Search NASA⌕ Search

SEARCH · Search NASA

Results for “proactive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs

The increasing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electric grids. Often, this pressure leads to electrical component failures, which might ignite wildfires. This work develops a novel model to balance the reliability of power network operations and the risk of wildfire ignition by opti- mizing the operational schedule of power transmission networks considering time-varying risk measures that include exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfire risk. The results demonstrate the ability of the model to significantly reduce wildfire risk without considerable load shedding.

power systems operations↗

IRIS: A Performance-Portable Framework for Cross-Platform Heterogeneous Computing

From edge to exascale, computer architectures are becoming more heterogeneous and complex. The systems typically have fat nodes, with multicore CPUs and multiple hardware accelerators such as GPUs, FPGAs, and DSPs. This complexity is causing a crisis in programming systems and performance portability. Several programming systems are working to address these challenges, but the increasing architectural diversity is forcing software stacks and applications to be specialized for each architecture. As we show, all of these approaches critically depend on their software framework for discovery, execution, scheduling, and data orchestration. To address this challenge, we believe that a more agile and proactive software framework is essential to increase performance portability and improve user productivity. To this end, we have designed and implemented IRIS: a performance-portable framework for cross-platform heterogeneous computing. IRIS can discover available resources, manage multiple diverse programming platforms (e.g., CUDA, Hexagon, HIP, Level Zero, OpenCL, OpenMP) simultaneously in the same execution, respect data dependencies, orchestrate data movement proactively, and provide for user-configurable scheduling. To simplify data movement, IRIS introduces a shared virtual device memory with relaxed consistency among different heterogeneous devices. IRIS also adds an automatic kernel workload partitioning technique using the polyhedral model so that it can resize kernels for a wide range of devices. Our evaluation on three architectures, ranging from Qualcomm Snapdragon to a Summit supercomputer node, shows that IRIS improves portability across a wide range of diverse heterogeneous architectures with negligible overhead.

97 MATHEMATICS AND COMPUTING↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

Integrating Survival Analysis with Bayesian Statistics to Forecast the Remaining Useful Life of a Centrifugal Pump Conditional to Multiple Fault Types

To improve the viability of nuclear power plants, there is a need to reduce their operational costs. Operational costs account for a significant portion of a plant’s yearly budget, due to their scheduled-based maintenance approach. In order to reduce these costs, proactive methods are required that estimate and forecast the state of a machine in real time to optimize maintenance schedules. In this research, we use Bayesian networks to develop a framework that can forecast the remaining useful life of a centrifugal pump. To do so, we integrate survival analysis with Bayesian statistics to forecast the health of the pump conditional to its current state. We complete our research by successfully using the Bayesian network on a case study. This solution provides an informed probabilistic viewpoint of the pumping system for the purpose of predictive maintenance.

42 ENGINEERING↗

Predictive Model for Starlink Maritime Performance Using Multi-Horizon RandomForest

Low Earth orbit (LEO) satellite systems have become a crucial enabler of broadband access for maritime industries, where traditional networks are unavailable. However, the high mobility of LEO constellations and constantly changing weather conditions result in unpredictable link fluctuations, limiting the ability of maritime platforms to plan bandwidth usage proactively. To the best of our knowledge, no prior work has developed a short-term predictive model for maritime LEO connectivity using real experimental field measurements. This paper proposes a data-driven forecasting model that predicts future downlink throughput using multi-horizon RandomForest regression. The model is trained using real experimental coastal measurement data incorporating recent throughput history, network-layer indicators, and environmental variables. The proposed approach reduces mean absolute error by approximately 31% compared to a persistence baseline for 15-minute horizons. It maintains a measurable improvement at 30 minutes, despite increased stochasticity. These findings confirm that proactive bandwidth awareness is feasible on maritime platforms and can effectively support operational decisions such as adaptive streaming, routing, and resource scheduling. The performance gap between forecasting horizons also highlights the need for expanded offshore datasets to improve prediction robustness under harsher maritime environments.

97 MATHEMATICS AND COMPUTING↗

Vector-level feedforward control of LPBF melt pool area using a physics-based thermal model

Laser powder bed fusion (LPBF) is an additive manufacturing technique that has gained popularity thanks to its ability to produce geometrically complex, fully dense metal parts. However, these parts are prone to internal defects and geometric inaccuracies, stemming in part from variations in the melt pool. Here, this paper proposes a novel vector-level feedforward control framework for regulating melt pool area in LPBF. By decoupling part-scale thermal behavior from small-scale melt pool physics, the controller provides a scale-agnostic prediction of melt pool area and efficient optimization over it. This is done by operating on two coupled lightweight models: a finite-difference thermal model that efficiently captures vector-level temperature fields and a reduced-order, analytical melt pool model. Each model is calibrated separately with minimal single-track and 2D experiments, and the framework is validated on a complex 3D geometry in both Inconel 718 and 316L stainless steel. Results showed that feedforward vector-level laser power scheduling reduced geometric inaccuracy in key dimensions by 62%, overall porosity by 16.5%, and photodiode root-mean-squared deviation by 38.5% on average. Overall, this modular, data-efficient approach demonstrates that proactively compensating for known thermal effects can significantly improve part quality while remaining computationally efficient and readily extensible to other materials and machines.

Additive manufacturing↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Connecting the Dots: An Assessment of Cyber-risks in Networked Building and Municipal Infrastructure Systems

The buildings and city streets we walk down are changing. Driven by various data-driven use cases, there is increased interest in networking and integrating lighting and other building systems (e.g., heating, ventilation, and air conditioning (HVAC), security, scheduling) that were previously not internet-facing, and equipping them with sensors that collect information about their environment and the people that inhabit it. These data-enabled systems can potentially deliver improved occupant and resident experiences and help meet the U.S. Department of Energy (DOE) national energy and carbon reduction goals. Deploying connected devices new to being networked, however, is not without its challenges. This paper explores tools available to system designers and integrators that facilitate a cybersecurity landscape assessment – or more specifically the identification of threats, vulnerabilities, and adversarial behaviors that could be used against these networked systems. These assessments can help stakeholders shift security prioritization proactively toward the beginning of the development process.

cyber-risk assesment, adversarial behavior, MITRE ↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗