Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic load margin”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Data-Driven Nonparametric Approach for Probabilistic Load-Margin Assessment Considering Wind Power Penetration

A modern power system is characterized by an increasing penetration of wind power, which results in large uncertainties in its states. These uncertainties must be quantified properly; otherwise, the system security may be threatened. Facing this challenge, here we propose a cost-effective, data-driven approach to assessing a power system's load margin probabilistically. Using actual wind data, a kernel density estimator is applied to infer the nonparametric wind speed distributions, which are further merged into the framework of a vine copula. The latter enables us to simulate complex multivariate and highly dependent model inputs with a variety of bivariate copulae that precisely represent the tail dependence in the correlated samples. Furthermore, to reduce the prohibitive computational time of traditional Monte-Carlo simulations that process a large amount of samples, we propose to use a nonparametric, Gaussian-process-emulator-based reduced-order model to replace the original complicated continuation power-flow model through a Bayesian-learning framework. To accelerate the convergence rate of this Bayesian algorithm, a truncated polynomial chaos surrogate, which serves as a highly efficient, parametric Bayesian prior, is developed. This emulator allows us to execute the time-consuming continuation power-flow solver at the sampled values with a negligible computational cost. Results of simulations that are performed on several test systems reveal the impressive performance of the proposed method in the probabilistic load-margin assessment.

17 WIND ENERGY↗

Interpretable Data-Driven Probabilistic Power System Load Margin Assessment with Uncertain Renewable Energy and Loads

The increasing uncertainties caused by the high-penetration of stochastic renewable generation resources poses a significant threat to the power system voltage stability. To address this issue, this paper proposes a probabilistic deep kernel learning enabled surrogate model to extract the hidden relationship between uncertain sources, i.e., wind power and loads, and load margin for probabilistic load margin assessment (PLMA). Unlike other deep learning approaches, a kernel SHAP provides the sensitivity analysis as well as interpretability of the inputs to outputs influences. This allows identifying the critical factors that affect load margin so that corrective control can be initiated for stability enhancement. Numerical results carried out on the IEEE 118-bus power system demonstrate the accuracy and efficiency of the proposed data-driven PLMA scheme.

deep kernel learning↗

Quantifying Safety Margin Using the Risk-Informed Safety Margin Characterization (RISMC)

The Risk-Informed Safety Margin Characterization (RISMC), developed by Idaho National Laboratory as part of the Light-Water Reactor Sustainability Project, utilizes a probabilistic safety margin comparison between a load and capacity distribution, rather than a deterministic comparison between two values, as is usually done in best-estimate plus uncertainty analyses. The goal is to determine the failure probability, or in other words, the probability of the system load equaling or exceeding the system capacity. While this method has been used in pilot studies, there has been little work conducted investigating the statistical significance of the resulting failure probability. In particular, it is difficult to determine how many simulations are necessary to properly characterize the failure probability. This work uses classical (frequentist) statistics and confidence intervals to examine the impact in statistical accuracy when the number of simulations is varied. Two methods are proposed to establish confidence intervals related to the failure probability established using a RISMC analysis. The confidence interval provides information about the statistical accuracy of the method utilized to explore the uncertainty space, and offers a quantitative method to gauge the increase in statistical accuracy due to performing additional simulations.

Grabaskas, David↗

Integration of Reliability with Mechanistic Thermalhydraulics: Report on Approach and Test Problem Results

The Risk-Informed Safety Margin Characterization (RISMC) pathway of the Light Water Reactor Sustainability Program is developing simulation-based methods and tools for analyzing safety margin from a modern perspective. There are multiple definitions of "margin." One class of definitions defines margin in terms of the distance between a point estimate of a given performance parameter (such as peak clad temperature), and a point-value acceptance criterion defined for that parameter (such as 2200° F). The present perspective on margin is that it relates to the probability of failure, and not just the distance between a nominal operating point and a criterion. In this work, margin is characterized through a probabilistic analysis of the "loads" imposed on systems, structures, and components, and their "capacity" to resist those loads without failing. Given the probabilistic load and capacity spectra, one can assess the probability that load exceeds capacity, leading to component failure. Within the project, we refer to a plot of these probabilistic spectra as "the logo." Refer to Figure 1 for a notional illustration. The implications of referring to "the logo" are (1) RISMC is focused on being able to analyze loads and spectra probabilistically, and (2) calling it "the logo" tacitly acknowledges that it is a highly simplified picture: meaningful analysis of a given component failure mode may require development of probabilistic spectra for multiple physical parameters, and in many practical cases, "load" and "capacity" will not vary independently.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Severe Transient Analysis for Prevention Technical Program Plan

This document outlines the development of a high fidelity, best estimate nuclear power plant severe transient simulation capability that will complement or enhance the integral system codes historically used for licensing and analysis of severe accidents. As with other tools in the Risk Informed Safety Margin Characterization (RISMC) Toolkit, the ultimate user of Enhanced Severe Transient Analysis and Prevention (ESTAP) capability is the plant decision-maker; the deliverable to that customer is a modern, simulation-based safety analysis capability, applicable to a much broader class of safety issues than is traditional Light Water Reactor (LWR) licensing analysis. Currently, the RISMC pathway’s major emphasis is placed on developing RELAP-7, a next-generation safety analysis code, and on showing how to use RELAP-7 to analyze margin from a modern point of view: that is, by characterizing margin in terms of the probabilistic spectra of the “loads” applied to systems, structures, and components (SSCs), and the “capacity” of those SSCs to resist those loads without failing. The first objective of the ESTAP task, and the focus of one task of this effort, is to augment RELAP-7 analyses with user-selected multi-dimensional, multi-phase models of specific plant components to simulate complex phenomena that may lead to, or exacerbate, severe transients and core damage. Such phenomena include: coolant crossflow between PWR assemblies during a severe reactivity transient, stratified single or two-phase coolant flow in primary coolant piping, inhomogeneous mixing of emergency coolant water or boric acid with hot primary coolant, and water hammer. These are well-documented phenomena associated with plant transients but that are generally not captured in system codes. They are, however, generally limited to specific components, structures, and operating conditions. The second ESTAP task is to similarly augment a severe (post-core damage) accident integral analyses code with high fidelity simulations that would allow investigation of multi-dimensional, multi-phase containment phenomena that are only treated approximately in established codes.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Heartbeat Model for Component Failure in Simulation of Plant Behavior

As part of the Department of Energy’s “Light Water Reactor Sustainability Program” (LWRSP), tools and methodology for risk-informed characterization of safety margin are being developed for use in supporting decision-making on plant life extension after the first license renewal. Beginning with the traditional discussion of “margin” in terms of a “load” (a physical challenge to system or component function) and a “capacity” (the capability of that system or component to accommodate the challenge), we are developing the capability to characterize realistic probabilistic load and capacity spectra, reflecting both aleatory and epistemic uncertainty in system behavior. This way of thinking about margin comports with work done in the last 10 years. However, current capabilities to model in this way are limited: it is currently possible, but difficult, to validly simulate enough time histories to support quantification in realistic problems, and the treatment of environmental influences on reliability is relatively artificial in many existing applications. The INL is working on a next-generation safety analysis capability (widely referred to as “R7”) that will enable a much better integration of reliability-related and phenomenology-related aspects of margin. In this paper, we show how to implement cumulative damage (“heartbeat”) models for component reliability that lend themselves naturally to being included as part of the phenomenology simulation. Implementation of this modeling approach relies on the way in which the phenomenology simulation implements its dynamic time step management. Within this approach, component failures influence the phenomenology, and the phenomenology influences the component failures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ROBUSTNESS OF DECISION INSIGHTS UNDER ALTERNATIVE ALEATORY/EPISTEMIC UNCERTAINTY CLASSIFICATIONS

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A key technical challenge is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, would be founded on probabilistic characterizations of SSC performance. Evaluation of probabilistic safety margins will in general entail the uncertainty characterization both of the prospective challenge to the performance of an SSC ("load") and of its "capacity" to withstand that challenge. The RISMC framework contrasts sharply with the traditional probabilistic risk assessment (PRA) structure in that the underlying models are not inherently aleatory. Rather, they are largely deterministic physical/engineering models with ambiguities about the appropriate uncertainty classification of many model parameters. The current analysis demonstrates that if the distinction between epistemic and aleatory uncertainties is to be preserved in a RISMC-like modeling environment, then it is unlikely that analysis insights supporting decision-making will in general be robust under recategorization of input uncertainties. If it is believed there is a true conceptual distinction between epistemic and aleatory uncertainty (as opposed to the distinction being primarily a legacy of the PRA paradigm) then a consistent and defensible basis must be established by which to categorize input uncertainties.

probabilistic risk assessment↗

Characteristics of locational uncertainty marginal price for correlated uncertainties of variable renewable generation and demands

With the rapid increase of variable renewable energy sources in power systems, how to manage and price the uncertainty of renewable resources’ power outputs is becoming an urgent issue. Current market designs considering the uncertainties are mainly based on the probabilistic scenario set of demand and renewable energy resources power outputs. This consideration makes market designs vulnerable to three significant challenges when put into practice. First, the accurate probability distribution of renewable generation is hard to obtain in real-time. Second, it is challenging to clear the market timely with many scenarios to guarantee accuracy. Third, generation cost recovery cannot be guaranteed for some scenarios. To overcome these challenges, this paper proposes a locational uncertainty marginal price model to price the uncertainty explicitly based on a scenario-free stochastic market-clearing model. Instead of using the probabilistic scenario set, the uncertainty of renewable energy sources and loads is modeled with distributionally-robust chance constraints. The correlation of uncertainties can be endogenously modeled in both the market-clearing and the locational uncertainty marginal price formation. Furthermore, this paper proves that generation cost recovery, revenue adequacy, and partial market equilibrium can be achieved using the locational uncertainty marginal price model. Numerical results from both the small and large systems simulations validate that the generation cost recovery is maintained no matter the generation participates in uncertainty mitigation or not. The transmission congestion surplus is also allocated appropriately among loads, renewable energy sources, and financial transmission right owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk-Informed Safety Margin Characterization (RISMC): Integrated Treatment of Aleatory and Epistemic Uncertainty in Safety Analysis

The concept of “margin” has a long history in nuclear licensing and in the codification of good engineering practices. However, some traditional applications of “margin” have been carried out for surrogate scenarios (such as design basis scenarios), without regard to the actual frequencies of those scenarios, and have been carried out with in a systematically conservative fashion. This means that the effectiveness of the application of the margin concept is determined in part by the original choice of surrogates, and is limited in any case by the degree of conservatism imposed on the evaluation. In the RISMC project, which is part of the Department of Energy’s “Light Water Reactor Sustainability Program” (LWRSP), we are developing a risk-informed characterization of safety margin. Beginning with the traditional discussion of “margin” in terms of a “load” (a physical challenge to system or component function) and a “capacity” (the capability of that system or component to accommodate the challenge), we are developing the capability to characterize probabilistic load and capacity spectra, reflecting both aleatory and epistemic uncertainty in system response. For example, the probabilistic load spectrum will reflect the frequency of challenges of a particular severity. Such a characterization is required if decision-making is to be informed optimally. However, in order to enable the quantification of probabilistic load spectra, existing analysis capability needs to be extended. Accordingly, the INL is working on a next-generation safety analysis capability whose design will allow for much more efficient parameter uncertainty analysis, and will enable a much better integration of reliability-related and phenomenology-related aspects of margin.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Online Analysis of Wind and Solar Part II: Transmission Tool

To facilitate wider penetration of renewable resources without compromising system reliability concerns arising from the lack of predictability of intermittent renewable resources, a tool for use by California Independent System Operator (CAISO) power grid operators was developed by Pacific Northwest National Laboratory (PNNL) in conjunction with CAISO with funding from California Energy Commission. The tool analyzes and displays the impacts of uncertainties in forecasts of loads and renewable generation on: (1) congestion, (2) voltage and transient stability margins, and (3) voltage reductions and reactive power margins. The impacts are analyzed in the base case and under user-specified contingencies. A prototype of the tool has been developed and implemented in software.

probabilistic load and wind forecasts↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Data-Driven Probabilistic Anomaly Detection for Electricity Market under Cyber Attacks

Information and communication technologies have been widely used in smart grid for efficient operation. However, these technologies are vulnerable to malicious cyber attacks, which may lead to severe reliability and economic issues. Recently, a variety of data-driven anomaly detection approaches have been explored to detect potential cyber attacks in smart grids. In this paper, we researched on the electricity market data aiming to identify anomalies from the locational marginal prices (LMPs) and provide a new indicator for potential cyber attacks in power grids. Specifically, a novel data-driven probabilistic anomaly detection framework is proposed for electricity market, which consists of three major components: long short-term memory (LSTM) based deterministic electricity price forecasting, probabilistic electricity price forecasting and anomaly detection. This framework is tested on a model-based electricity market simulator under two types of cyber attacks, i.e., load redistribution attack (LRA) and price responsive attack (PRA). Numerical results on the simulated LMPs show that the proposed framework is capable of detecting data anomalies over these attacks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Seismic fragility analysis for lateral supports of HTR-PM RPV - 18521

Since Fukushima accident, there has been increasing interest in China to study the risks of nuclear power plants under seismic events that are beyond the design basis. Two methodologies are commonly being adopted for this purpose, namely the seismic probabilistic risk assessment (SPRA) and the seismic margin assessment (SMA). Fragility analysis plays an important role as it not only provides fragility curves as input for the SPRA, but also can deduce HCLPF values for the SMA. In this paper, seismic fragilities of the lateral supports of the HTR-PM reactor pressure vessel (RPV) are studied. The lateral supports are crucial to the safety of HTR-PM RPV under seismic events. As they are located at a high elevation in the reactor building, it is expected they are one of the major contributors to the seismic risk of HTR-PM. The lateral supports are first briefly introduced in terms of structural features, load conditions and stress acceptance criteria in the engineering design. Their fragilities are then analyzed by identifying basic fragility analysis variables and determining values in terms of the median and standard deviations. The associated fragility curves are finally calculated and a HCLPF value is reported. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of global weather and climate model output to the design and operation of wind-energy systems

This project addressed the challenge of providing weather and climate information to support the operation, management and planning for wind-energy systems. The need for forecast information is extending to longer projection windows with increasing penetration of wind power into the grid and also with diminishing reserve margins to meet peak loads during significant weather events. Maintenance planning and natural gas trading is being influenced increasingly by anticipation of wind generation on timescales of weeks to months. Future scenarios on decadal time scales are needed to support assessment of wind farm siting, government planning, long-term wind purchase agreements and the regulatory environment. The challenge of making wind forecasts on these longer time scales is associated with a wide range of uncertainties in general circulation and regional climate models that make them unsuitable for direct use in the design and planning of wind-energy systems. To address this challenge, CFAN has developed a hybrid statistical/dynamical forecasting scheme for delivering probabilistic forecasts on time scales from one day to seven months using what is arguably the best forecasting system in the world (European Centre for Medium Range Weather Forecasting, ECMWF). The project also provided a framework to assess future wind power through developing scenarios of interannual to decadal climate variability and change. The Phase II research has successfully developed an operational wind power forecasting system for the U.S., which is being extended to Europe and possibly Asia.

54 ENVIRONMENTAL SCIENCES↗

ASME Design Code Rule Changes for Nuclear Graphite

The American Society of Mechanical Engineers Boiler Pressure and Vessel Code (ASME BPVC) Section III, Division 5, Article HHA-3000 outlines graphite core component and graphite core assembly design guidelines. Graphite core components are defined as ?components manufactured from graphite that are installed to form a graphite core assembly within the reactor pressure vessel of a high temperature, graphite moderated fission reactor.? (p. 413) Graphites? inherent defect distributions do not allow for deterministic material reliability. Rather, graphite has variable strength distributions which change by grade. Article HHA-3000 outlines two semi-probabilistic methods, the full and simplified assessments, which set design load limit targets for each of three component structural reliability classes. The Design Task Group was officially recognized as a specialized task group within ASME November of 2023, though we?ve been collaborating since 2022. The purpose of the Design Task Group is to correct, clarify, and make HHA-3000 function as intended. The Design Task Group will sunset once we?ve achieved our objectives. The Design Task Group was specifically told to not write new Code. While there may be more precise and more accurate methods to determine reliability targets, the current methods are conservative, relatively simple to implement, and have thus far been considered satisfactory for setting design reliability targets. Much of the ground-work to write proposal files and background documents for records to make the changes needed to achieve our objective have been completed. The Design Task Group has documented much of their work through papers, presentations, and memorandums. Three memorandums in which INL team members had substantial contributions are found in the Appendices: FEA Modeling for the Baseline Program, Evaluating the Effects on Margin of Updating the Threshold and Shape Parameters in the Full Assessment, and Interpretations of the Full and Simplified Assessments in ASME BPVC. Most of the on-going work to achieve the Design Task Group?s objective will be addressing comments on existing records and moving records through the balloting process. The Design Task Group met bi-weekly mostly through the end of FY2023. Since February 2024, the Design Task Group has mostly been completed with solving and documenting the technical issues associated with the assessments. Unless new tasks are identified, the remaining work of the Design Task Group will be political and editorial.

97 MATHEMATICS AND COMPUTING↗

Evaluating design safety margins in the American Society of Mechanical Engineers graphite core components design-by-analysis assessments

Graphite is an important material being used for core components in next-generation high-temperature gas-cooled nuclear reactors. The selection of graphite grade for a specific Designer is a complex task, dependent on reactor conditions, component functionality, and required reliability. The American Society of Mechanical Engineers (ASME) provides two semi-probabilistic design-by-analysis assessments to evaluate graphite core components against design reliability targets. The simplified assessment uses a 2-parameter Weibull distribution to describe the graphite grade’s tensile-strength distribution to establish component stress limits. The full assessment uses the 3-parameter Weibull distribution and a modified Weakest-Link Theory approach to calculate a component design probability of failure. The paper defines recommended assessment rules, which are the as-written simplified assessment and the full assessment with parameter lower bounds, the modulus update with threshold reduction, and the 2027 grouping rules. Code rules are applied to three grades: 2114, IG-110, and NBG-18. The baseline margin calculation is developed using the experimental tensile dogbone specimen. Percent margin is defined as the percent reduction in the median experimental load to obtain the allowable load per ASME assessments. Under the recommended rules, the SRC–1 margin in the simplified assessment ranged from 40.2 % to 52.7 % among the grades in this study and from 36.1 % to 49.8 % in the full assessment. The full assessment only decreases the margins by 2.5–4.5 % for the SRC-1 components and 0–1.5 % for the SRC-2 components for this baseline case. Margin is inversely related to material median strength (i.e., the strongest grade, 2114, has the lowest margin).

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-Hazard Advanced Seismic Probabilistic Risk Assessment Tools and Applications

Design of nuclear power plant (NPP) facilities to resist natural hazards has been a part of the regulatory process from the beginning of the NPP industry in the United States (US), but has evolved substantially over time. The original set of approaches and methods was entirely deterministic in nature and focused on a traditional engineering margins-based approach. However, over time probabilistic and risk-informed approaches were also developed and implemented in US Nuclear Regulatory Commission (NRC) guidance and regulation. A defense-in-depth framework has also been incorporated into US regulatory guidance over time. As a result, today, the US regulatory framework incorporates deterministic and probabilistic approaches for a range of different applications and for a range of natural hazard considerations. This framework will continue to evolve as a result of improved knowledge and newly identified regulatory needs and objectives, most notably in response to the NRC activities developed in response to the 2011 Fukushima accident in Japan. Although the US regulatory framework has continued to evolve over time, the tools, methods and data available to the US nuclear industry to meet the changing requirements have not kept pace. Notably, there is significant room for improvement in the tools and methods available for external event probabilistic risk assessment (PRA), which is the principal assessment approach used in risk-informed regulations and risk-informed decision-making applied to natural hazard assessment and design. This is particularly true if PRA is applied to natural hazards other than seismic loading. Development of a new set of tools and methods that incorporate current knowledge, modern best practice, and state-of-the-art computational resources would lead to more reliable assessment of facility risk and risk insights (e.g., the SSCs and accident sequences that are most risk-significant), with less uncertainty and reduced conservatisms.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗