At least 19 records

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

A Data-Driven Method for Adaptive Reserve Requirement Estimation via Probabilistic Net Load Forecasting

The University of Colorado Boulder Boulder, CO, 80309, USA With the increasing penetration of renewable energy, power systems are subject to more uncertainty. This makes power system reserve scheduling more challenging. Most of the current reserve requirement determination methods calculate reserve requirements based on historical data, which does not consider the real-time or future system uncertainty. In this paper, a data-driven method is developed to determine the non-spinning reserve requirement (NSRR) in the Electric Reliability Council of Texas (ERCOT) system. The method follows the procedure of the current ERCOT method while adaptively determining the NSRR based on probabilistic net load forecasts. Case studies with two years of ERCOT data show that the developed method significantly reduces the NSRR by introducing an adaptive temporal resolution and update rate. Sensitivity analysis with different forecasting and percentile thresholds indicates the flexibility of the developed method.

non-spinning reserve↗

Emulation With Uncertainty Quantification of Regional Sea‐Level Change Caused by the Antarctic Ice Sheet

Abstract Projecting regional sea‐level change under various climate‐change scenarios typically involves running forward simulations of the Earth's gravitational, rotational and deformational (GRD) response to ice‐mass change, which requires substantial computational cost if applied to probabilistic frameworks requiring thousands to millions of samples. Here we build emulators of regional sea‐level change at 27 coastal locations, due to the GRD effects associated with future Antarctic Ice Sheet mass change over the 21st century. The emulators are evaluated against a numerical sea‐level model applied to an ensemble of ice‐sheet model simulations of the Antarctic Ice Sheet through 2100. We build a physics‐based emulator using a recent sensitivity kernel approach and compare it to machine learning based emulators (neural network and conditional variational autoencoder methods). In order to quantify uncertainty, we derive well‐calibrated prediction intervals for regional sea‐level change via split‐conformal inference and linear regression, and show that Monte Carlo dropout does not yield well‐calibrated uncertainties in this instance. We also demonstrate substantial gains in computational efficiency using both the physics‐based emulator and neural networks in comparison to the numerical model for the complete regional sea‐level solution. Overall, we find the physics‐based emulator modestly outperforms the machine learning emulators for this problem.

58 GEOSCIENCES↗

System risk quantification and decision making support using functional modeling and dynamic Bayesian network

Risk-informed decision-making requires a probabilistic assessment of the likelihood of success of control action, given the system status. This paper presents a systematic state transition modeling approach integrating dynamic probabilistic risk assessment with a decision-making process using a dynamic Bayesian network (DBN) coupled with functional modeling. A functional model designed with multilevel flow modeling (MFM) technique was used to build a system state structure inferred by energy, mass, and information flow so that one can verify the developed model with respect to system functionality. The MFM model represents the causal relationship among the nodes, which captures the structure of process parameters and control units. Each node may have multiple possible states, and the DBN structured by the MFM model represents the time-domain transitions among the defined states. Furthermore, the MFM-DBN integrated state transition modeling is a white-box approach that allows one to draw the system's risk profile by updating the system states and supports the decisions probabilistically with physical inference. An example of a simple heating system has been used to illustrate this process, including decision-making support based on quantitative risk profile. For demonstrating its applicability to a complex system operational decision making, a case study of station blackout accident scenario leading to the seal loss of coolant accident in a nuclear power plant is presented. The proposed approach effectively provided the risk profile along time for each option so that the operators can make the best decision, which minimizes the plant risk.

42 ENGINEERING↗

Optimizing High Performance Markov Clustering for Pre-Exascale Architectures

HipMCL is a high-performance distributed memory implementation of the popular Markov Cluster Algorithm (MCL) and can cluster large-scale networks within hours using a few thousand CPU-equipped nodes. It relies on sparse matrix computations and heavily makes use of the sparse matrix-sparse matrix multiplication kernel (SpGEMM). The existing parallel algorithms in HipMCL are not scalable to Exascale architectures, both due to their communication costs dominating the runtime at large concurrencies and also due to their inability to take advantage of accelerators that are increasingly popular. In this work, we systematically remove scalability and performance bottlenecks of HipMCL. We enable GPUs by performing the expensive expansion phase of the MCL algorithm on GPU. Additionally, we propose a CPU-GPU joint distributed SpGEMM algorithm called pipelined Sparse SUMMA and integrate a probabilistic memory requirement estimator that is fast and accurate. Furthermore, we develop a new merging algorithm for the incremental processing of partial results produced by the GPUs, which improves the overlap efficiency and the peak memory usage. We also integrate a recent and faster algorithm for performing SpGEMM on CPUs. We validate our new algorithms and optimizations with extensive evaluations. With the enabling of the GPUs and integration of new algorithms, HipMCL is up to 12.4x faster, being able to cluster a network with 70 million proteins and 68 billion connections just under 15 minutes using 1024 nodes of ORNL's Summit supercomputer.

97 MATHEMATICS AND COMPUTING↗

Robotic Planning under Uncertainty in Spatiotemporal Environments in Expeditionary Science

In the expeditionary sciences, spatiotemporally varying environments -- hydrothermal plumes, algal blooms, lava flows, or animal migrations -- are ubiquitous. Mobile robots are uniquely well-suited to study these dynamic, mesoscale natural environments. We formalize expeditionary science as a sequential decision-making problem, modeled using the language of partially-observable Markov decision processes (POMDPs). Solving the expeditionary science POMDP under real-world constraints requires efficient probabilistic modeling and decision-making in problems with complex dynamics and observational models. Previous work in informative path planning, adaptive sampling, and experimental design have shown compelling results, largely in static environments, using data-driven models and information-based rewards. However, these methodologies do not trivially extend to expeditionary science in spatiotemporal environments: they generally do not make use of scientific knowledge such as equations of state dynamics, they focus on information gathering as opposed to scientific task execution, and they make use of decision-making approaches that scale poorly to large, continuous problems with long planning horizons and real-time operational constraints. In this work, we discuss these and other challenges related to probabilistic modeling and decision-making in expeditionary science, and present some of our preliminary work that addresses these gaps. We ground our results in a real expeditionary science deployment of an autonomous underwater vehicle (AUV) in the deep ocean for hydrothermal vent discovery and characterization. Our concluding thoughts highlight remaining work to be done, and the challenges that merit consideration by the reinforcement learning and decision-making community.

Preston, Victoria↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Probabilistic Impact Assessment and Software Tool Requirements

This research project will address the most pressing uncertainties in modeling and measuring the electric power grid effects of geomagnetic disturbances (GMDs) and the E3 portion of nuclear electromagnetic pulse (EMP). The primary goal is to help decision-makers in the electric power sector have the knowledge and tools they need to most effectively mitigate GMD effects on the North American electric grid, with a secondary focus on EMP response. Primary tasks will involve comprehensive modeling,

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating the Impacts of Climate Change on Hydrology in a Performance Assessment Model - 20403

The evidence of climate change is increasingly well-documented and impacts should be incorporated in performance assessment studies. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. Probabilistic modeling is a core requirement for quantifying uncertainty and evaluating its impacts. Not evaluating future climate states in a performance assessment because of the existence of uncertainty is contradictory to good modeling practices - the most uncertain issues and parameters require the most attention in effective probabilistic modeling. Excluding climate change limits development of modeling information that could aid in effective decision making. In this work we develop methods to use the output from hydrologic models and analysis of historical aerial imagery to quantify and implement the impacts of climate change on hydrologic processes at a nuclear waste site in West Valley, New York. Specifically, we used the HELP (Hydraulic Performance of Landfill Performance) model to characterize key hydrologic processes under both current and future climate conditions to assess the impacts of changing climate on hydrology. A suite of previous climatic models were reviewed and synthesized to produce a cohesive representation of the current state of knowledge of the impact of climate change on important model inputs such as precipitation. Output from the HELP simulations was coupled to the GoldSim model that was used to develop the Probabilistic Performance Assessment (PPA) approach through the application of a novel 'nearest neighbor' technique. First, several thousand realizations were generated from the HELP model using a Latin Hypercube experimental design to ensure adequate coverage of the parameter space of explanatory variables used to drive HELP. For example, porosity is a physical parameter that is used as an input to both HELP and the GoldSim PA model. We then ran sensitivity analysis (SA) algorithms on the output of HELP for each of the responses of interest. For each predictor, each time we build an SA model we get a different value for the sensitivity index (SI). From the collection of all the SA models, the average was computed among all of the SIs to represent the predictor within the context of the nearest neighbor approach. That is, we conduct SA on each HELP outcome for each scenario. This gives us parameter sensitivity indices for the outcomes. We average the parameter sensitivity indices across the outcomes to get the average SI for a scenario. For each realization that is generated from the Goldsim PA model, Goldsim generates random values for physical/empirical parameters that HELP uses as well. For each vector of physical/empirical parameters that Goldsim generates, the vector from the 5,000 HELP runs that is most 'similar' to the Goldsim vector is computed using the nearest neighbor approach. In this context 'similar' means minimization of the SA-weighted sum of the absolute differences among the 5,000 values computed for this statistic, where each value corresponds to a different HELP realization. In order to account for the impacts of climate change, this process was repeated using the spatially downscaled future climate projections. For each of the key parameters of interest, it was assumed that a linear change depicted the relationship between the values for the present day and those for 2100. In this way, the climatically-driven changes in key parameters used to inform the GoldSim model are quantified and incorporated into the PA model output for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data-Driven Computation of Probabilistic Marching Cubes for Efficient Visualization of Level-Set Uncertainty

Uncertainty visualization is an important emerging research area. Being able to visualize data uncertainty can help scientists improve trust in analysis and decision-making. However, visualizing uncertainty can add computational overhead, which can hinder the efficiency of analysis. In this paper, we propose novel data-driven techniques to reduce the computational requirements of the probabilistic marching cubes (PMC) algorithm. PMC is an uncertainty visualization technique that studies how uncertainty in data affects level-set positions. However, the algorithm relies on expensive Monte Carlo (MC) sampling for the multivariate Gaussian uncertainty model because no closed-form solution exists for the integration of multivariate Gaussian. In this work, we propose the eigenvalue decomposition and adaptive probability model techniques that reduce the amount of MC sampling in the original PMC algorithm and hence speed up the computations. Our proposed methods produce results that show negligible differences compared with the original PMC algorithm demonstrated through metrics, including root mean squared error, maximum error, and difference images. We demonstrate the performance and accuracy evaluations of our data-driven methods through experiments on synthetic and real datasets.

Athawale, Tushar↗

Probabilistic Modeling of Climate Change Impacts on Renewable Energy and Storage Requirements for NM's Energy Transition Act (SAND Report)

This report provides a study of the potential impacts of climate change on intermittent renewable energy resources, battery storage, and resource adequacy in Public Service Company of New Mexico’s Integrated Resource Plan for 2020 – 2040. Climate change models and available data were first evaluated to determine uncertainty and potential changes in solar irradiance, temperature, and wind speed in NM in the coming decades. These changes were then implemented in solar and wind energy models to determine impacts on renewable energy resources in NM. Results for the extreme climate-change scenario show that the projected wind power may decrease by ~13% due to projected decreases in wind speed. Projected solar power may decrease by ~4% due to decreases in irradiance and increases in temperature in NM. Uncertainty in these climate-induced changes in wind and solar resources was accommodated in probabilistic models assuming uniform distributions in the annual reductions in solar and wind resources. Uncertainty in battery storage performance was also evaluated based on increased temperature, capacity fade, and degradation in round-trip efficiency. The hourly energy balance was determined throughout the year given uncertainties in the renewable energy resources and energy storage. The loss of load expectation (LOLE) was evaluated for the 2040 No New Combustion portfolio and found to increase from 0 days/year to a median value of ~2 days/year due to potential reductions in renewable energy resources and battery storage performance and capacity. A rank-regression analyses revealed that battery round-trip efficiency was the most significant parameter that impacted LOLE, followed by solar resource, wind resource, and battery fade. An increase in battery storage capacity to ~25,000 – 30,000 MWh from a baseline value of ~14,000 MWh was required to reduce the median value of LOLE to ~0.2 days/year with consideration of potential climate impacts and battery degradation.

54 ENVIRONMENTAL SCIENCES↗

Automated quantum error mitigation based on probabilistic error reduction

Current quantum computers suffer from a level of noise that prohibits extracting useful results directly from longer computations. The figure of merit in many near-term quantum algorithms is an expectation value measured at the end of the computation, which experiences a bias in the presence of hardware noise. A systematic way to remove such bias is probabilistic error cancellation (PEC). PEC requires a full characterization of the noise and introduces a sampling overhead that increases exponentially with circuit depth, prohibiting high-depth circuits at realistic noise levels. Probabilistic error reduction (PER) is a related quantum error mitigation method that systematically reduces the sampling overhead at the cost of reintroducing bias. In combination with zero-noise extrapolation, PER can yield expectation values with an accuracy comparable to PEC.Noise reduction through PER is broadly applicable to near-term algorithms, and the automated implementation of PER is thus desirable for facilitating its widespread use. To this end, we present an automated quantum error mitigation software framework that includes noise tomography and application of PER to user-specified circuits. We provide a multi-platform Python package that implements a recently developed Pauli noise tomography (PNT) technique for learning a sparse Pauli noise model and exploits a Pauli noise scaling method to carry out PER.We also provide software tools that leverage a previously developed toolchain, employing PyGSTi for gate set tomography and providing a functionality to use the software Mitiq for PER and zero-noise extrapolation to obtain error-mitigated expectation values on a user-defined circuit.

McDonough, Benjamin↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Digital polycrystalline microstructure generation using diffusion probabilistic models

Accurate micromechanical simulation of polycrystalline materials requires a realistic digital representation of the grain scale microstructure. Here, this work demonstrates the use of a generative diffusion probabilistic model for synthesizing single phase polycrystalline realizations. The model performs well and is capable of producing realistic microstructures consisting of not just simple equiaxed structures but also structures exhibiting more complex spatial arrangements. Masked microstructure generation reveals that the model is context aware of morphological descriptors which may be encoded in the latent space. Training on more diverse data sets, with scaled up architectures, may enable development of future models capable of synthesizing even more complex microstructural features.

36 MATERIALS SCIENCE↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Artificial-intelligence-driven shot reduction in quantum measurement

Variational Quantum Eigensolver (VQE) provides a powerful solution for approximating molecular ground state energies by combining quantum circuits and classical computers. However, estimating probabilistic outcomes on quantum hardware requires repeated measurements (shots), incurring significant costs as accuracy increases. Optimizing shot allocation is thus critical for improving the efficiency of VQE. Current strategies rely heavily on hand-crafted heuristics requiring extensive expert knowledge. This paper proposes a reinforcement learning (RL)-based approach that automatically learns shot assignment policies to minimize total measurement shots while achieving convergence to the minimum of the energy expectation in VQE. The RL agent assigns measurement shots across VQE optimization iterations based on the progress of the optimization. This approach reduces VQE's dependence on static heuristics and human expertise. When the RL-enabled VQE is applied to a small molecule, a shot reduction policy is learned. The policy demonstrates transferability across systems and compatibility with other wavefunction Ansätze. In addition to these specific findings, this work highlights the potential of RL for automatically discovering efficient and scalable quantum optimization strategies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗