department of Energy (DOE) Office of Fossil Energy and Carbon Management (FECM) Reversible Solid Oxide Fuel Cell (R-SOFC) Program technology goals and objectives. These studies are key to describing how the technologies contribute to improving domestic energy infrastructure in a clean, efficient manner. This effort seeks to elucidate the potential integration opportunities between reversible SOCs and industrial systems which would aid in SOC commercialization and deployment. These preliminary screening-level results show what opportunities exist for power generating SOFCs, hydrogen producing SOECs, and point-source carbon capture. Improvements can be seen through changes in cost of electricity, cost of hydrogen, and cost of carbon capture.

reversible SOC

Energy-efficient carbon capture from industrial point sources via commercially available green solvent and hollow fiber membrane contactors

Solvent-based absorption systems have emerged in the carbon capture space due to their high absorption capacities, reusability, and favorable energy requirements. Using diethyl sebacate as a solvent for pre- and post-combustion carbon capture has advantages over other solvents, including high hydrophobicity, low viscosity, low vapor pressure, high CO 2 solubility, high CO 2 selectivity, and being commercially available in large quantities. Despite these advantageous properties, the use of diethyl sebacate as a solvent for post-combustion carbon capture has not been studied in detail. To examine the capability of diethyl sebacate, a scalable, energy-efficient, hollow fiber membrane (microporous polypropylene and polyvinylidene fluoride) contactor (HFMC)-based process with low-cost and high surface area is investigated. A purity of 95.3 % CO 2 with 46 % recovery in one absorption stage was achieved, with a permeate flux over one magnitude greater than using a deep eutectic solvent in the same system. Technoeconomic analysis determined a ∼ 0.8 GJ per ton of CO 2 at a processing cost of ∼$93 per ton of CO 2 . Results from this work underscore the potential for utilizing green solvents in HFMC-based separation processes for effective carbon capture and provide a pathway towards practical deployment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Imaging Three-Dimensional Molecular Structure and Dynamics with Multiparticle Covariance and Cumulant Coulomb Explosion Analysis

Coulomb explosion imaging (CEI) provides a direct means of imaging molecular geometry by correlating fragment ion momenta following the fragmentation of a molecular polycation. Here, we demonstrate the use of three-body covariance and four-body cumulant analysis to extract three-dimensional (3D) structural information from the X-ray-induced Coulomb explosion of tert-butyl iodide (C4H9I). Site-selective ionization at the iodine 4d edge with intense femtosecond soft X-ray pulses from an X-ray free-electron laser (XFEL) enables rapid charge buildup and molecular breakup. By correlating ionic fragments in the molecular frame, we isolate complete dissociation channels and reveal subtle structural changes, such as umbrella-type motion of the branched alkyl chain, during the ionization process. Comparison with point-charge simulations of the Coulomb explosion shows close agreement, validating the approach. Furthermore, these results establish covariance/cumulant mapping as a powerful strategy for imaging complex three-dimensional molecular structures and point the way toward time-resolved CEI using both XFEL and tabletop sources for capturing ultrafast structural dynamics.

Imaging

Direct flue gas capture for algae cultivation and subsequent valorization: evaluating life cycle emissions and costs

Algae cultivation and processing is an important pathway under discussion within the broader CO 2 capture and utilization umbrella. Here, we discuss the results of a life-cycle analysis and techno-economic analysis of a pilot-scale photobioreactor that uses flue gas directly from natural gas or biogas combustion at 3–5% CO 2 concentration. The system requires minimal freshwater use as it has been successfully run with industrial wastewater and has a much smaller areal footprint compared with open pond cultivation. Introducing the flue gas directly to the photobioreactor avoids the need for CO 2 separation and pressurization, which is undertaken in many other algae cultivation systems. For the end-use of the biomass, the default case assumes conversion of algae to liquid fuels via hydrothermal liquefaction. The results indicate that the pilot-scale system has a higher cost, and comparable greenhouse gas emissions compared to pond-based systems, especially as the grid is anticipated to evolve to a lower carbon intensity. The costs of algae biofuel production range from $\$12–16$ per GGE at the current pilot scale. Depending on whether the source of the carbon is fossil or biogenic, the net emissions are 68 g CO 2 e per MJ and −4 g CO 2 e per MJ respectively. If the marine algae species is used instead of the freshwater species, it offers an additional 16 g CO 2 e per MJ carbon fixation in the form of calcium carbonate. The findings point to broadly desirable trends in GHG emissions and costs, while the discussion aims to shed light on areas that could further improve the scalability of the system.

20 FOSSIL-FUELED POWER PLANTS

Dynamics of Thermally Driven Domain Transformation in Ferroelectric Thin Films

An important feature in ultrathin ferroelectric films is the spontaneous formation of nanoscale polarization domain patterns. Epitaxial strain can greatly increase the ferroelectric transition temperature such that films can be in the ferroelectric state during growth. On the other hand, depolarization fields compete with ferroelectricity in ultrathin films, and, consequently, the optimal domain configuration during growth is a moving target. Under these conditions it is readily possible for a grown film to be in a nonequilibrium domain configuration. As the energy landscape in the system is quite complex, the relaxation dynamics by which a system can evolve towards the true equilibrium configuration are also quite interesting. Here, to capture the details of this process we used Bragg-geometry x-ray photon correlation spectroscopy (XPCS), in which x-ray scattering speckle patterns contain the information from the domain arrangements inside the film. With modest heating (∼15⁢0 °C) domain relaxation from 𝑇 (tetragonal) to 𝑀 𝐶 (monoclinic) was observed in BaTiO 3 films grown on ultrathin ferroelectric PbTiO 3 layers. Two-time correlation analysis reveals fascinating details associated with sticking points and reversals in the process.

36 MATERIALS SCIENCE

CHESS 2025: Orthorectified airborne RGB imagery from NEON AOP surveys

This dataset provides Level 1 (L1) and Level 3 (L3) orthorectified Red-Green-Blue (RGB) imagery collected for the 2025 Colorado Headwaters Ecological Spectroscopy Study (CHESS). This high-resolution imagery is a photographic record of red, green, and blue visible light from sunlight reflected off of the Earth’s surface. The data comprise full-color images of the ground surface and are primarily intended to provide context to imaging spectroscopy and light detection and ranging (LiDAR) data. The data were acquired over three study domains in the Upper Gunnison river basin: the upper East River watershed (CRBU); Almont Triangle and Taylor Canyon (ALMO); and Upper Taylor River watershed (UPTA) between 2025-06-13 and 2025-07-15. RGB images were acquired using the PhaseOne IXM-RS150F high-resolution digital camera onboard the National Ecological Observatory Network (NEON) Airborne Observation Platform (AOP). The package data include both an L1 product comprising one camera frame per file and an L3 mosaic aligned to the Universal Transverse Mercator (UTM) Zone 13N grid and the World Geodetic System (WGS) 84 projection. Both products are provided in geotif (.tif) format at 0.1 m ground resolution. The bulk of the imagery was collected during the main CHESS field campaign from June 13 to July 15, 2025. Additional images of a portion of the Upper Taylor (UPTA) domain were collected on September 18, 2025, to fill gaps in imagery identified after the main campaign was complete. RGB camera imagery is not radiometrically calibrated, and therefore pixel values should not be exploited for scientific analysis. Pixel values have undergone a manual adjustment to enhance feature identification. The imagery is rigorously geolocated which does allow for reliable geometric information to be retrieved. To generate the orthorectified imagery, the NEON AOP camera captured visible spectrum in red, green, and blue bands. The raw images were then processed using NEON’s camera orthorectification workflow. A boresight calibration flight was made to build a complete camera, distortion, and alignment model. Color balance/white balance and exposure correction were applied to the raw RGB images. The corrected images were orthorectified by ray-tracing image pixels to a lidar-derived digital surface model (DSM) mesh using the refined camera model, outputting orthorectified raster pixels on a regular grid. Flightline-level data were mosaicked by selecting per-pixel contributions from overlapping orthorectified images using line-of-sight (LOS) zenith angle minimization to reduce edge distortions. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. Funding Acknowledgement: Field and remote-sensing data acquisition was performed under a grant from the National Aeronautics and Space Administration (80NSSC24K1005). This work was also supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231.

2018 NEON and 2025 CHESS Campaigns

Emergent quasi-one-dimensional antiferromagnetism in the distorted kagome magnet CePtPb

CePtPb hosts a distorted kagome lattice of Ce 3+ ions, providing a clean platform to investigate how reduced local symmetry and strong spin-orbit coupling reshape frustrated magnetism. Magnetization, specific heat, and magnetocaloric effect measurements, combined with a symmetry analysis of the single-ion anisotropy, demonstrate that the local 𝑚⁢2⁢𝑚 site symmetry selects a nearly Ising-like Kramers doublet with easy axes lying within the 𝑎⁢𝑏 plane. This results in three distinct in-plane Ising directions and an overall easy-plane anisotropy. The low-energy magnetic response is well captured by a three-sublattice Ising model, which quantitatively reproduces the saturation magnetization for arbitrary in-plane field orientations, including $[110]$ and $[1\bar{⁢1}⁢0]$, as well as the ratio of the field-induced critical fields. For 𝐵∥$[110]$, the phase diagram exhibits two quantum critical points at 𝐵 c⁢1 = 0.25T and 𝐵 c⁢2 = 0.55T, arising from the sequential polarization of the three Ising sublattices. In conclusion, these results reveal that the system develops quasi-one-dimensional spin chains along the 𝑐 axis, emerging from the nominally three-dimensional crystal structure composed of stacked kagome layers, and illustrate how reduced local symmetry can drive effective dimensional reduction in rare-earth Ising magnets.

Li, Fangli [Southern University of Science and Tec

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF