Dielectric formulations for use in processing screened ceramic microcircuit substrates.
Material formulation, processing and firing techniques for screened ceramic microcircuit capacitors and conductor crossovers
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Material formulation, processing and firing techniques for screened ceramic microcircuit capacitors and conductor crossovers
One nemesis of the structural dynamist is the tedious task of reviewing large quantities of data. This data, obtained from various types of instrumentation, may be represented by oscillogram records, root-mean-squared (rms) time histories, power spectral densities, shock spectra, 1/3 octave band analyses, and various statistical distributions. In an attempt to reduce the laborious task of manually reviewing all of the space shuttle orbiter wideband frequency-modulated (FM) analog data, an automated processing system was developed to perform the screening process based upon predefined or predicted threshold criteria.
Pilot process for fabrication of screened resistors on ceramic substrates
An algorithm is developed to automatically screen the outliers from massive training samples for Global Land Survey - Imperviousness Mapping Project (GLS-IMP). GLS-IMP is to produce a global 30 m spatial resolution impervious cover data set for years 2000 and 2010 based on the Landsat Global Land Survey (GLS) data set. This unprecedented high resolution impervious cover data set is not only significant to the urbanization studies but also desired by the global carbon, hydrology, and energy balance researches. A supervised classification method, regression tree, is applied in this project. A set of accurate training samples is the key to the supervised classifications. Here we developed the global scale training samples from 1 m or so resolution fine resolution satellite data (Quickbird and Worldview2), and then aggregate the fine resolution impervious cover map to 30 m resolution. In order to improve the classification accuracy, the training samples should be screened before used to train the regression tree. It is impossible to manually screen 30 m resolution training samples collected globally. For example, in Europe only, there are 174 training sites. The size of the sites ranges from 4.5 km by 4.5 km to 8.1 km by 3.6 km. The amount training samples are over six millions. Therefore, we develop this automated statistic based algorithm to screen the training samples in two levels: site and scene level. At the site level, all the training samples are divided to 10 groups according to the percentage of the impervious surface within a sample pixel. The samples following in each 10% forms one group. For each group, both univariate and multivariate outliers are detected and removed. Then the screen process escalates to the scene level. A similar screen process but with a looser threshold is applied on the scene level considering the possible variance due to the site difference. We do not perform the screen process across the scenes because the scenes might vary due to the phenology, solar-view geometry, and atmospheric condition etc. factors but not actual landcover difference. Finally, we will compare the classification results from screened and unscreened training samples to assess the improvement achieved by cleaning up the training samples. Keywords:
High resistivity paste for screened printed circuit process - thallium oxide glass resistor paste and composition variation effect on resistor properties
As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches may occur that need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron. However the conjunction screening process in use by the 19th was developed over 30 years ago and was not designed with automation in mind, so screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process. Many operators assume that automated maneuver planning must be real-time; however this time between planning and execution to allow for screening is possible if planned for during system design. In an effort to speed up the screening process, NASA has developed a prototype system for performing near-real-time screenings. This prototype system was necessitated to support the NASA Starling mission, a constellation of 4 cubesats that planned to fly at the same altitude as the SpaceX Starlink constellation, both performing automated maneuvering. Without screening of the planned maneuvers, the two constellations risked a collision. Once converted from a prototype to an operational system, this capability will greatly help smallsats, for example those that are planning to test propulsive capabilities, by allowing fast turnaround feedback to ensure safety form collision with other objects. This paper describes the existing CA process, the prototype real-time capability, and results from the experiment that tested the prototype.
As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.
As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.
The fabrication process and transfer characteristics for solid state radiographic image transducers (radiographic amplifier screens) is described. These screens were developed for use in real time nondestructive evaluation procedures that require large format radiographic images with contrast and resolution capabilities unavailable with conventional fluoroscopic screens. This work was directed toward screens usable for inmotion, on-line radiographic inspection by means of closed circuit television.
A brief overview of the NASA-sponsored HSCT propulsion system studies is presented that includes objectives, approach, schedules, and a summary of interim results highlighting the NASA in-house studies. Seven propulsion system concepts have been considered to date and comparatively evaluated on a first-order basis using takeoff gross weight (TOGW) as the main discriminator. Only two concepts have been screened out thus far and it is apparent that TOGW is not a strong discriminator. However, the first-order screening process did not account for differences in propulsion installation effects or climb-noise suppression penalties-both of which may strongly influence the screening process.
This viewgraph presentation reviews the medical screening process and spacecraft launch and landing mission activities for astronauts. The topics include: 1) Launch and Landing Mission Overview; 2) Available Resources; and 3) Medical Screening Process.
NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.
NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.
Two process specifications supplied by contractors were tested. The aluminum silk screening process resulted in cells comparable to those from sputtered Al. The electroless plating of contacts specification could be used only with extensive modification. Several experiments suggest that there is some degradation of the front junction during the Al back surface field (BSF) fabrication. A revised process sequence was defined which incorporates Al BSF formation. A cost analysis of this process yielded a selling price of $0.75/watt peak in 1980.
This PFAS Site Assessment (SA) Report presents the activities and results associated with PFAS investigations at the Components Refurbishment and Chemical Analysis (CRCA) facility located at Kennedy Space Center (KSC), Florida. In 2022, CRCA was identified as an Area of Potential Concern because the facility stores several potential PFAS-containing chemicals. A groundwater sample collected from an onsite monitoring well detected PFOA and PFOS at concentrations greater than State of Florida provisional Groundwater Cleanup Target Levels (pGCTLs). PFAS SA activities were conducted between March 2022 and February 2024. During this timeframe, a total of 16 direct-push technology (DPT) locations and 82 discrete samples were collected from these locations, along with 90 monitoring well samples. The analytical data screening process focused on State of Florida pGCTLs and United States Environmental Protection Agency (USEPA) Regional Screening Level (RSLs) from November 2023 to evaluate the data. Analytical results identified PFOS, PFOA, and PFBA at concentrations exceeding their respective RSLs at each depth interval (shallow, intermediate, and deep). PFOS and PFOA had the largest footprint of RSL exceedances in each depth interval, but pGCTL exceedances were only observed at limited locations in the shallow and intermediate intervals. PFBA had the highest detections of any PFAS compound, with concentrations exceeding 180,000 nanograms per liter (ng/L), which is 100-times the RSL of 1,800 ng/L in the shallow and intermediate intervals and 10-times the RSL in the deep interval. The maximum PFBA detection was 841,000 ng/L at shallow monitoring well, MW0006. The PFAS SA also included samples collected from the onsite hydraulic containment system (HCS) which was installed to control and treat the onsite chlorinated volatile organic compound (CVOC) plume. Influent and effluent aqueous samples were collected monthly from the system. PFAS concentrations were relatively the same for both influent and effluent samples, indicating that while the HCS has been effective for CVOC treatment, it does not provide any additional treatment for PFAS compounds. Since the HCS has achieved its objectives, the system was shut down in December 2024. PFAS data gaps still exist, to include surface water and soil, which were not sampled during this SA. Soil sampling near the Chemical Process Area is recommended. Surface water and soil sampling at select stormwater outfalls is also recommended. Additionally, further groundwater sampling is recommended (DPT and monitoring well) in all depth intervals to delineate the extent of PFAS impacts at CRCA.
There are two distinct functions of the Behavioral Health and Performance (BHP) specialists at NASA Johnson Space Center (JSC), with a shared goal of promoting optimal performance during all mission phases, beginning with selection to the NASA Astronaut Corps through training for and completing a spaceflight mission. The BHP Operations team is active in areas such as selection, training, routine behavioral healthcare services, and work-rest schedule. The BHP Laboratory is engaged in research in space and analog platforms to address the risks and other challenges associated with future deep space missions. Their research focuses on topics that align with the NASA Human Research Program’s Human Factors Behavioral Performance Element goals. This panel will provide details of recent work by BHP Operations and the BHP Laboratory at NASA JSC, and will demonstrate their shared goals, and contributions toward, optimizing performance and maintaining the behavioral health and well-being of astronauts during all mission phases.In 2020-2021, NASA engaged another astronaut applicant screening process to identify its 23rd group of astronaut candidates. The BHP Operations team completed a significant amount of work to evaluate applicants and provide valuable input to the Astronaut Selection Board and the Aerospace Medical Board. One presentation will provide an overview of the work completed by BHP; and one presentation will discuss a critical competency important for successful job performance of the astronauts – Team Orientation. The former will summarize aspects of BHP’s Select-in and Select-out process and provide lessons learned for future selection cycles; the latter will briefly discuss the competencies of BHP’s applicant screening work, with focus on the importance of Team Orientation and the challenges of its measure. A third presentation will provide an overview of BHP’s current fatigue management work with astronauts and mission-critical operators at JSC (e.g., flight directors, pilots), and provide a look at the direction these fatigue management services may take in future exploration missions. Two other presentations will focus on the research completed by the BHP Lab to measure in a standardized way the critical aspects of behavioral health and well-being. One of the presentations will provide an overview of the Exploration Measures being collected during all space and analog missions, and the importance these objective measures have for future research and operations. The final presentation will summarize analyses completed with these measures, as they have been harmonized across both ISS and Analog missions.
Linear and nonlinear optical processing techniques (Fourier transformation, convolution and correlation, arithmetic operations - addition and subtraction with gratings, generalized orthogonal transformations; theta modulation, half-tone screen process, optical feedback) for mathematical computations are reviewed. The use of gratings and computer holograms in addition, subtraction, differentiation, and application of generalized transformations is discussed. Use of nonlinear optical elements with or without optical coherent feedback in such nonlinear operations as taking logarithms and thresholding is described. Applications in hybrid systems incorporating digital computer and optical processor with real-time interface devices, or optical threshold and logic devices for parallel processing to apply digital techniques to optical information are considered.
Statistical models developed to define the most likely sources of photovoltaic (PV) array failures and the optimum method of allowing for the defects in order to achieve a 20 yr lifetime with acceptable performance degradation are summarized. Significant parameters were the cost of energy, annual power output, initial cost, replacement cost, rate of module replacement, the discount rate, and the plant lifetime. Acceptable degradation allocations were calculated to be 0.0001 cell failures/yr, 0.005 module failures/yr, 0.05 power loss/yr, a 0.01 rate of power loss/yr, and a 25 yr module wear-out length. Circuit redundancy techniques were determined to offset cell failures using fault tolerant designs such as series/parallel and bypass diode arrangements. Screening processes have been devised to eliminate cells that will crack in operation, and multiple electrical contacts at each cell compensate for the cells which escape the screening test and then crack when installed. The 20 yr array lifetime is expected to be achieved in the near-term.