Search NASA⌕ Search

SEARCH · Search NASA

Results for “producer’s risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Simple Acceptance Decisions and Acceptance Risk

Acceptance risk may be estimated using cumulative probability distribution functions applied to populations of measurands and test measurement values. “Simple acceptance” is a decision rule that sets the acceptance range of a test result equal to the tolerance range specification. While acceptance risk is comprised of both consumer risk and producer risk, this paper compares the effects of simple acceptance decision rules and guardbanding decision rules on consumer risk. Consumer risk is also known as the probability of false acceptance. The terms describe the risk of accepting test results as passing when the actual values exceed specification limits. False acceptance is only possible when the true value of a measurand is out of tolerance and the test result indicates that the measurand is within tolerance. Metrologists generally have some information about the test uncertainty regarding a specific acceptance test result. Along with a general lack of knowledge regarding the measurand population parameters, the complicated interplay between risk, dispersion, and central values generally prevents calibration laboratories from fully characterizing acceptance probabilities. Organizations that model the measurand populations can reduce consumer risk by avoiding certification of items whose measurand populations are not well centered. The models in this paper present a recurring trend: guardbanding reduces nonnegligible risks of false acceptance when compared to simple acceptance. However, guardbanding is not the most effective means of acceptance risk mitigation. Systematic characterization of measurand populations can provide the information a calibration laboratory needs to reliably control acceptance risk.

42 ENGINEERING↗

IMPACT: Design of Integrated Multiphysics Producible Additive Components for Turbomachinery

The overall objective of the IMPACT program was to enable a dramatic reduction in design maturation time for an additive hot-section turbomachinery component through the following: • A fast crack-risk producibility surrogate model generated from machine learning applied to additive process simulation data generated via exascale computing, • Linking this surrogate model to multi-physics topology optimization (TO) to enable the creation of producible, near-optimal structural/thermal designs for additive hot-section components, • Maturing this toolset to reduce hot-section component design-for-manufacturing iterations by a large fraction, and eventually, • Using these tools to develop more efficient gas turbines in much shorter design cycle times.

42 ENGINEERING↗

Environmental and Economic Assessments and Uncertainties of Multiple Lignocellulosic Biomass Utilization for Bioenergy Products: Case Studies

Life-cycle assessment (LCA) and techno-economic analysis (TEA) were applied to assess the economic feasibility and environmental benefits of utilizing multiple biomass feedstocks for bioenergy products under three different technological pathways with consideration of uncertainties. Three cases were studied for the production of pellets, biomass-based electricity, and pyrolysis bio-oil. A Monte Carlo simulation was used to examine the uncertainties of fossil energy consumption, bioenergy conversion efficiency, stochastic production rate, etc. The cradle-to-gate LCA results showed that pellet production had the lowest greenhouse gas (GHG) emissions, water and fossil fuels consumption (8.29 kg CO2 eq (equivalent), 0.46 kg, and 105.42 MJ, respectively). The conversion process presented a greater environmental impact for all three bioenergy products. When producing 46,929 Mg of pellets, 223,380 MWh of electricity, and 78,000 barrels of pyrolysis oil, the net present values (NPV) indicated that only pellet and electricity production were profitable with NPVs of $1.20 million for pellets, and $5.59 million for biopower. Uncertainty analysis indicated that pellet production showed the highest uncertainty in GHG emission, and bio-oil production had the least uncertainty in GHG emission but had risks producing greater-than-normal amounts of GHG. Biopower production had the highest probability to be a profitable investment with 85.23%.

09 BIOMASS FUELS↗

Estimation of process steady state with autoregressive models and Bayesian inference

To improve efficiency, separations engineers will typically design process circuits containing recirculating streams, which mix one or more of the process outputs with the feed material. Doing so can improve efficiency, but will cause a delay in the system reaching steady state conditions until the recirculating load mass flows stabilize. In testing separation circuits, engineers will often test a variety of factors and complete an analysis from sample results. Knowledge of if a process is at steady state, as well as the steady state conditions of a process, is essential for a valid techno-economic analysis. However, the definition of process steady state is often poorly defined, or does not include uncertainty quantification. If the performance of a process operating under two different sets of conditions are compared, an engineer who does not test for steady state or quantify steady state conditions risks producing a faulty analysis. In this work, a Bayesian statistical method for testing if all streams are at steady state is further motivated and then derived. Then after testing for steady state, the same model is used with a prior distribution that enforces a steady state assumption to estimate steady state conditions. Further, these methods were validated in a solvent extraction pilot plant where steady state conditions for all outflows were inferred with uncertainty quantification. Analysis is completed with functions available to the reader as part of the BayesMassBal (V 1.1.0) software package written in R.

01 COAL, LIGNITE, AND PEAT↗

Automatic identification of edge localized modes in the DIII-D tokamak

Fusion power production in tokamaks uses discharge configurations that risk producing strong type I edge localized modes. The largest of these modes will likely increase impurities in the plasma and potentially damage plasma facing components, such as the protective heat and particle divertor. Machine learning-based prediction and control may provide for the automatic detection and mitigation of these damaging modes before they grow too large to suppress. To that end, large labeled datasets are required for the supervised training of machine learning models. We present an algorithm that achieves 97.7% precision when automatically labeling edge localized modes in the large DIII-D tokamak discharge database. The algorithm has no user controlled parameters and is largely robust to tokamak and plasma configuration changes. This automatically labeled database of events can subsequently feed future training of machine learning models aimed at autonomous edge localized mode control and suppression.

O’Shea, Finn H. (ORCID:0000000323987381)↗

Study of multi-kW solar arrays for Earth orbit application

Planar and concentrator solar array configurations based on silicon and gallium arsenide solar cells were conceptualized and on-orbit maintainability was addressed. Four basic categories emerged: (1) planar (non concentrated) with silicon cells, (2) low-CR (concentration ratio = 3.4) with silicon cells, (3) low-CR with GaAs, and (4) high-CR (concentration ratio = 62.5) with GaAs. A very high-CR (concentration ratio = 200) was investigated but rejected on thermal grounds. Nonrecurring and recurring cost elements for each of the four concepts selected were compared over a 15 year life cycle. Under conditions where the gallium arsenide cells can be produced for less than $25 per 2 x 2 cm, the low CR concentrator emerges as the most cost effective configuration. However, the producibility risk remains higher on the gallium arsenide cell.

Source record↗

Global cost and weight evaluation of fuselage keel design concepts

The Boeing program entitled Advanced Technology Composite Aircraft Structure (ATCAS) is focused on the application of affordable composite technology to pressurized fuselage structure of future aircraft. As part of this effort, a design study was conducted on the keel section of the aft fuselage. A design build team (DBT) approach was used to identify and evaluate several design concepts which incorporated different material systems, fabrication processes, structural configurations, and subassembly details. The design concepts were developed in sufficient detail to accurately assess their potential for cost and weight savings as compared with a metal baseline representing current wide body technology. The cost and weight results, along with an appraisal of performance and producibility risks, are used to identify a globally optimized keel design; one which offers the most promising cost and weight advantages over metal construction. Lastly, an assessment is given of the potential for further cost and weight reductions of the selected keel design during local optimization.

Flynn, B. W.↗

An Extreme-Value Approach to Anomaly Vulnerability Identification

The objective of this paper is to present a method for importance analysis in parametric probabilistic modeling where the result of interest is the identification of potential engineering vulnerabilities associated with postulated anomalies in system behavior. In the context of Accident Precursor Analysis (APA), under which this method has been developed, these vulnerabilities, designated as anomaly vulnerabilities, are conditions that produce high risk in the presence of anomalous system behavior. The method defines a parameter-specific Parameter Vulnerability Importance measure (PVI), which identifies anomaly risk-model parameter values that indicate the potential presence of anomaly vulnerabilities, and allows them to be prioritized for further investigation. This entails analyzing each uncertain risk-model parameter over its credible range of values to determine where it produces the maximum risk. A parameter that produces high system risk for a particular range of values suggests that the system is vulnerable to the modeled anomalous conditions, if indeed the true parameter value lies in that range. Thus, PVI analysis provides a means of identifying and prioritizing anomaly-related engineering issues that at the very least warrant improved understanding to reduce uncertainty, such that true vulnerabilities may be identified and proper corrective actions taken.

Everett, Chris↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

Applications and Performance of a Lightning Risk Assessment using Geostationary Lightning Mapper (GLM) Data

Lightning is a hazard globally, particularly in lesser-developed countries. Cloud-to-ground lightning strikes are a threat to human safety, motivating a desire to monitor location-based lightning risk to mitigate harm. A lightning risk assessment for human safety was created that uses a combination of probabilistic risk calculation and spatial lightning mapping data to produce a risk magnitude. This risk magnitude evolves with time and changing conditions and is compared to tolerability thresholds in order to evaluate safety. The risk assessment using lightning mapping array (LMA) flash extent density (FED) data was found to perform comparatively (with respect to issuing lightning warnings) to a more standard method of monitoring lightning safety where National Lightning Detection Network (NLDN) flashes were monitored within a 5 nautical mile radius of a location of interest. This research investigates the replacement of LMA FED with FED from the Geostationary Lightning Mapper (GLM) within the risk assessment framework. Using GLM FED would allow for risk to be calculated outside of LMA domains and anywhere within the GLM field of view, including areas outside of the United States (US). A few applications of the risk method with GLM FED are shown and discussed for locations both in and outside of the US. Additionally, the performance of the risk method is compared based on the type of lightning input source (LMA vs GLM). The end goal of this work is to provide forecasters and end users with a tool to help monitor lightning risk in decision support scenarios.

Kelley Murphy↗

Fitting a Model to Floating Gate Prompt Charge Loss Test Data for the Samsung 8 Gb SLC NAND Flash Memory

A recent model provides risk estimates for the deprogramming, of initially programmed floating gates, via prompt charge loss produced by an ionizing radiation environment. The environment can be a mixture of electrons, protons, and heavy ions. The model requires several input parameters. Parameters intended to produce conservative risk estimates for the Samsung 8 Gb SLC NAND flash memory are given, subject to some qualifications.

Edmonds, L. D.↗

Risk Reduction for the System Design of an Enhanced MMRTG

Engineering of an enhanced Multi-Mission Radioisotope Thermoelectric Generator (eMMRTG) began 3 years ago with agreement between the U.S. National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy (DOE). The Jet Propulsion Laboratory is leading the transfer of skutterudite thermoelectric couple technology to industry and leading the systems engineering of the proposed eMMRTG. Should NASA fund the flight development of an eMMRTG, the DOE would lead the flight system development. The analytical models and design of the MMRTG have been enhanced to use skutterudite couples developed at Jet Propulsion Laboratory over the last two decades. This required a thorough evaluation of the MMRTG design, and concurrent engineering of an enhanced MMRTG to shed light on potential design issues or risks. At the end of the U.S. fiscal year (FY) 2015, a complete catalog of risks was produced. Tests, hardware development, and analyses have now been put in place to mitigate those risks to acceptable levels. Few risks can ever be truly eliminated unless a design is modified to eliminate specific risks and not introduce more severe risks. The design imperative for the eMMRTG is to change only a few MMRTG features; therefore, risks can largely only be mitigated, not eliminated, through design changes. However, many risks can be effectively - though not totally - eliminated without design changes. This paper briefly describes some of the documented risks and mitigations or reduction approaches to be applied in the coming 3 years, on the way to completing the eMMRTG concept.

eMMRTG↗

Engineering Risk Assessment of Space Thruster Challenge Problem

The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

Assessment↗

Assessment and Control of Spacecraft Charging Risks on the International Space Station

Electrical interactions between the F2 region ionospheric plasma and the 160V photovoltaic (PV) electrical power system on the International Space Station (ISS) can produce floating potentials (FP) on the ISS conducting structure of greater magnitude than are usually observed on spacecraft in low-Earth orbit. Flight through the geomagnetic field also causes magnetic induction charging of ISS conducting structure. Charging processes resulting from interaction of ISS with auroral electrons may also contribute to charging albeit rarely. The magnitude and frequency of occurrence of possibly hazardous charging events depends on the ISS assembly stage (six more 160V PV arrays will be added to ISS), ISS flight configuration, ISS position (latitude and longitude), and the natural variability in the ionospheric flight environment. At present, ISS is equipped with two plasma contactors designed to control ISS FP to within 40 volts of the ambient F2 plasma. The negative-polarity grounding scheme utilized in the ISS 160V power system leads, naturally, to negative values of ISS FP. A negative ISS structural FP leads to application of electrostatic fields across the dielectrics that separate conducting structure from the ambient F2 plasma, thereby enabling dielectric breakdown and arcing. Degradation of some thermal control coatings and noise in electrical systems can result. Continued review and evaluation of the putative charging hazards, as required by the ISS Program Office, revealed that ISS charging could produce a risk of electric shock to the ISS crew during extra vehicular activity. ISS charging risks are being evaluated in ongoing ISS charging measurements and analysis campaigns. The results of ISS charging measurements are combined with a recently developed detailed model of the ISS charging process and an extensive analysis of historical ionospheric variability data, to assess ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA analysis (estimated frequency of occurrence and severity of the charging hazards) are then used to select the hazard control strategy that provides the best overall safety and mission success environment for ISS and the ISS crew. This paper presents: 1) a summary of ISS spacecraft charging analysis, measurements, observations made to date, 2) plans for future ISS spacecraft charging measurement campaigns, and 3) a detailed discussion of the PRA strategy used to assess ISS spacecraft charging risks and select charging hazard control strategies

Koontz, Steve↗

Cyber100 Compass [SWR 23-64]

Cyber100 Compass ("Compass") is a unique risk assessment framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. The idea for Compass was developed by NREL based on past work on high-renewable grids and a series of discussions with DOE. Compass is part of Cyber100, a portfolio of proposed research activities that would greatly expand understanding of cybersecurity for high-renewable grids. Compass is a desktop application designed with a user-friendly interface. The tool gathers information from users, conducts probabilistic backend calculations, and outputs a series of visualizations to help users understand and analyze their cybersecurity risks based on the unique features of their future grid. Compass will take as inputs the values for different conditions and produce a risk score of the resulting grid. By trying different configurations, system planners can compare the resultant risks against their own risk tolerance and decide which system-of-system controls to implement as they transition toward a 100% renewable grid.

Martin, Maurice↗

Accounting for Point Estimate Uncertainty in Space Systems Reliability and Risk Analysis

Understanding and accounting for uncertainty in risk analysis is a critical step in the management and communication of risk in engineered systems. The component and system-level analysis to determine the probability of a negative outcome and its consequence is often quantified by a point estimate. Many Program and Enterprise decisions involving technical concerns and issues rely on reliability engineering activities to produce quantified risk analysis to inform the decision making process. At NASA, it is common to use a Probabilistic Risk Analysis (PRA) to inform the overall risk to Loss of Mission or Loss of Crew that involves integration across all spacecraft subsystem fault trees to produce an overall probability of mission failure. The point estimate is an estimate of this overall probability and is an immediate result of a fault tree model. It is the result of a model where the probability of each event is taken to be equal to its mean. The value provides an approximation of the overall mean without running any uncertainty calculations (e.g., no sampling). Using only the point estimate can lead to a false sense of precision and the point estimate may not match the resulting mean when uncertainty is taken into consideration. This paper will explore five conditions that can cause the PRA model mean to diverge from the point estimate and will provide engineers and managers insight into the importance of understanding uncertainty in the elements of PRA models.

Paul J Collier↗

Quality Assurance Plan for Federal Guidance Report 16

Federal Guidance Report No. 16 will provide risk coefficients for use in projecting the probability of cancer morbidity or mortality from exposure to environmental radionuclides. The derivation of nuclide-specific risk coefficients involves multiple steps, with each step relying on the accuracy of the previous step as well as the numerical data utilized within each step. Thus, to ensure the quality of the derived risk coefficients, it is necessary to evaluate and confirm the quality and proper implementation of input data at each step of the derivation. The Oak Ridge National Laboratory (ORNL) dosimetry research team currently has two largely independent software codes for deriving radiation dose estimates, dose coefficients, and cancer risk coefficients for internally deposited radionuclides: DCAL and QCAL. The agreement of derived values based on alternate codes is an important step in quality assurance (QA) of the risk coefficients produced in this project. DCAL is an integration of the dosimetric software and numerical databases developed at ORNL over the past 25 years for the EPA’s Office of Radiation and Indoor Air (ORIA). QCAL was developed in 2015 to serve as a substitute for DCAL while DCAL was undergoing revision and to provide QA for the updated version of DCAL. The complex methodology employed in the derivation of cancer risk coefficients presents a challenge for QA, and as such, this report describes the QA steps used by the ORNL dosimetry team in this process as implemented in DCAL and QCAL for Federal Guidance Report No. 16.

61 RADIATION PROTECTION AND DOSIMETRY↗