Three-Phase Unbalanced Transient Dynamics and Powerflow for Modeling Distribution Systems With Synchronous Machines

Unlike transmission systems, distribution feeders in North America operate under unbalanced conditions at all times, and generally have a single strong voltage source. When a distribution feeder is connected to a strong substation source, the system is dynamically very stable, even for large transients. However if a distribution feeder, or part of the feeder, is separated from the substation and begins to operate as an islanded microgrid, transient dynamics become more of an issue. To assess the impact of transient dynamics at the distribution level, it is not appropriate to use traditional transmission solvers, which generally assume transposed lines and balanced loads. Full electromagnetic solvers capture a high level of detail, but it is difficult to model large systems because of the required detail. This paper proposes an electromechanical transient model of synchronous machine for distribution-level modeling and microgrids. This approach includes not only the machine model, but also its interface with an unbalanced network solver, and a powerflow method to solve unbalanced conditions without a strong reference bus. The presented method is validated against a full electromagnetic transient simulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Local field topology behind light localization and metamaterial topological transitions [Book Chapter]

We revisit the mechanisms governing the sub-wavelength spatial localization of light in surface plasmon polariton (SPP) modes by investigating both local and global features in optical powerflow at SPP frequencies. Close inspection of the instantaneous Poynting vector reveals formation of optical vortices – localized areas of cyclic powerflow – at the metal-dielectric interface. As a result, optical energy circulates through a subwavelength-thick ‘conveyor belt’ between the metal and dielectric where it creates a high density of optical states (DOS), tight optical energy localization, and low group velocity associated with SPP waves. The formation of bonding and anti-bonding SPP modes in metaldielectric- metal waveguides can also be conveniently explained in terms of different spatial arrangements of localized powerflow vortices between two metal interfaces. Finally, we investigate the underlying mechanisms of global topological transitions in metamaterials composed of multiple metal and dielectric films, i.e., transitions of their isofrequency surfaces from ellipsoids to hyperboloids, which are not accompanied by the breaking of lattice symmetry. Our analysis reveals that such global topological transitions are governed by the dynamic local re-arrangement of local topological features of the optical interference field, such as vortices and saddle points, which reconfigures global optical powerflow within the metamaterial. These new insights into plasmonic light localization and DOS manipulation not only help to explain the well-known properties of SPP waves but also provide useful guidelines for the design of plasmonic components and materials for a variety of practical applications.

42 ENGINEERING↗

Improving Advanced Inverter Control Convergence in Distribution Power Flow

Simulation of modern distribution system powerflow increasingly requires capturing the impact of advanced PV inverter voltage regulation on powerflow. With Volt/var control, the inverter adjusts its reactive power flow as a function of the point of common coupling (PCC) voltage. Similarly, Volt/watt control curtails active power production as a function of PCC voltage. However, with larger systems and higher penetrations of PV, this active/reactive power flow itself can cause significant changes to the PCC voltage potentially introducing oscillations that slow the convergence of system simulations. Improper treatment of these advanced inverter functions could potentially lead to incorrect results. This paper explores a simple approach to speed such convergence by blending in the previous iteration's reactive power estimate to dampen these oscillations. Results with a single large (5MW) PV system and with multiple 500kW advanced inverters show dramatic improvements using this approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Request for the Distribution Grid Atlas

Model-based, distribution powerflow analysis is a foundational component of system planning and grid modernization efforts, but data security is an impediment to collaboration among utility engineers, researchers, developers, community members, and other stakeholders. Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) are partnering to develop the new Distribution Grid Atlas - a publicly available catalog of realistic, geographically relevant, representative distribution feeder models without sensitive geographic information, customer data, or disclosure of utility models. We are looking for utilities to share data for the Distribution Grid Atlas.

distribution↗

Joint Matrix Completion and Compressed Sensing for State Estimation in Low-observable Distribution System

Limited measurement availability at the distribution grid presents challenges for state estimation and situational awareness. This paper combines the advantages of two sparsity-based state estimation approaches (matrix completion and compressive sensing) that have been proposed recently to address the challenge of unobservability. The proposed approach exploits both the low rank structure and a suitable transform domain representation to leverage the correlation structure of the spatio-temporal data matrix while incorporating the powerflow constraints of the distribution grid. Simulations are carried out on three phase unbalanced IEEE 37 test system to verify the effectiveness of the proposed approach. The performance results reveal - (1) the superiority over traditional matrix completion and (2) very low state estimation errors for high compression ratios representing very low observability.

Dahale, Shweta↗

Dynamic Model of Back-to-Back Converter for System Level Phasor Simulation

The power system is expected to evolve rapidly with increasing deployment of power electronic interface and conditioning systems, microgrids, and hybrid AC/DC grids. Among power electronic systems, back-to-back (BTB) converters can be a powerful interface to integrate microgrids and networked microgrids. However, in system level dynamic simulations for synchronous machine dominated system with BTB converters, a detailed electromagnetic sinusoidal models is not warranted as these simulations are focused on electromechanical transients. This paper focus on developing a simple phasor model for back- to-back converters that can be easily integrated into powerflow solvers to facilitate large-scale power system simulations. The model is implemented using C++ language and integrated into GridLAB-D software as a potential new capability. The GridLAB-D phasor domain model is validated against the electromagnetic transient (EMT) simulation of the detailed switching model. Simulation results show that the phasor model successfully captures the dominant dynamics of the converters.

Mahmood, Hisham↗

GridOPTICS/GridPACK

GridPACK is a software framework consisting of a set of modules designed to simplify the development of programs that model the power grid and run on parallel, high performance computing platforms. It also contains several fully developed applications, including powerflow, dynamic simulation, state estimation, Kalman filter analysis (dynamic state estimation), contingency analysis and real time path rating. These applications can be used either standalone or as components in more complicated workflows that combine several different types of application together. The framework modules are available as a combination of libraries and software templates and consist of components for setting up and distributing power grid networks, support for modeling the behavior of individual buses and branches in the network, converting the network models to the corresponding algebraic equations, and parallel routines for manipulating and solving large algebraic systems. The framework also contains a module for distributing tasks evenly amongst computing resources, even if individual tasks vary widely in their execution times. Additional modules support input and output, basic statistical analysis of contingency based calculations, distributed data structures, as well as basic profiling and error management.

Palmer, Bruce↗

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FNCS: A Framework for Power System and Communication Networks Co-Simulation

This paper describes the Fenix framework that uses a federated approach for integrating power grid and communication network simulators. Compared existing approaches, Fenix al- lows co-simulation of both transmission and distribution level power grid simulators with the communication network sim- ulator. To reduce the performance overhead of time synchro- nization, Fenix utilizes optimistic synchronization strategies that make speculative decisions about when the simulators are going to exchange messages. GridLAB-D (a distribution simulator), PowerFlow (a transmission simulator), and ns-3 (a telecommunication simulator) are integrated with the frame- work and are used to illustrate the enhanced performance pro- vided by speculative multi-threading on a smart grid applica- tion. Our speculative multi-threading approach achieved on average 20% improvement over the existing synchronization methods

Co-simulation↗

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF↗

Powered By: Transmission Planning

Presented as part of the NREL Grid Planning and Analysis Center's (GPAC) "Powered By" Series, this iteration focuses not on a specific tool but instead on a domain of expertise/capability being built out at NREL: transmission planning. Various sets of tools are integrated together in this presentation to present a combination of transmission focus areas, case studies, tools and future directions of transmission research.

capacity expansion↗