Search NASA⌕ Search

SEARCH · Search NASA

Results for “proactive investments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Industry case studies: Finance

This article, the third in a series on the U.S. Department of Energy and IDEA collaboration, focuses on financial strategies used by institutions to support district energy system modernization and decarbonization. It highlights how effective funding models, long-term cost analysis, and leadership support are critical to implementing large-scale infrastructure upgrades. The case studies show different approaches to financing. Ball State University demonstrates how life-cycle cost analysis and phased funding—supported by state funding, bonds, and grants—enabled a transition to geothermal energy. Penn State’s Hershey Medical Center emphasizes the importance of financial leadership, shifting from reactive budgeting to data-driven, proactive investment in infrastructure. The University of Washington highlights how comprehensive data collection and analytics can justify investments and even create self-sustaining funding mechanisms like green revolving funds. Overall, the article shows that combining strong financial planning, data-driven decision-making, and innovative funding approaches is essential for advancing sustainable district energy systems while managing high upfront costs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems’ Extreme Weather Resilience

We present scalable stochastic optimization approaches for improving power systems’ resilience to extreme weather events. We consider both proactive redispatch and transmission line hardening as alternatives for mitigating expected load shed due to extreme weather, resulting in large-scale stochastic linear programs (LPs) and mixed-integer linear programs (MILPs). We solve these stochastic optimization problems with progressive hedging (PH), a parallel, scenario-based decomposition algorithm. Our computational experiments indicate that our proposed method for enhancing power system resilience can provide high-quality solutions efficiently. With up to 128 scenarios on a 2,000-bus network, the operations (redispatch) and investment (hardening) resilience problems can be solved in approximately 6 min and 2 h of wall-clock time, respectively. Additionally, we solve the investment problems with up to 512 scenarios, demonstrating that the approach scales very well with the number of scenarios. Moreover, the method produces high quality solutions that result in statistically significant reductions in expected load shed. Our proposed approach can be augmented to incorporate a variety of other operational and investment resilience strategies, or a combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unlocking load growth at the grid edge: Practices for managing, recovering, and allocating distribution system investments

Utilities and utility regulators are preparing to make significant investments in the electricity distribution system driven by expected load growth in coming years and decades. Regulators will be tasked with vetting investment proposals and implementing cost recovery and allocation mechanisms. In particular, state regulators are anticipating the need to make proactive distribution system investments, building the capability to serve new load in advance of demand. This report focuses on load growth from homes and businesses that adopt electric vehicles and heat pump heating technologies. Through a review of legislation and regulatory dockets in a subset of states, we provide insights into emerging utility and regulatory practices to recover and allocate costs of electrification-driven distribution system investments necessary to accommodate these technologies. Our review focused on utility electrification programs, line extension policies, and proactive investments. Our report is largely descriptive, offering detailed information about approaches different state commissions and utilities have implemented to inform future decision-making.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydroclimate-coupled framework for assessing power system resilience under summer drought and climate change

Extreme drought, exacerbated by climate change, increasingly threatens power system resilience, and a systematic assessment of such impacts is challenging due to the unpredictability of drought and their associated modeling complexity. Here, to address the challenge, this research develops a hydroclimate-coupled power system resilience assessment framework that enables systematic modeling of drought and climate change impacts on generation, transmission, and demand sectors. Applying the framework to the 2025 Eastern U.S. power grid — comprising 6,055 at-risk generators — under climate-induced summer drought scenarios (including SSP126, SSP245, SSP370, and SSP585) from 2023 to 2100, the study finds that climate-induced droughts could jeopardize the power system’s reliability to a greater extent than historical events, potentially leading to widespread load shedding. More specifically, the study reveals that under the twenty-one representative drought scenarios, the loss of load expectation (LOLE) of the grid could range from 34.77 to 91.48 days per summer. The simulations indicate that implementing resilience enhancement strategies is crucial to ensure reliable system operation, which encompasses initiatives such as demand response, upgrading open cooling systems, and transmission expansion. In all, these findings underscore the urgent need for proactive planning and investment in resilient U.S. power systems to mitigate the impacts of extreme drought events.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hourly Load Profile Dataset for Electric Transit Bus Depots in the United States

Transit buses operate primarily in dense urban areas, where nearby populations face increased exposure to fine particulates, nitrogen oxides, and other harmful pollutants. Electrifying transit buses presents a clear opportunity to reduce greenhouse gas emissions and improve urban air quality. However, widespread adoption may pose significant energy and infrastructure challenges, which can be mitigated through proactive planning and investment. This report presents a robust modeling framework and an initial estimation of the hourly electricity demand at transit bus depots across the United States. The resulting depot-level dataset, available at data.nrel.gov/submissions/282, provides valuable insights for infrastructure planning and electricity demand forecasting, supporting the scalable electrification of transit bus fleets nationwide.

33 ADVANCED PROPULSION SYSTEMS↗

Performance Metrics to Evaluate Utility Resilience Investments

In 2019, Sandia National Laboratories (Sandia) contracted Synapse Energy Economics (Synapse) to research the integration of community and electric grid resilience investment planning as part of the Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis (BCA), performance metrics, microgrids, and regulatory mechanisms. This report focuses on BCA. BCA is an approach that electric utilities, electric utility regulators, and communities can use to evaluate the costs and benefits of a wide range of grid resilience investments in a comprehensive and consistent way. While BCA is regularly applied to some types of grid investments, application of BCA to grid resilience investments is in the early stages of development. Though resilience is increasingly cited in connection with grid investment proposals and plans, the resilience- related costs and benefits of grid resilience investments are typically not fully identified, infrequently quantified, and almost never monetized. Without complete assessments of costs and benefits, regulators can be hesitant to approve some types of grid resilience investments. This report provides the first application of the framework developed in the 2020 National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources (NSPM for DERs) to grid resilience investments. We provide guidance on next steps for implementation to enable grid resilience investments to receive due consideration. We suggest developing BCA principles and standards for jurisdiction-specific BCA tests. We also recommend identifying the resilience impacts of the investments and quantification of these impacts by establishing utility performance metrics for resilience. Proactive integration of grid resilience investments into existing regulatory processes and practices can increase the capacity of jurisdictions to respond to and recover from the consequences of extreme events. 1 National Energy Screening Project. 2020. National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proactive Regulatory Approaches to Electrification and Load Growth: Workshop Report

On July 10 and 11, 2024, Pacific Northwest National Laboratory and RMI led a workshop in Aurora, Colorado, to explore novel and proactive approaches to electrification and load growth while minimizing risks and costs to customers. Over the next decade, a unique opportunity exists to invest strategically in the electricity system to enable electrification across the transportation, industrial, and building sectors and respond to data and technology-based load growth. However, current utility and regulatory planning practices are insufficient to identify and enable the right investments, and work must be done to reduce the risk and decisional uncertainty faced by utility regulatory commissions and utilities. Ensuring timely electrification investments may require new approaches to address risk, uncertainty, prudence, and cost recovery. Understanding the decision-making process and information needs of utilities and regulators is critical. New policies (or application of policies), financial tools, systems analysis, regulatory mechanisms, and enhanced process transparency may be required. The workshop's goal was to identify proactive regulatory approaches for electrification and load growth that minimize costs and risks to customers. Our intention was that the conversations and the resulting solutions and takeaways would be specific and tactical rather than general and theoretical and that together we would create actionable next steps for key actors in the system, including utilities, regulators, thought leaders, researchers, and the U.S. Department of Energy (DOE). This report is intended to provide workshop attendees with a record and summary of the discussion and proposals raised at the workshop and to provide interested entities who did not attend, such as other regulators, policymakers, utilities, and U.S. DOE offices, with an understanding of what was discussed and with ideas to explore in their organizations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-State Transportation Electrification Impact Study: Preparing the Grid for Light-, Medium-, and Heavy-Duty Electric Vehicles

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Electric Distribution System Planning with DERs - High-level Assessment of Tools and Methods

This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning an Effective Speakers Outreach Program

The National Aeronautics and Space Administration (NASA) and, in particular, the Marshall Space Flight Center (MSFC) have played pivotal roles in the advancement of space exploration and space-related science and discovery since the early 1960's. Many of the extraordinary accomplishments and advancements of NASA and MSFC have gone largely unheralded to the general public, though they often border on the miraculous. This lack of suitable and deserved announcement of these "miracles" seems to have occurred because NASA engineers and scientists are inclined to regard extraordinary accomplishment as a normal course of events. The goal in this project has been to determine an effective structure and mechanism for communicating to the general public the extent to which our investment in our US civilian space program, NASA, is, in fact, a very wise investment. The project has involved discerning important messages of truth which beg to be conveyed to the public. It also sought to identify MSFC personnel who are particularly effective as messengers or communicators. A third aspect of the project was to identify particular target audiences who would appreciate knowing the facts about their NASA investment. The intent is to incorporate the results into the formation of an effective, proactive MSFC speakers bureau. A corollary accomplishment for the summer was participation in the formation of an educational outreach program known as Nasa Ambassadors. Nasa Ambassadors are chosen from the participants in the various MSFC summer programs including: Summer Faculty Fellowship Program (SFFP), Science Teacher Enrichment Program (STEP), Community College Enrichment Program (CCEP), Joint Venture (JOVE) program, and the NASA Academy program. NASA Ambassadors agree to make pre-packaged NASA-related presentations to non-academic audiences in their home communities. The packaged presentations were created by a small cadre of participants from the 1996 MSFC summer programs, volunteering their time beyond their normal NASA summer research commitment. A total of eight presentations were created and made available for use by NASA Ambassadors. A major segment of the research effort during the summer has been devoted to verifying and documenting certain "spinoff' contributions of NASA technology and in determining their relevance and impact to our society and our nation's economy. The purpose behind the verification/documentation research has been to shed light on the question of whether or not our NASA investment is a wise investment. It has revealed that NASA is a wise investment.

McDonald, Malcolm W.↗

Liquid Rocket Engine Testing

Comprehensive Liquid Rocket Engine testing is essential to risk reduction for Space Flight. Test capability represents significant national investments in expertise and infrastructure. Historical experience underpins current test capabilities. Test facilities continually seek proactive alignment with national space development goals and objectives including government and commercial sectors.

Rahman, Shamim↗

Proactive Regulatory Approaches to Electrification and Load Growth: Pre-read Document to Support the July 10-11 th Workshop

This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ready for Renewables: Grid Planning and Competitive Renewable Energy Zones (CREZ) in the Philippines

The Department of Energy of the Philippines launched the competitive renewable energy zones (CREZ) process to help achieve the country's goals of scaling up renewable energy generation on the power system and to ensure sustainable, secure, reliable, accessible, and affordable energy. The CREZ process identifies the most economic renewable energy resource areas so transmission planning and expansion can accelerate their development. By proactively focusing transmission expansion to these resource areas, renewable energy generation development obstacles such as transmission access, energy curtailment, land permitting (such as protected or high-slope areas), and regulatory barriers are easier to overcome thus, reducing risk for private sector renewable energy investment. This report is will cover the outputs of the CREZ process, the development of the outputs through stakeholder-driven coordination, and how this process will help the Philippines achieve their renewable energy goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Strategic Plan for NASA JSC's Technology Investments

Human space exploration has always been heavily influenced by goals to achieve a specific mission on a specific schedule. This approach drove rapid technology development, the rapidity of which adds risks as well as provides a major driver for costs. The National Aeronautics and Space Administration (NASA) is now approaching the extension of human presence throughout the solar system by balancing a proactive yet less schedule-driven development of technology with opportunistic scheduling of missions as the needed technologies are realized. This approach should provide cost effective, low risk technology development that will enable efficient and effective manned spaceflight missions. As a first step, the NASA Human Spaceflight Architecture Team (HAT) has identified a suite of critical technologies needed to support future manned missions across a range of destinations, including in cislunar space, near earth asteroid visits, lunar exploration, Mars space, and Mars exploration. The challenge now is to develop a strategy and plan for technology development that efficiently enables these missions over a reasonable time period, without increasing technology development costs unnecessarily due to schedule pressure, and subsequently mitigating development and mission risks. NASA fs Johnson Space Center (JSC), as the nation's primary center for human exploration, is addressing this challenge through an innovative approach allocating Internal Research and Development funding to projects that have been prioritized using four focus criteria, with appropriate importance weighting. These four focus criteria are the Human Space Flight Technology Needs, JSC Core Technology Competencies, Commercialization Potential, and Partnership Potential. The inherent coupling in these focus criteria have been captured in a database and have provided an initial prioritization for allocation of technology development research funding. This paper will describe this process and this database, and the preliminary technology development prioritization results.

Stecklein, Jonette M.↗

In-Time System-Wide Safety Assurance (ISSA) Concept of Operations

Emerging operations involving Urban Air Mobility (UAM) poses a challenge to safety assurance and accessibility to the NAS. In particular, the public has a low tolerance for risk in aviation and the current NAS tends to be labor-intensive with limited ability to scale up for UAM. In response to this landscape, NASA is collaborating with industry to define an In-time Aviation Safety Management System (IASMS) Concept of Operations (ConOps) for a scalable UAM along with a service-oriented architecture. This architecture would better focus safety investments for technological solutions that overcome safety related barriers for emerging operations. By working with industry, consensus can be reached on desirable system traits that are based on integration of data and leverage increasingly autonomous and automated systems. These complex systems can identify anomalies, precursors, and trends that together enable more proactive management of operational risks.

Ellis, Kyle↗