Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Pre-Cloud Aerosol, Cloud Droplet Concentration, and Cloud Condensation Nuclei from the VAMOS Ocean-Cloud-Atmosphere Land Study (VOCALS) Field Campaign First Quarter 2010 ASR Program Metric Report

In this, the first of a series of Program Metric Reports, we (1) describe archived data from the DOE G-1 aircraft, (2) illustrate several relations between sub-cloud aerosol, CCN, and cloud droplets pertinent to determining the effects of pollutant sources on cloud properties, and (3) post to the data archive an Excel spreadsheet that contains cloud and corresponding sub-cloud data.

54 ENVIRONMENTAL SCIENCES↗

A Year of Radiation Measurements at the North Slope of Alaska Second Quarter 2009 ARM and Climate Change Prediction Program Metric Report

In 2009, the Atmospheric Radiation Measurement (ARM) Program and the Climate Change Prediction Program (CCPP) have been asked to produce joint science metrics. For CCPP, the second quarter metrics are reported in Evaluation of Simulated Precipitation in CCSM3: Annual Cycle Performance Metrics at Watershed Scales. For ARM, the metrics will produce and make available new continuous time series of radiative fluxes based on one year of observations from Barrow, Alaska, during the International Polar Year and report on comparisons of observations with baseline simulations of the Community Climate System Model (CCSM).

54 ENVIRONMENTAL SCIENCES↗

National Hurricane Program Metrics Framework

The need for metrics for planning and response measures was identified as key gap to be addressed in the National Hurricane Program's (NHP) Technology Modernization effort. This document proposes a framework for defining a set of metrics for planning and response that will be implemented in the NHP products of hurricane evacuation studies (HES) and post-storm assessments (PSA). To determine the feasibility of this framework, a survey of current HES and PSAs was carried out followed by and then used to determine if the proposed metrics are currently captured. While there is a wide variety in data availability and detail, the implementation of these metrics is not only feasible but presents an opportunity to improve on current practices. The final implementation of this framework shall require the ongoing feedback from local, state, tribal, and federal stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Cloud Occurrence Frequency at the Barrow, Alaska, ARM Climate Research Facility for 2008 Third Quarter 2009 ARM and Climate Change Prediction Program Metric Report

Clouds represent a critical component of the Earth’s atmospheric energy balance as a result of their interactions with solar and terrestrial radiation and a redistribution of heat through convective processes and latent heating. Despite their importance, clouds and the processes that control their development, evolution and lifecycle remain poorly understood. Consequently, the simulation of clouds and their associated feedbacks is a primary source of inter-model differences in equilibrium climate sensitivity. An important step in improving the representation of cloud process simulations is an improved high-resolution observational data set of the cloud systems including their time evolution. The first order quantity needed to understand the important role of clouds is the height of cloud occurrence and how it changes as a function of time. To this end, the Atmospheric Radiation Measurement (ARM) Climate Research Facilities (ACRF) suite of instrumentation has been developed to make the observations required to improve the representation of cloud systems in atmospheric models.

54 ENVIRONMENTAL SCIENCES↗

Time Series of Aerosol Column Optical Depth at the Barrow, Alaska, ARM Climate Research Facility for 2008 Fourth Quarter 2009 ARM and Climate Change Prediction Program Metric Report

The uncertainties in current estimates of anthropogenic radiative forcing are dominated by the effects of aerosols, both in relation to the direct absorption and scattering of radiation by aerosols and also with respect to aerosol-related changes in cloud formation, longevity, and microphysics (See Figure 1; Intergovernmental Panel on Climate Change, Assessment Report 4, 2008). Moreover, the Arctic region in particular is especially sensitive to changes in climate with the magnitude of temperature changes (both observed and predicted) being several times larger than global averages (Kaufman et al. 2009). Recent studies confirm that aerosol-cloud interactions in the arctic generate climatologically significant radiative effects equivalent in magnitude to that of green house gases (Lubin and Vogelmann 2006, 2007). The aerosol optical depth is the most immediate representation of the aerosol direct effect and is also important for consideration of aerosol-cloud interactions, and thus this quantity is essential for studies of aerosol radiative forcing.

54 ENVIRONMENTAL SCIENCES↗

A Retrospective Assessment of Correlation between Occupational and Public Radiation Protection Programs Performance Metrics at a FUSRAP Site - 17546

A retrospective assessment of the occupational and environmental radiation protection programs includes the consideration of performance metrics at the qualitative and quantitative level. When key radiation protection (RP) program metrics are tracked over the course of several years, correlations may present themselves. Strong correlations between variables may be considered when establishing or validating baseline RP Program elements (i.e., controls, monitoring regimes, and additional ALARA measures) for the safe excavation and handling of naturally occurring radioactive materials comingled in soil-like wastes at FUSRAP sites. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Metrics Evolution in an Energy Research & Development Program

All technology programs progress through three phases: Discovery, Definition, and Deployment. The form and application of program metrics needs to evolve with each phase. During the discovery phase, the program determines what is achievable. A set of tools is needed to define program goals, to analyze credible technical options, and to ensure that the options are compatible and meet the program objectives. A metrics system that scores the potential performance of technical options is part of this system of tools, supporting screening of concepts and aiding in the overall definition of objectives. During the definition phase, the program defines what specifically is wanted. What is achievable is translated into specific systems and specific technical options are selected and optimized. A metrics system can help with the identification of options for optimization and the selection of the option for deployment. During the deployment phase, the program shows that the selected system works. Demonstration projects are established and classical systems engineering is employed. During this phase, the metrics communicate system performance. This paper discusses an approach to metrics evolution within the Department of Energy's Nuclear Fuel Cycle R&D Program, which is working to improve the sustainability of nuclear energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sci-Fri AM: Quality, Safety, and Professional Issues 05: QC Program Management and the Benefits of QATrack+

Purpose: Treatment unit uptime statistics are typically used to monitor radiation equipment performance. The Ottawa Hospital Cancer Centre has introduced the use of Quality Control (QC) test success as a quality indicator for equipment performance and overall health of the equipment QC program. Methods: Implemented in 2012, QATrack+ is used to record and monitor over 1100 routine machine QC tests each month for 20 treatment and imaging units ( http://qatrackplus.com/ ). Using an SQL (structured query language) script, automated queries of the QATrack+ database are used to generate program metrics such as the number of QC tests executed and the percentage of tests passing, at tolerance or at action. These metrics are compared against machine uptime statistics already reported within the program. Results: Program metrics for 2015 show good correlation between pass rate of QC tests and uptime for a given machine. For the nine conventional linacs, the QC test success rate was consistently greater than 97%. The corresponding uptimes for these units are better than 98%. Machines that consistently show higher failure or tolerance rates in the QC tests have lower uptimes. This points to either poor machine performance requiring corrective action or to problems with the QC program. Conclusions: QATrack+ significantly improves the organization of QC data but can also aid in overall equipment management. Complimenting machine uptime statistics with QC test metrics provides a more complete picture of overall machine performance and can be used to identify areas of improvement in the machine service and QC programs.

60 APPLIED LIFE SCIENCES↗

Performance Monitoring Program: Developing Comparative Metrics for Fitness-for-Duty Programs

To comply with U.S. Nuclear Regulatory Commission (NRC) regulations, licensees and entities authorized under Title 10 of the Code of Federal Regulations (CFR) Part 26 Section 26.3 (§ 26.3) are required to have fitness-for-duty (FFD) programs. Under § 26.3, the expectation of these FFD programs is to provide reasonable assurance that individuals who are granted unescorted access to nuclear power reactor protected areas and Category I fuel cycle facility material control areas are trustworthy, will perform their tasks in a reliable manner, are not under the influence of any substance, legal or illegal, that may impair their ability to perform their duties, and are not mentally or physically impaired from any cause that can adversely affect their ability to safely and competently perform their duties. Pacific Northwest National Laboratory (PNNL) was tasked with developing a performance monitoring program to risk inform NRC inspection and policy regarding quantitative FFD performance data. To meet this need, PNNL developed methodologies that could be implemented within a performance monitoring program. Throughout this report, these methodologies are referred to as comparative metrics. The NRC provided PNNL with 2016–2019 data from annual reporting forms and single positive test forms provided by licensees and other entities. For most of the comparative metrics, the analyses required customized processing, such as creating filtering fields, adding data fields and summaries, and joining datasets. The comparative metrics developed include: random testing rate, random policy violation rate, pre-access policy violation rate, subversion attempt rate, and number of policy violations by labor category. The comparative metrics can be used for parsing and visualizing FFD program data and monitoring FFD performance at the labor category, facility, licensee, and industry levels to risk inform NRC inspection and policy with regard to the FFD data currently collected from licensees and other entities that implement Part 26 requirements. Furthermore, these developed comparative metrics allow a more in-depth look at the FFD programs for the industry to discern trends and patterns that may warrant changes at an industry level and to inform policy decisions. These analyses should be refreshed as new FFD data become available.

99 GENERAL AND MISCELLANEOUS↗

Overview of Mars Technology Program

This viewgraph presentation reviews the development of a technology program leading to Mars missions. The presentation includes: the goals of technology program, elements of technology program, program metrics, major accomplishments, examples and Information about the Mars Technology Program.

program metrics↗

Executive Summary of the Z Fundamental Science Program

The Z Fundamental Science (ZFS) Program is intended to provide access to the Z machine and its diagnostics for high energy density (HED) experiments in collaboration with a broad community of academic, industrial, and national laboratory research interests. ZFS experiments on the Z Facility focus on conducting fundamental research in HED science and help provide research experience necessary to maintain and grow the HED community, especially through involvement of researchers from academia. This report serves as an executive summary of the ZFS Program and provides a succinct synopsis of the history of the ZFS Program, metrics and impacts of the Program, as well as a brief list of the most impactful publications that have resulted from the various ZFS Projects relevant to laboratory astrophysics, plasma physics, and planetary physics.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Los Alamos National Laboratory Nuclear Material Management and Storage Program: Storage Health Metrics

The Strategic Materials Sustainment Program (SMSP) supports activities needed to manage the National Nuclear Security Administration’s (NNSA) inventory of strategic materials. As part of the SMSP, the Nuclear Material Management and Storage (NMM&S) program at the Los Alamos National Laboratory (LANL) is responsible for: (1) safe and secure storage of the SMSP strategic materials and others, (2) analysis, forecasting, and management of accountable nuclear materials; and (3) disposition of nuclear material through the Office of Nuclear Materials Integration (ONMI). The nuclear material management (NMM) mission is to ensure efficient nuclear material management lifecycle activities at LANL. The storage program function includes the management of storage capabilities across the site, supply chain management of nuclear materials, storage requirements integration, and nuclear container management (i.e., procurement, compliance, and safety). This report identifies key performance indicators (KPI) and describes the criteria and metrics used to assess the health of the storage component of the NMM&S program. “Health” is the ability of a process, system, facility, or program to safely and reliably accomplish its required mission. A health assessment provides timely identification of significant risks to enable mission performance. Significant risks identified are most effectively mitigated, avoided, or eliminated by evaluating and coordinating with stakeholders to specifically target, document, and often proceduralize strategies directed towards risk reduction. An effective health assessment involves status measurements of specific metrics that are tied directly to representative KPIs for a program. This document will baseline the KPI, criteria, and specific metrics that will be used to measure the “health” of the LANL Storage Program (i.e., NMM is not included).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computationally-Guided ODS Refractory HEAs via Additive Manufacturing

This document is the final report for ARPA-E ULTIMATE project DE-AR0001422. To achieve higher efficiency turbine operation, the RTX Technology Research Center (RTRC) explored the use of additive manufacturing (AM) to produce test specimens of novel high entropy alloys (HEA) enhanced with oxide dispersion strengthening (ODS). HEAs, with multiple principal elements, offer a vast alloy design space rich with unique properties especially enhanced solid solution strengthening. ODS alloys historically are some of the best performing materials for high temperature applications. Leveraging AM enables near net shape part production and incorporation of ODS into the alloy. Density, melting temperature, and elevated temperature strength properties of several novel HEA compositions were found to meet or exceed program targets; however, obtaining sufficient room temperature ductility in these alloys proved challenging. In order to obtain an alloy with sufficient ductility, the team explored more conventional refractory alloy compositions, focusing on a niobium based alloy. This inherently ductile alloy also satisfied program metrics for cost, density, and fracture toughness. Results showed the oxide dispersions increased high temperature strength, and improved creep resistance compared to the conventional alloy, though the program creep metric was not met. Further tuning of the alloy chemistry, and optimization of the oxide dispersion, is likely required to improve creep resistance.

36 MATERIALS SCIENCE↗

Low-Cost Electric Vehicle Batteries That Do Not Need a Heavy Protective Box.

ARPA-E’s RANGE (Robust Affordable Next Generation Energy Storage Systems) program funded high-risk research projects to change the way electric vehicle battery systems are built. The program is a success both in terms of individual projects and in reshaping the paradigm about energy storage as a whole to include system-level considerations. This was accomplished by setting very aggressive program metrics, by pushing the teams to advance their technology toward commercialization (through active program management), and by all of the effort the teams invested.

25 ENERGY STORAGE↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗