Repurposing an energy system optimization model for seasonal power generation planning
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Power systems are planned such that they have adequate generation capacity to meet the load, according to a defined reliability target. The increase in the penetration of wind generation in recent years has led to a number of challenges for the planning and operation of power systems. A key metric for system adequacy is the capacity value of generation. The capacity value of a generator is the contribution that a given generator makes to overall system adequacy. The variable and stochastic nature of wind sets it apart from conventional energy sources. As a result, the modeling of wind generation in the same manner as conventional generation for capacity value calculations is inappropriate. In this paper a preferred method for calculation of the capacity value of wind is described and a discussion of the pertinent issues surrounding it is given. Approximate methods for the calculation are also described with their limitations highlighted. The outcome of recent wind capacity value analyses in Europe and North America are highlighted with a description of open research questions also given.
This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.
Shows different combinations of generation, storage, and load components: display, video monitor with keyboard input to microprocessor, and video monitor for display of load curves and power generation. Planning tool for electric utilities, regulatory agencies, and laymen in understanding basics of electric-power systems operation.
This study addresses the optimal allocation of reactive power volt-ampere reactive (VAR) sources under the paradigm of high penetration of wind energy. Reactive power planning (RPP) in this particular condition involves a high level of uncertainty because of wind power characteristic. To properly model wind generation uncertainty, a multi-scenario framework optimal power flow that considers the voltage stability constraint under the worst wind scenario and transmission N 1 contingency is developed. The objective of RPP in this study is to minimise the total cost including the VAR investment cost and the expected generation cost. Therefore RPP under this condition is modelled as a two-stage stochastic programming problem to optimise the VAR location and size in one stage, then to minimise the fuel cost in the other stage, and eventually, to find the global optimal RPP results iteratively. Benders decomposition is used to solve this model with an upper level problem (master problem) for VAR allocation optimisation and a lower problem (sub-problem) for generation cost minimisation. Impact of the potential reactive power support from doubly-fed induction generator (DFIG) is also analysed. Lastly, case studies on the IEEE 14-bus and 118-bus systems are provided to verify the proposed method.
The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.
This paper presents a first-order autoregressive algorithm to generate real-time (RT), hour-ahead (HA), and day-ahead (DA) wind and load forecast errors. The methodology aims at producing random wind and load forecast time series reflecting the autocorrelation and cross-correlation of historical forecast data sets. Five statistical characteristics are considered: the means, standard deviations, autocorrelations, and cross-correlations. A stochastic optimization routine is developed to minimize the differences between the statistical characteristics of the generated time series and the targeted ones. An optimal set of parameters are obtained and used to produce the RT, HA, and DA forecasts in due order of succession. This method, although implemented as the first-order regressive random forecast error generator, can be extended to higher-order. Results show that the methodology produces random series with desired statistics derived from real data sets provided by the California Independent System Operator (CAISO). The wind and load forecast error generator is currently used in wind integration studies to generate wind and load inputs for stochastic planning processes. Our future studies will focus on reflecting the diurnal and seasonal differences of the wind and load statistics and implementing them in the random forecast generator.
In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.
Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studies of generation assets' planning (e.g., thermal versus renewable), new findings show that the investment decisions could affect the future uncertainties as well. To this end, this paper proposes a multistage decision-dependent stochastic optimization model for long-term large-scale generation expansion planning, where large amounts of wind power are involved. In the decision-dependent model, the future uncertainties are not only affecting but also affected by the current decisions. In particular, the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming model. The wind penetration, investment decisions, and the optimality of the decision-dependent model are evaluated in a series of multistage case studies. The results show that the proposed decision-dependent model provides effective optimization solutions for long-term generation expansion planning.
Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.
Insufficiencies in charging facilities limit the broad application of electric vehicles (EVs). In addition, EV can hardly represent a green option if its electricity primarily depends on fossil energy. Considering these two problems, this paper studies a battery swapping-charging system based on wind farms (hereinafter referred to as W-BSCS). In a W-BSCS, the wind farms not only supply electricity to the power grid but also cooperate with a centralized charge station (CCS), which can centrally charge EV batteries and then distribute them to multiple battery swapping stations (BSSs). The operational framework of the W-BSCS is analyzed, and some preprocessing technologies are developed to reduce complexity in modeling. Then, a joint optimal scheduling model involving a wind power generation plan, battery swapping demand, battery charging and discharging, and a vehicle routing problem (VRP) is established. Then a heuristic method based on the exhaustive search and the Genetic Algorithm is employed to solve the formulated NP-hard problem. Numerical results verify the effectiveness of the joint optimal scheduling model, and they also show that the W-BSCS has great potential to promote EVs and wind power.
In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.
Decision makers rely on models to make important regulatory, policy, and investment decisions. For power systems, these models must capture (i) the future challenges introduced by the integration of large quantities of variable renewable energy sources and (ii) the role that energy storage technologies should play. In this paper, we explore several different approaches to selecting representative days for generation expansion planning models, focusing on capturing these dynamics. Further, we propose a new methodology for adjusting the outputs of clustering algorithms that provides three advantages: the targeted level of net demand is captured, the underlying net demand shapes that define ramping challenges are accurately represented, and the relationship between annual energy and peak demand is captured. This weighting methodology reduces the magnitude of the error in the representative day based generation expansion planning models estimation of costs by 61% on average. The results also demonstrate the importance of carefully performing the clustering of representative days for both system costs and technology mix. In most cases improvements to the total cost of different representative day based expansion plans are realised where conventional generation capacity is substituted for energy storage. Based on the energy storage technology selected we conclude this capacity is being used to address ramping challenges as opposed to shifting renewable generation from off to on peak periods, reinforcing the importance of capturing detailed intraday dynamics in the representative day selection process.
Failing to consider the many long-term uncertainties that affect the performance of a power generation portfolio can result in suboptimal generation expansion plans. Further, traditional deterministic approaches can omit flexible plans that are able to adapt to future events. In this paper, we explore the use of approximate dynamic programming (ADP) to create forward-looking generation expansion plans. A case study is included with three sequential decision periods; three generation technologies; and four uncertainties: demand growth, natural gas prices, renewable portfolio standards, and the adoption of customer-driven solar generation. The flexible plans found through ADP show a 3 % reduction in total expected cost when compared to myopic planning heuristics while circumventing the computational burdens that accompany high-dimensional dynamic programs.
This presentation details the 21st Century Power Partnership's fellowship program accomplishments from 2016. This fellowship brought two fellows from South Africa's power utility, Eskom, to the U.S. Department of Energy's National Renewable Energy Laboratory. The fellows spent two weeks working to improve the fidelity of Eskom's PLEXOS long-term and short-term models, which are used in long-term generation planning exercises and capacity adequacy assessments. The fellows returned to Eksom equipped with a new suite of tools and skills to enhance Eksom's PLEXOS modeling capabilities.
We are witnessing an acceleration in the uptake of renewable energy in power systems. Because of the associated variability and uncertainty of renewables, power systems need to have an adequate supply of flexibility to allow for suitable management of short-term operations. So far most of the work in this area has neglected how flexibility needs associated with renewables are fulfilled as part of dispatchable generation capital investments decisions. To address this challenge, we propose an approach to plan the dispatchable generation mix of a power system as needed to counteract variability and uncertainty associated with significant shares of variable renewable generation. The approach exploits the linear time-invariant feature of variable generation variability using historical phase planes of capacity (in MW) and ramp (in MW/min) to bridge the gap between long-term capacity planning and short-term intra-hour flexibility needs. This approach is much more computationally tractable than other proposals, while also being able to capture adequately short-term operational features like ramping and net load variability. Numerical tests are performed on realistic datasets to substantiate the effectiveness of the approach.
Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, andtransmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.
Presentation on NREL insights from integrated planning processes.