Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Ames-Lockheed orbiter processing scheduling system

A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

Zweben, Monte↗

A computer method for schedule processing and quick-time updating.

A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.

Mccoy, W. H.↗

Coordinating, Scheduling, Processing and Analyzing IYA09

The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

Gipson, John↗

Uncertainty management by relaxation of conflicting constraints in production process scheduling

Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

Dorn, Juergen↗

Scheduling with partial orders and a causal model

In an ongoing project at Honeywell SRC, we are constructing a prototype scheduling system for a NASA domain using the 'Time Map Manager' (TMM). The TMM representations are flexible enough to permit the representation of precedence constraints, metric constraints between activities, and constraints relative to a variety of references (e.g., Mission Elapsed Time vs. Mission Day). The TMM also supports a simple form of causal reasoning (projection), dynamic database updates, and monitoring specified database properties as changes occur over time. The greatest apparent advantage to using the TMM is the flexibility added to the scheduling process: schedules are constructed by a process of 'iterative refinement,' in which scheduling decisions correspond to constraining an activity either with respect to another activity or with respect to one time line. The schedule becomes more detailed as activities and constraints are added. Undoing a scheduling decision means removing a constraint, not removing an activity from a specified place on the time line. For example, we can move an activity around on the time line by deleting constraints and adding new ones.

Boddy, Mark↗

Enhanced Software for Scheduling Space-Shuttle Processing

The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

Barretta, Joseph A.↗

Scheduling Onboard Processing for the Proposed HyspIRI Mission

The proposed Hyspiri mission is evaluating a X-band Direct Broadcast (DB) capability that would enable data to be delivered to ground stations virtually as it is acquired. However the HyspIRI VSWIR and TIR instruments will produce 1 Gbps data while the DB capability is 15 M bps for a ~60x oversubscription. In order to address this data volume mismatch a DB concept has been developed thatdetermines which data to downlink based on both: 1. The type of surface the spacecraft is overflying and 2. Onboard processing of the data to detect events. For example when the spacecraft is overflying polar regions it might downlink a snow/ice product. Additionally the onboard software will search for thermal signatures indicative of a volcanic event or wild fire and downlink summary information (extent, spectra) when detected. The process of determining which products to generate when, based on request prioritization and onboard processing and downlink constraints is inherently a prioritized scheduling problem - we describe work to develop an automated solution to this problem.

visible shortwave infrared (VSWIR)↗

Spacecraft Block Scheduling for NASA’s Deep Space Network

Currently, NASA’s Deep Space Network (DSN) is responsible for uplink to, downlink from, and/or tracking of dozens of missions for space agencies across the world. The DSN scheduling process starts about four months prior to the start of the schedule week, a process in which requirements are defined and then the schedule is created, de-conflicted, and negotiated over the next 2–3 weeks with a team of mission representatives. Now scheduled for late 2019, Exploration Mission1 (EM-1) will deploy upwards of 12 SmallSat missions that will be served by the DSN. This will increase the DSN’s actively serviced spacecraft by up to 30%, further increasing the difficulty of meeting all mission needs via the over subscribed network. To mitigate their impact on DSN scheduling, a block scheduling process is proposed for scheduling the SmallSats. Block scheduling consists of aggregating spacecraft together into larger “pseudo-spacecraft” based on geometric alignment that then follow the same process as any other DSN mission to receive segments of track time. These tracks are then decomposed into tracks for individual users based on their specific requirements. This paper describes a full novel scheduling tool set for building candidate blocks, evaluating the efficacy of these blocks, and optimal and suboptimal de-blocking schemes. To demonstrate these developed tools, results from three simulations are presented: a blocking example with lunar SmallSats, blocking potential in the greater DSN spacecraft catalog, and opportunistic multiple spacecraft per aperture potential for the DSN spacecraft catalog. Block scheduling has the potential to reduce overhead and scheduling resources for the EM-1 SmallSats while also providing them with a better means to meet their mission requirements.

Bilén, Sven G.↗

Integrated resource scheduling in a distributed scheduling environment

The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

Zoch, David↗

Scheduling message processing for reducing rollback propagation

Traditional checkpointing and rollback recovery techniques for parallel systems have typically assumed the communication pattern is specified by program behavior. In this paper we exploit the property that the communication pattern can often be changed at run-time without affecting program correctness. A scheduling algorithm for message processing and its implementation for reducing rollback propagation are described. The algorithm incorporates a user-transparent prioritized scheme based upon the run-time communication and checkpointing history. Communication trace-driven simulation for several parallel programs written in the Chare Kernel language demonstrates that the probability of rollback propagation can be reduced at the cost of slight additional performance degradation.

Wang, Yi-Min↗

Scheduling the NASA Deep Space Network with Deep Reinforcement Learning

With three complexes spread evenly across the Earth, NASA’s Deep Space Network (DSN) is the primary means of communications as well as a significant scientific instrument for dozens of active missions around the world. A rapidly rising number of spacecraft and increasingly complex scientific instruments with higher bandwidth requirements have resulted in demand that exceeds the network’s capacity across its 12 antennae. The existing DSN scheduling process operates on a rolling weekly basis and is time-consuming; for a given week, generation of the final baseline schedule of spacecraft tracking passes takes roughly 5 months from the initial requirements submission deadline, with several weeks of peer-to-peer negotiations in between. This paper proposes a deep reinforcement learning (RL) approach to generate candidate DSN schedules from mission requests and spacecraft ephemeris data with demonstrated capability to address real-world operational constraints. A deep RL agent is developed that takes mission requests for a given week as input, and interacts with a DSN scheduling environment to allocate tracks such that its reward signal is maximized. A comparison is made between an agent trained using Proximal Policy Optimization and its random, untrained counterpart. The results represent a proof-of-concept that, given a well-shaped reward signal, a deep RL agent can learn the complex heuristics used by experts to schedule the DSN. A trained agent can potentially be used to generate candidate schedules to bootstrap the scheduling process and thus reduce the turnaround cycle for DSN scheduling.

Wilson, Brian↗

Choosing a software design method for real-time Ada applications: JSD process inversion as a means to tailor a design specification to the performance requirements and target machine

The validity of real-time software is determined by its ability to execute on a computer within the time constraints of the physical system it is modeling. In many applications the time constraints are so critical that the details of process scheduling are elevated to the requirements analysis phase of the software development cycle. It is not uncommon to find specifications for a real-time cyclic executive program included to assumed in such requirements. It was found that prelininary designs structured around this implementation abscure the data flow of the real world system that is modeled and that it is consequently difficult and costly to maintain, update and reuse the resulting software. A cyclic executive is a software component that schedules and implicitly synchronizes the real-time software through periodic and repetitive subroutine calls. Therefore a design method is sought that allows the deferral of process scheduling to the later stages of design. The appropriate scheduling paradigm must be chosen given the performance constraints, the largest environment and the software's lifecycle. The concept of process inversion is explored with respect to the cyclic executive.

Withey, James V.↗

Characterization of Tactical Departure Scheduling in the National Airspace System

This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.

Capps, Alan↗

Space Shuttle Main Engine component assembly, assignment, and scheduling expert system

The SSME's Component Assembly and Life Management Expert System (CALMES) assists the engine assembly and scheduling process, ensuring that these activities utilize available resources with the greatest possible efficiency. On the basis of parts inventories and a proposed flight schedule, CALMES (1) determined how components may be optimally assembled from the parts inventory, (2) assigns components to flights, (3) schedules component testing, and (4) schedules component assembly. A graph-theoretical optimal matching algorithm, based on a modified simplex method, is applied to the major functions required by the SSME component assembly and scheduling processes.

Dietz, W. E.↗

CHARACTERIZING AND CONTROLLING RECOVERY AND RECRYSTALLIZATION IN NIOBIUM FOR IMPROVED SRF CAVITY PERFORMANCE

Crystal defects, such as dislocations and low-angle boundaries, provide sources of magnetic flux trapping in the Nb materials used for superconducting radio frequency (SRF) resonating cavities. Improving the performance of SRF cavities, as measured through the quality factor, requires reducing these defects. SRF cavity production involves deformation processing, such as rolling and forming, and strategic annealing heat treatments. The resulting microstructures can be recovered, recrystallized, or both. Because recovery leaves many defects that can trap flux, recrystallization should improve cavity performance. Thus, processing schedules that produce complete recrystallization without excessive grain growth need to be designed. Solutions to this problem require understanding physical metallurgy and differentiating between recovered and recrystallized regions of microstructure. Backscattered electron microscopy techniques are applied to this end. We demonstrate that the conditions required to produce fully recrystallized microstructures depend on Nb impurity content, suggesting that processing schedules may need to be adjusted by material heat or lot. We also demonstrate that processing can be used to control growth of recrystallized grains to maintain mechanical strength in fully recrystallized materials. Forming cavities from cold-rolled Nb sheet material may provide strategic new routes to obtain microstructures that improve SRF cavity performance.

Taleff, E. [The University of Texas at Austin]↗

Constraint monitoring in TOSCA

The Job-Shop Scheduling Problem (JSSP) deals with the allocation of resources over time to factory operations. Allocations are subject to various constraints (e.g., production precedence relationships, factory capacity constraints, and limits on the allowable number of machine setups) which must be satisfied for a schedule to be valid. The identification of constraint violations and the monitoring of constraint threats plays a vital role in schedule generation in terms of the following: (1) directing the scheduling process; and (2) informing scheduling decisions. This paper describes a general mechanism for identifying constraint violations and monitoring threats to the satisfaction of constraints throughout schedule generation.

Beck, Howard↗